PERFORMANCE WORK STATEMENT
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 – Performance Work Statement Page 1 of 28
PERFORMANCE WORK STATEMENT (PWS)
PREVENTATIVE MAINTENANCE ROTARY COMPRESSORS BLDG 604 & 845
Part I
General Information
1. GENERAL: This is a non-personal services contract to provide Preventative Maintenance of Rotary Compressors Bldgs. 604 & 845. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor personnel.
1.1. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Preventative Maintenance of Rotary Compressors Bldgs. 604 & 845 as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services. The Contractor shall perform in accordance with (IAW) the terms and conditions of the contract and consistently with the established standards in this PWS and contract.
1.1.1. (Describe program goals, desired results to be achieved, interfaces that must be considered, and any previous problems that have been encountered (e.g., any known phenomena, techniques, methodology, or results of related work). Keep this section succinct and to the point.)
1.2. Background: Contractor provides all labor, equipment, materials and supervision necessary to perform preventative maintenance and emergency repair service on the Rotary Air Compressors, located at Bldg. 604 Central Power Plant and Bldg. 845 Laundry Plant in support of natural gas combustion for the purpose of generating steam heat for distribution to West Point buildings and selected quarters.
1.3. Objectives: The basic service objective includes the following:
1.3.1. Provide __
. Provide natural gas combustion to generate heat.
. Provide a maintenance service considered a lower cost alternative to failure or shut down of heat.
. Mission critical in the generation of steam heat for public bldgs..
1.3.2. Provide …
1.4. Scope: Services include
Preventive maintenance and emergency repair service on the Rotary Air Compressors. The Contractor shall accomplish
The Contractor shall perform preventive maintenance service during normal working hours (8:00 am - 4:00
pm) Monday thru Friday, excluding Federal Holidays.
Attachment 1 – Performance Work Statement Page 2 of 28
The Contractor shall coordinate date and time of scheduled preventive maintenance services with the Contract Monitor, Mr. Jim Christoff , (845)938-4047 a minimum of 10 days prior to anticipate service.
The Contractor shall provide 12 days of scheduled maintenance service. Service to be provided on a monthly schedule, one day each, per month.
The Contractor shall provide an additional 6 days of unscheduled maintenance service during the period of the contract. Contract Monitor will coordinate date and time of this unscheduled service.
The Contractor shall respond within 5 days of telephonic notification from the Contract Monitor for all unscheduled service.
The Contractor shall provide emergency repair service responding within 4 hours of telephonic notification from the Contract Monitor.
All maintenance and emergency repair services shall be performed by experienced, qualified service engineers.
The Contractor shall submit a written report to Mr.Christoff Maintenance Supervisor, Building 604, West Point, NY 10996 documenting all services performed, discrepancies noted, corrective actions taken and replacement parts required to the Contract Monitor within 10 days following the completion of all services.
The Contractor shall be required to provide service for, but not limited to, the following components:
A. Ingersall Rand Air Compressor #1 Model #: 30-HSP Serial #: K1-3386
B. Ingersall Rand Air Compressor #2 Model #: 30-HSP Serial #: K1-3387 C. Ingersall Rand Air Compressor #3 Model #: 40 UV4OH-SP Serial #: K9238U92309 D. Ingersall Rand Air Compressor #4 Model #: SSR-XF200 Serial #: FO641U90
The Contractor shall provide all parts necessary to perform maintenance and emergency services. This is not to exceed price of $5,000.00
1.5. Period of Performance: Base year shall be the period of one (1) 12 months and four (4) 12 month option periods
Base Year: Period of twelve (12) months.
Option Years: Four (4) 12 month Option Periods
1.6. General Information
1.6.1. Quality Control: Quality Control is the responsibility of the Contractor. The Contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1 Contractor Inspection Requirements).
1.6.1.1. Quality Control Program: The Government is committed to a highly interactive relationship between quality control by the Contractor and quality assurance by the government recipient of services. This relationship shall be achieved through an effective Prevention Based Quality Control Program dedicated to ensuring the best possible products and services to end
Attachment 1 – Performance Work Statement Page 3 of 28 users. The Contractor shall provide their final written Quality Control Plan (QCP) no later than (NLT) ten (10) days and within five (5) days of any proposed changed to the KO.
