W911SD17B0020_amendment_0001.doc

DOC document 58 KB Posted

Attached to
Interior and Exterior Painting at various locations at the United States Military Academy, West Point NY
Solicitation number
W911SD17B0020
Issued by

About this file

W911SD17B0020 Amendment 0001

View the file

Other files

File Type Posted
W911SD17B0020_interior_and_exterior_paint_IDIQ_solicitation.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0029

The unit of issue has changed from Square Foot to Linear Foot.

CLIN 0030

The unit of issue has changed from Square Foot to Linear Foot.

CLIN 0034

The unit of issue has changed from Square Foot to Each.

CLIN 0035

The unit of issue has changed from Linear Foot to Each.

CLIN 0065

The unit of issue has changed from Square Foot to Linear Foot.

CLIN 0067

The unit of issue has changed from Square Foot to Linear Foot.

CLIN 0069

The unit of issue has changed from Square Foot to Each.

CLIN 0070

The unit of issue has changed from Square Foot to Hours.

CLIN 1029

The unit of issue has changed from Square Foot to Linear Foot.

CLIN 1030

The unit of issue has changed from Square Foot to Linear Foot.

CLIN 1034

The unit of issue has changed from Square Foot to Each.

CLIN 1035

The unit of issue has changed from Linear Foot to Each.

CLIN 1065

The unit of issue has changed from Square Foot to Linear Foot.

CLIN 1067

The unit of issue has changed from Square Foot to Linear Foot.

CLIN 1069

The unit of issue has changed from Square Foot to Each.

CLIN 1070

The unit of issue has changed from Square Foot to Each.

CLIN 2029

The unit of issue has changed from Square Foot to Linear Foot.

CLIN 2030

The unit of issue has changed from Square Foot to Linear Foot.

CLIN 3065

The unit of issue has changed from Square Foot to Linear Foot.

CLIN 3067

The unit of issue has changed from Square Foot to Linear Foot.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

QUESTIONS AND ANSWERS

Questions and Answers for solicitation W911SD-17-B-0020

1. Being an 8a firm, can we use an affiliate company in a teaming agreement as our company being the front runner prime contractor for this solicitation.

A: A teaming agreement would need to be sent to the SBA to ensure that it meets all 8a requirements prior to our being able to make an award. I would recommend that you speak to your SBA representative for guidance.

2. As an 8a firm as an option, can a joint venture be used for this solicitation if the prime contractor is an 8a firm.

A: A joint venture would need to be sent to the SBA to ensure that it meets all 8a requirements prior to our being able to make an award. I would recommend that you speak to your SBA representative for guidance.

3. Is it possible to conduct a site visit or obtain a site map of the structures referenced in the solicitation that would be detailed enough to determine things like the availability of power, requirement for scaffolding or elevated work, and other construction specific requirements?

A: There are not specified locations currently identified for this procurement. The CLINS allow for pricing for pricing requirements and coordination with the activity would be involved for each task order.

4. During all painting and prep do we need a full time QC Manager?

A: Yes

5. During all painting and prep do we need a full time Site Safety Officer ?

A: The site supervisor can also be safety officer as long as a procedure is submitted after award on how safety will be documented and maintained

6. During all painting and prep do we need a full time Supervisor ?

A: Should have a site supervisor on site at all times.

7. Will all work be performed during regular work day hours?

A: 0730-1630

8. Since this is an IDIQ, will the government award only one contract or will there be multiple awards?

A: The Government intends to award one contract.

9. Is this project fully funded?

A: Funding will be made available for each task order when it is placed.

10. Who is the current contractor performing theses services?

A: The previous contractor was Alamo City Constructors, Inc.

11. Can tell me more about the amount of anticipated Lead Abatement at the facility. Also what is your typical means of abatement?

A: Lead abatement will be a small percentage of overall task orders placed on this contract. Contractor will be responsible for determining best procedure to do the lead abatement and submit to COR before any work is accomplished

12. What is the amount of the performance and payment bond that will be required for the contract. Is it going to be based on individual task orders or will it be a lump sum amount based on the bid value.

A: Performance and payment bonds will be required on individual task orders in accordance with FAR clause 52.228-15. Each task order is considered a contract action and therefore if the task order exceeds $150,000 performance and payment bonds will be required for that order.

13. On page 290 of 362 of the documents, Section F - 52.228-5 - Insurance on a Government installation, the requirement for General liability is listed as $500,000,000 with a$ 1,00,000 per occurrence limit. Is that a typing error and should the General Liability be only$ 5,000,000 A: yes, that was a typo and it should be $5,000,000.

14. Line items 0036 & 0071 are identical. Is the specification different for the 2 item numbers

A: Line items (CLINS) 0071-0074 are for lead abatement. 0036 is for all other surfaces

15. Line items 0037 and 0072 are identical. Is the specification different for the 2 item numbers. Shouldn't the unit of measurement for 0037 be SF?

A: Line items (CLINS) 0071-0074 are for lead abatement. 0037 is for all other surfaces

16. Line items 0038 and 0073 are identical. Is the specification different for the 2 item numbers

A: Line items (CLINS) 0071-0074 are for lead abatement. 0038 is for all other surfaces

17. Line items 0039 and 0074 are identical. Is the specification different for the 2 item numbers.

A: Line items (CLINS) 0071-0074 are for lead abatement. 0039 is for all other surfaces

18. Line items 0029 & 0030 -Should the unit of measurement be listed as LF

A: yes

SECTION F - DELIVERIES OR PERFORMANCE

The following have been modified:

52.228-5 52.228-5 – Insurance On A Government Installation

The Contractor shall, at its own expense, provide and maintain during the entire performance period of this contract at least the following minimum insurance:

Workmen's Compensation coverage to comply with the statutory authority of the State of New York.

Employer’s liability coverage shall be in the minimum of $100,000.00.

General Liability: $5,000,000 with a $1,000,000 per occurrence limit.

Hired , not owned vehicle collision coverage of $1,000,000

Automobile Liability insurance shall not be less than $200,000.00 per person and $500,000.00 per occurrence for bodily injury and $20,000.00 per occurrence for Property damage. Where the Financial Responsibility or compulsory Insurance Law of New York requires higher limits, the Automobile Liability insurance policy shall provide coverage of at least these limits.

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.228-15
Performance and Payment Bonds--Construction
OCT 2010

The following have been deleted:

52.228-15
Performance and Payment Bonds--Construction
OCT 2010

(End of Summary of Changes)

File details come from the government source that posted it.