1.6.1.1.1. The Contractor’s quality program shall demonstrate its prevention-based outlook by meeting the objectives stated in the PWS throughout all areas of performance. The QCP shall be developed to specify the Contractor’s responsibility for management and quality control actions to meet the terms of the contract. The QCP as a minimum shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection;
discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies;
procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints.
1.6.1.1.2. Upon request from the COR, the Contractor shall provide, all reports generated as a result of the Contractor’s quality control efforts. This shall include any summary information used to track quality control, including any charts/graphs.
1.6.1.1.3. The Contractor’s QCP shall be incorporated into and become part of this contract after the plan has been accepted by the KO. Proposed changes made after KO acceptance shall be submitted in writing through the COR to the KO for review and acceptance prior to implementing any revision. The Contractor’s QCP shall be maintained throughout the life of the contract and shall include the Contractor’s procedures to routinely evaluate the effectiveness of the plan to ensure the Contractor is meeting the performance standards and requirements of the contract.
1.6.1.2. Contractor Discrepancy Report (CDR): When the Contractor's performance is unsatisfactory, a CDR will be issued. The Contractor shall reply in writing within five (5) work days from the date of receipt of the CDR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.
1.6.1.3. Quality Assurance: The COR will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the COR must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). When an observation indicates defective performance, the COR will require the Contractor or designated on-site representative to initial the observation to acknowledge the defective performance. The acknowledgement of the observation does not necessarily constitute Contractor concurrence with the observation, only that the Contractor has been made aware of the defective performance.
1.6.2. Property Management System: (Applicable for requirements in which Government Furnished Equipment/Property/Material will be furnished to the Contractor) The Contractor shall establish a system to manage Government Furnished Equipment (GFE) [Property (GFP);
Material (GFM)] in its possession to control, use, preserve, protect, repair and maintain. The Property Management System (PMS) must be adequate to satisfy the requirements of Property Management in accordance with (IAW) FAR clause 52.245-1 Government Property.
1.6.3. Recognized Federal Holidays: The Contractor is normally not required to perform services on recognized federal holidays. However, that requirement is subject to mission execution requirements. The Contractor shall not be required to perform services on recognized federal holidays. The recognized federal holidays include:
Attachment 1 – Performance Work Statement Page 4 of 28
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day Washington’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.3.1. When a holiday occurs on a Saturday, Federal employees are normally granted the previous Friday as the holiday observance. When a holiday occurs on a Sunday, Federal employees are normally granted the following Monday as the holiday. The contractor shall work on the days the Government is scheduled to work.
1.6.3.2. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor will have the following options:
1.6.3.2.1. Reschedule the work so it is performed the following day unless the following day falls on a weekend.
1.6.3.2.2. Reschedule the work on any day that is mutually satisfactory.
1.6.4. Hours of Operation: The Contractor shall be responsible for providing services, between the hours of 8:00 am – 4:00 pm, Monday through Friday, except federal holidays or when the government facility is closed due to local or national emergencies, administrative closings or similar government directed facility closings. For other than firm fixed price contracts, the Contractor will not be reimbursed when the government facility is closed for the above reasons.
The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential to successful performance under this contract. No overtime (OT) or compensatory time (CT) is authorized. Contractor personnel shall not exceed a 40 hour work week; flexible work schedule may be considered.
1.6.5. Place of Performance: (First sentence; IAW PARC Policy Alert 14-33, Homeland Security Presidential Directive 12 (HSPD-12) issued 31 Dec 13.)(If applicable) Contractor shall have routine access to Government-controlled facilities. The work to be performed under this contract shall be accomplished at the United States Military Academy, West Point NY.
1.6.6. Security Requirements: (If applicable) Contractor personnel shall have a [Insert the level of security required and who is required to have it; must match the requirement’s DD254. In some cases an interim is acceptable per DD254.] at time [Indicate by when (i.e., of the proposal submission; within 10 days of ___)], and must maintain the level of security required for the duration of the contract. The security requirements are in accordance with the attached DD254.
(The unit security monitor is responsible for initiating the DD254). Contractor personnel shall comply with all applicable security and safety regulations, guidance, and procedures, including local, referenced in this PWS and in effect at the work sites. All personnel must meet requirements IAW DODD 8570.
1.6.6.1. (Include details for 1.6.6) How to submit security clearance requests, 2) Exact office location, 3) Documents required, 4) include the applicable data systems, JPAS, eQuip, etc, and 5) the website. Ensure we provide them with sufficient Phase-In days to
Attachment 1 – Performance Work Statement Page 5 of 28 obtain clearance. The current process to apply for an industrial personal security clearance is as follows:
a. Originate the request through your Contractor Company Facility Security Officer (FSO) based on bona fide contractual occupational requirement. Individuals cannot apply for a personnel security clearance application on their own. The security clearance process begins when a company determines that an employee or candidate for employment requires a personnel security clearance to access classified information in order to perform the duties of his or her position. If the applicant has never held a personnel security clearance, or if their previous clearance was terminated more than 24 months ago, this is referred to as an initial clearance. The employee must complete an Electronic Questionnaire for Investigations Processing (e-QIP), signature pages and submit fingerprints electronically for all initial investigation requests.
b. Requests for clearances are sent to the Personnel Security Management Office for Industry (PSMO-I) which can issue interim clearances for industry personnel on behalf of the DoD and User Agencies under the National Industrial Security Program. The kind, or type, of investigation conducted depends on the access level that the individual is required to have to perform his or her official duties. For access to CONFIDENTIAL or SECRET information, a National Agency Check with Local Agency Checks and Credit Check (NACLC) is completed. For access to TOP SECRET or Sensitive Compartmented Information (SCI) information, a Single Scope Background Investigation (SSBI) is required.
Average Investigation timelines (days) for FY15 were as follows:
NACLC: 75
PHASE/SSBI -PR: 230
SSBI: 177
c. Upon the completion of the background investigation, DoD Adjudications Facilities adjudicates the case. The adjudicator considers the following factors when evaluating an individual's conduct:
1. The nature, extent and seriousness of the conduct
2. The circumstances surrounding the conduct, to include knowledgeable participation
3. The frequency and recency of the conduct
4. The individual's age and maturity at the time of the conduct
5. The extent to which participation is voluntary.
6. The presence or absence of rehabilitation and other permanent behavioral changes
7. The motivation for the conduct
8. The potential for pressure, coercion, exploitation, or duress; and
9. The likelihood of continuation or recurrence of the conduct Each case is judged on its own merits and the final determination is the responsibility of the specific department or agency that adjudicates the clearance eligibility. Any doubt regarding whether access to classified information is clearly consistent with national security must be resolved in favor of national security.
d. Personnel Security Clearances must be kept to an absolute minimum based on contractual needs; for more information please visit http://www.dss.mil/psmo-i/indus_psmo-i_process_applicant.html.
Attachment 1 – Performance Work Statement Page 6 of 28
e. Safeguarding For Official Use Only (FOUO) Information. During normal duty hours, the Contractor shall place information determined to be FOUO in an out-of-sight location, if visitors, casual traffic, and other non- Government/Non-Contractor personnel have access to the work area. During non-duty hours and at the close of business, the Contractor shall store FOUO records, so as to preclude unauthorized access. The transmission, termination of, and disposal of, FOUO documents will be consistent with Army Regulations (AR) 380-5, Protection of FOUO, Information and Installation Policy.
f. Network Access. Contractor personnel requiring access to Government-owned computer networks must obtain the proper background level of investigations, with favorable results, at the Contractor’s expense, prior to being issued a user identification and password IAW AR 380-67 and AR 380-5. Additionally, Contractor employees and associated subcontractor employees must complete the DoD IA, Information Awareness training, before issuance of network access, and annually thereafter.
g. Accounting for Common Access Cards (CACs) for Contractor Personnel Departing
CAC Issuance and Revocations: DoDI 5200.46, September 9, 2014
A CAC will not be issued (or maintained) by a person if there is a reasonable basis to believe, based on the individual’s criminal or dishonest conduct, that issuance of a CAC poses an unacceptable risk.
a. An individual’s conduct involving questionable judgment, lack of candor, dishonesty, or unwillingness to comply with rules and regulations can raise questions about his or her reliability or trustworthiness and may put people, property, or information systems at risk. An individual’s past criminal or dishonest conduct may put people, property, or information systems at risk.
b. Therefore, conditions that may be disqualifying include:
(1) A single serious crime or multiple lesser offenses which put the safety of people at risk or threaten the protection of property or information. A person’s convictions for burglary may indicate that granting a CAC poses an unacceptable risk to the U.S. Government’s physical assets and to employees’ personal property on a U.S. Government facility.
(2) Charges or admission of criminal conduct relating to the safety of people and proper protection of property or information systems, regardless of whether the person was formally charged, formally prosecuted, or convicted.
(3) Dishonest acts (e.g., theft, accepting bribes, falsifying claims, perjury, forgery, or attempting to obtain identity documentation without proper authorization).
(4) Deceptive or illegal financial practices such as embezzlement, employee theft, check fraud, income tax evasion, expense account fraud, filing deceptive loan statements, or other intentional financial breaches of trust.
(5) Actions involving violence or sexual behavior of a criminal nature that poses an unacceptable risk if access is granted to federally-controlled facilities and federally-controlled information systems. For example, convictions for sexual assault may indicate that granting a CAC poses an unacceptable risk to the life and safety of persons on U.S. Government facilities.
Attachment 1 – Performance Work Statement Page 7 of 28
(6) Financial irresponsibility may raise questions about the individual’s honesty and put people, property or information systems at risk, although financial debt should not in and of itself be cause for denial.
(7) Deliberate omission, concealment, or falsification of relevant facts or deliberately providing false or misleading information to an employer, investigator, security official, competent medical authority, or other official U.S. Government representative, particularly when doing so results in personal benefit or which results in a risk to the safety of people and proper safeguarding of property and information systems."
Compliance with HSPD-12: On 07 Mar 14 the Secretary of the Army published Army Directive 2014-05, which establishes HSPD-12 investigative and adjudicative policy and procedures to support credentialing determinations for the issuance of CACs to eligible Army Contractor personnel. HSPD-12 mandates a Government wide standard for secure and reliable forms of identification issued by the Federal Government for physical access to federally controlled facilities and/or logical access to federally controlled information systems. The CAC is the DoD federal personal identity verification credential.
The purpose of security screening is to ID those persons who may pose a threat to good order and discipline on Fort Bragg by either denying them access or placing restrictions on their movement.
The following criteria will be used as a guideline for determining denial of access to Fort Bragg:
(1) (U) Any record of a felony conviction for a crime (includes murder, rape, sale of illegal drugs, grand theft, arson, and kidnapping).
(2) (U) Three or more misdemeanor convictions within the past five years (includes assault, theft of $500 or less, and excludes traffic violations).
(3) (U) VCC personnel will NOT relay the source of the information to the visitor (e.g.
visitors will not be told that the information comes from the Bars and Suspension List or from NCIC screening). Subjects are not authorized to view the information under any circumstances.
(4) (U) The SC is the final approval authority for any adjudication request for access denial.
If CTRs meet access control standards of Army Directive 2014-05 (Policy and Implementation for Common Access Card Credentialing and Installations Access for Uncleared Contractors, dated 7 Mar 14) then DoD Consolidated Adjudications Facility (CAF) will conduct centralized adjudications of favorable HSPD-12 background investigations. The DoD CAF will forward investigations that cannot be favorably adjudicated to the Defense Office of Hearings and Appeals (DOHA) for a final credentialing determination. The Contractor shall complete the Updated Personal Identity Verification of Contractor Personnel for Common Access Cards (CACs) form contained as Technical Exhibit H which will be provided to the COR NLT the 10th day of each month.
The Contractor shall immediately report any lost CAC or Government issued identification cards to the COR and Military and/or DoD police agencies. The Contractor shall immediately collect the CAC and other Government issued forms of identification upon termination of employee, or at the end of the contract performance period. The CAC and other Government issued forms of identification shall be returned to the COR within one (1) hour of employee termination, or at the end of contract performance period, whichever comes first. Final payment may be delayed if Contractor fails to comply with these requirements.
Attachment 1 – Performance Work Statement Page 8 of 28
(1) In the event a contractor employee separates without advance notice (either quits or is terminated), the contractor shall immediately notify the Trusted Agent (TA) who will ensure CAC permissions are revoked the same day. In various instances a contractor employee may not be on task (working) due to furloughs, suspensions pending the outcome of an investigation, or the contract reaches the end of the period of performance (POP) and renewal is anticipated but not yet complete. During these occurrences, the TA or a representative from the contractor (TA’s choice) will collect and retain the CACs of the affected contractor personnel residing in the local area however; CAC permissions will not be revoked in the Trusted Associate Sponsorship System (TASS). Collecting CACs however, may not be feasible for contractor personnel located in remote locations. When contractor personnel return to work under the contract, they will retrieve their CAC from the responsible party who collected it.
(2) The contractor shall include a monthly report listing contractor employees who departed during the previous month and the date their CACs were turned in using the format listed below.
Employee Name
Contract Number
TO
Number
Company Name
Office Symbol
TA
Name
Terminatio n Date
Date CAC returned to RAPIDS Site
Remarks
Physical Security Plan. This portion of the Contractor’s security program shall address physical security aspects associated with contract performance and describe how the Contractor shall prevent unauthorized access, vandalism, pilferage, larceny, sabotage, and arson directed toward Contractor-controlled facilities and Government Furnished Property (GFP). The following regulations shall apply when developing the physical security plan: ARs 190-11, 190-13, and 190-51; Department of Defense (DOD) 4500.9-R, and Department of Defense Instruction (DODI) 5100.76 and DODI 5220.22, and applicable Fort Bragg regulation or policies. The Contractor shall develop and implement a physical security plan in accordance with AR 190-13.
Key Control. The Contractor shall include in the physical security section of the Contractor’s security program a key control plan IAW applicable regulations, policies and directives ensuring keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The key control plan shall include requirements of AR 380-5, Fort Bragg 380-5 and FORSCOM Supplement 1 to AR 380-5, if classified materials are being stored.
NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. Such procedures shall include turn-in of any issued keys by
Attachment 1 – Performance Work Statement Page 9 of 28 personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the COR.
In the event keys are lost or duplicated, the Contractor shall, upon direction of the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.
The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the KO.
Lock Combinations. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s security program.
Information Security Plan. The Contractor shall develop and implement an Information Security Plan IAW AR 380-5 AR 380-67, Fort Bragg (FB) 380-5, FB 380-67, and FORSCOM Supplement 1 to AR 380-5, for the control of classified information. The Contractor’s information security program shall include applicable provisions of AR 380-series regulations.
National Industrial Security Program (NISP). The Contractor shall implement and maintain a security program for control of personnel, property, and information, including, unclassified and classified materials, documents, and records. Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “Confidential,” “Secret,” or “Top Secret” and requires Contractors to comply with—(1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); any revisions to DOD 5220.22-M, notice of which has been furnished to the Contractor. In addition, the Contractor’s security program shall include provisions for, but not limited to:
--Initial and Annual Operations Security (OPSEC) awareness training IAW AR 530-1.
--Receiving, storing, disseminating, transmitting, transporting, and protecting items classified as CONFIDENTIAL or SECRET by the Government, including the use of courier cards.
--In-processing and out-processing Contractor personnel for security matters.
--Obtaining Contractor personnel security clearances.
--Documenting and reporting actual and potential security problems.
--Initiating proper procedures to correct documented problems and implementing corrective procedures in the Contractor's security program.
--Filing Classified Documents. All Government-furnished classified and unclassified files in existence at the contract performance start date and those generated under this contract shall be maintained in accordance with AR 25-400-2 or other applicable regulations. Files shall be transferred to the KO or designated representative upon completion of the contract period or last day of contract performance, whichever comes first. Such files are the property of the U.S.
Attachment 1 – Performance Work Statement Page 10 of 28
Government. The Contractor shall provide security of classified documents in accordance with AR 380-5 and DOD 5200.1-R, NISP Operating Manual.
1.6.7. Special Qualifications. (Include only those that apply, add special qualifications, and limit to ‘minimum’ bona fide needs (DO NOT include unnecessary or excess qualifications/requirements – ultimately, tailor to your specific requirement).
1.6.7.1. General: (This subsection is applicable to ALL Contractor personnel).
1.6.7.1.1. The Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current certifications as indicated in PWS [1.6.6.]; security requirements during the execution of this contract.
1.6.7.1.2. Contractor personnel performing work under this contract shall be able to read, write, speak, and understand the English language to effectively carry out all contract requirements.
They shall have a command of both the written and spoken English language to properly clearly, and effectively communicate in person or via electronic devices (telephone or Email) with co-workers, customers, and the general public.
1.6.7.1.3. Contractor personnel performing work under this contract shall be U.S. citizens unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed and approval has been granted by the Government for the non-U.S. citizen to perform the required support.
1.6.7.1.4. (If applicable- key word is ‘Technician’) Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current Information Assurance Technician (IAT) Level I professional certification during the execution of this contract.
1.6.7.1.5. Access and General Protection/Security Policy and Procedures: (if applicable) All Contractor personnel performing work under this contract shall comply with applicable installation, facility and area commander installation/facility access, local security policies and security procedures provided by the Security Manager Government representative. Contractor personnel shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor personnel shall comply with all personal identity verification requirements as directed by Department of Defense (DoD), HQ Department of Army (DA) or local policies. Sponsoring organizations, activities, and persons will be responsible for monitoring contractor access by submitting a completed and approved DES Form 118 to the Installation All American VCC, detailing the contracted services to be performed, location of services, and duration of the contract. Contractors requesting access for less than one year may receive an AIE visitor card on a case by case basis, or a temporary vehicle pass for 90 days. Contractor cards will be issued for periods of one to three years depending on the terms of their contract. AIE card expirations may be updated to reflect a new contract period by submitting an approved DES Form 118 to the All American VCC. Renewed short term passes must be re-processed at the All American VCC. In addition to the changes otherwise authorized by this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor and subcontractor security matters or processes.
Attachment 1 – Performance Work Statement Page 11 of 28
1.6.7.1.5.1. (PARC Policy Alert 14‐33, Homeland Security Presidential Directive 12 (HSPD‐12) issued 31 Dec 13: At a minimum, work statements must address the following. If not, KOs must address this with requiring activities and security officials:
How the contractor will comply with HSPD-12 standards;
1.6.7.1.6. (if applicable) Anti-Terrorism Program
1.6.7.1.6.1. (At a minimum the following needs to be incorporated IAW PARC Policy Alert 14‐33, Homeland Security Presidential Directive 12 (HSPD‐12) issued 31 Dec 13. If not, KOs must address this with requiring activities and security officials) [Indicate how the contractor will comply with HSPD-12 standards]
1.6.7.1.6.1. Anti-Terrorism (AT) Level I Training: Contractor personnel performing work under this contract that require access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after commencing performance under this contract. The Contractor shall submit employee certificates of completion within 30 calendar days after completion of the training. AT Level I awareness training is available at the following website: https://atlevel1.dtic.mil/at
1.6.7.1.7. (if applicable) iWATCH Training: The Contractor shall brief all personnel performing work under this contract on the local iWATCH program [training standards provided by the requiring activity Anti Terrorism Office (ATO)]. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award with the results reported to the COR NLT 45 calendar days after contract award.
New employees shall complete the training within 10 calendar days of commencing performance of work under this contract.
1.6.7.1.8. (if applicable; IAW PARC Policy Alert 14-3, Homeland Security Presidential Directive 12 (HSPD-12) issued 31 Dec 13; indicate if there is a required National Agency Check with Inquires clearance or higher)Contractor personnel shall have a favorable National Agency Check (NACI) with inquiry in accordance with Security definition for personnel who occupy “ADP (Automated Data Processing) Sensitive” positions, as per AR 380-67, paragraph 3-601, “The Personnel Security Program” no later than (indicate by when).
1.6.7.1.9. (if applicable) Contractor Employees Requiring Access to Government Information Systems: (First sentence; IAW PARC Policy Alert 14-3, Homeland Security Presidential Directive 12 (HSPD-12) issued 31 Dec 13) Contractor shall have access to Government-controlled information systems during performance of work under this contract. All contractor employees and associated subcontractors who require access to a government information system shall be registered in the ATCTS (Army Training Certification Tracking System) at commencement of support services, and must successfully complete the DoD Information Assurance Awareness prior to access to the information systems. Training shall be required annually after the initial training. Completion certificates shall be submitted to the COR within fifteen (15) calendar days from date of commencing performance under this contract.
1.6.7.1.10. (if applicable) OPSEC Training: Per AR 530-1, Operations Security, new contract employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter.
Attachment 1 – Performance Work Statement Page 12 of 28
1.6.7.1.11. (if applicable) Information assurance (IA)/information technology (IT) training: The Contractor employees working IA/IT functions shall comply with DoD and Army training requirements in DoDD 8570.01, DoDD 8570.01-M and AR 25-2 within 180 days of employment.
1.6.7.2. Other Qualifications: (Limit to minimum bona fide requirements. Qualifications and experience for the Program Manager and Alternate Program Manager are listed separately under PWS subsection for Key Personnel). [Indicate if you have specific positions that require specific qualifications, experience, training, certifications, or degrees; however, ensure requirements are not overly restrictive or written to mirror the credentials of incumbent Contractor staff. If degree is required, indicate what discipline a degree must be in and if a substitution for degree requirement is authorized – state what it is].
1.6.7.2.1. [Position]: [Qualifications][Experience][Training][Certifications][Degree & Discipline][Substitutions]. (Do not ask for resume.)
1.6.7.2.2. [Position]: [Qualifications][Experience][Training][Certifications][Degree & Discipline][Substitutions].
1.6.8. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The post award conference will also be utilized to ensure contractor understands all HSPD-12 requirements. The KO, COR (and other government personal) will hold a quarterly progress meet with the Contractor to review the Contractor's performance. At these meetings the KO and COR will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.9. Contracting Officer Representative (COR): The COR will be identified by separate letter of appointment. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: Assures that the Contractor performs the technical requirements of the contract; performs inspections necessary in connection with contract performance; maintains written and oral communications with the Contractor concerning technical aspects of the contract; issues written interpretations of technical requirements, including government drawings, designs, specifications; monitors Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinates availability of government furnished property, and provides site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.
1.6.10. Key Personnel: Key personnel shall not be added to or removed from the contract without express acknowledgement of the COR. Any changes to the working status of these key personnel shall be transmitted (in writing) to the KO/COR within ten (10) work days of the proposed change. If, for any reason, any of the key personnel becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days the contractor shall promptly replace personnel with personnel who possess qualifications equal to or better than that of the original employee. The Contractor shall ensure all key personnel
Attachment 1 – Performance Work Statement Page 13 of 28 terminated or released from employment under this contract are replaced within ten (10) work days of the termination.
1.6.10.1. The follow are considered key personnel by the Government: The Contractor shall provide a Program Manager (PM) who shall be responsible for the performance of the work under this contract. The name of this person, and an Alternate PM (APM), who shall act for the Contractor when the PM is absent, shall be designated in writing to the KO at the post award conference The PM or APM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The PM or APM shall be available between the hours of 8:00 AM to 4:00 PM, Monday through Friday, except federal holidays or when the government facility is closed for administrative reasons
1.6.10.2. Qualifications for all Key Personnel: (Insert below the minimum bona fide qualifications for all key personnel if necessary to ensure quality contract services. Ensure requirements are not overly restrictive or written to mirror the credentials of incumbent Contractor staff. A PM is typically the only key personnel that is required.)
1.6.10.2.1. Program Manager (PM): The PM shall meet or exceed the following minimum qualifications: [Include minimum qualifications, training, and experience requirements that are reasonable, relevant, and realistic. They should be specific enough to facilitate evaluation (i.e., The PM shall have a Bachelors Degree in Business Management; 15 years of management experience; and familiarity with …)]. [Indicate if substitution for a degree is allowed]. The APM shall meet or exceed the same qualifications as the PM.
1.6.10.2.2. (Add titles of other key personnel if needed. Limit number of identified/specified key personnel to those Contractor positions that require highly specific skill, experience, or training and are truly essential for the successful accomplishment of work under the contract. Refrain from characterizing an excessive number of positions as key personnel).
1.6.11. Contractor Personnel: (This subsection applies to ALL Contractor personnel).
1.6.11.1. Identification of Contractor Personnel: All Contractor personnel attending meetings, answering government telephones, and working in other situations where their Contractor status is not obvious to third parties, are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials. (The following is IAW PARC Policy Alert 14-33, Homeland Security Presidential Directive 12 (HSPD-
12) issued 31 Dec 13. Ensure FAR 52.204-9 is included in solicitation/contract).[Indicate whether the purchase consists only of Federal Information Processing Standard (FIPS) Publication (PUB) 201 compliant products and service components (FAR 4.1302(c)]
1.6.11.1.1. [Indicate if Contractor personnel will be required to obtain and wear badges in the performance of this service]. All Contractor personnel performing work under this contract shall obtain a Department of Defense (DoD) Common Access Card (CAC). [Indicate other government issued identification badges (i.e., DD Form 1466 Building Pass, DoD or FORSCOM/USARC Access badge)] The CAC [indicate other identification badges] shall be worn at all times, when performing work under this contract, to include attending government meetings and conferences. Unless otherwise specified in the contract, Contractor personnel shall wear the [indicate identification badges] in a conspicuous place on the front of exterior clothing and above the waist, except when safety or health reasons prohibit such placement or when being used for computer access.
Attachment 1 – Performance Work Statement Page 14 of 28
1.6.11.1.2. Contractor personnel shall be required to obtain a CAC at least ten (10) work days prior to start of base contract period and NLT prior to performance under this contract, whichever comes first.
1.6.11.1.3. The Contractor shall develop, maintain, and provide to the COR an updated roster which shall include names and positions of all Contractor personnel as well as indicating which employees were issued CAC or other forms of government identification cards. The Contractor shall submit initial roster to the COR within ten (10) calendar days after commencement of base period of performance.
1.6.11.1.4. The Contractor shall immediately report any lost CAC or government issued identification cards to the COR and Military and/or DoD police agencies. The Contractor shall immediately collect the CAC and other government issued forms of identification upon termination of employee, or at the end of the contract performance period. The CAC and other government issued forms of identification shall be returned to the COR within one (1) hour of employee termination, or at the end of contract performance period, whichever comes first. (The following is IAW PARC Policy Alert 14-33, Homeland Security Presidential Directive 12 (HSPD-12) issued 31 Dec 13.) Final payment may be delayed if Contractor fails to comply with these requirements.
1.6.11.2. Contractor Personnel Appearance and Performance: It is essential that all Contractor personnel meet the highest standards of professionalism and personal integrity. The Contractor shall ensure their personnel do not perform work under the influence of alcohol, illegal prescribed drugs or any other incapacitating agents. Contractor personnel shall be neatly groomed and dressed in business casual attire to present a professional appearance at all times.
1.6.12. Contractor Travel: (If applicable) Contractor shall be required to travel CONUS during the performance of this contract to attend [i.e., meetings, conferences, and training]. The Contractor may be required to travel to [off-site training locations and to ship training aids to these locations] in support of this contract. (The following language is required if Contractor travel is authorized). Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR), FAR 31.205-46, and the limitation of funds specified in this contract. All travel requires advanced approval/authorization by the COR [state when, number work days prior to requested travel date, format, and method for requesting approval/authorization]. (NOTE: For proposal purposes, a Not-to-Exceed amount can be established based on your Independent Government Cost Estimate (IGCE) for travel cost. Travel cost can be based on historical information, projected workload and projected listing of travel locations to include frequency and number of persons required to travel).
1.6.12.1. (If applicable) Travel Templates. The Contractor shall produce a long distance travel request template, local travel log template, and a long distance trip report template. The templates shall be submitted to the COR within ten (10) days after contract award for approval.
The long distance travel request template shall include, at a minimum: Name, duty position, justification for travel, mode of travel, distance of travel, estimated time of travel, and POC of travel at the support site.
1.6.12.1.1. The Local Travel Log template shall include, at a minimum: Name, duty position, reason for travel, key personnel assisted (name, position, and phone number), significant activities accomplished during visit, follow-up requirements, recommendations/comments and signature block.
Attachment 1 – Performance Work Statement Page 15 of 28
1.6.12.1.2. Long Distance Trip Report. Upon completion of long distance travel, a Long Distance Trip Report is required. Trip Reports shall be provided to COR within five (5) work days after travel has been completed. Additionally, all trip reports for the month will be rolled up into the monthly TSR. This report shall be submitted on the approved template and provide a synopsis of accomplishments performed during the travel period. The Contractor shall submit monthly invoices for reimbursement citing the appropriate CLIN. Each individual travel instance must be captured; copies of receipts, travel vouchers, etc. shall be attached to the invoice to support charges. Original receipts shall be maintained by the Contractor and made available to Government auditors upon request.
1.6.12.1.2.1. The long distance trip report template shall include at a minimum: Travelers name, position, reason for travel, mode of travel, duration of travel, destinations, organization visited, key personnel assisted (name, position, and phone number), significant activities accomplished, systems involved, discussion background, follow-up requirements, recommendations/ comments, and signature block.
1.6.13. Other Direct Costs (ODC): (If applicable) Contract ODCs include [i.e., reproduction, shipping,] that are associated with [i.e., meetings, conferences, and training] IAW PWS [i.e., 5.#.#]. (NOTE: ODCs can be established based on your IGCE for ODCs. ODCs can be based on historical information and projected workload). The Contractor shall submit requests for ODCs (other than travel) to the COR via [state method and format] at least [state how many/ number of] work days prior to need date [or state other time]. Contractor shall ensure all ODCs are pre-approved by the COR prior to expenditure of funds. Invoice submitted through Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT) must clearly identify the specifics of the costs (e.g., who, what, where, when).
1.6.14. Data Rights: (If applicable) The government has unlimited rights to all documents/material produced under this contract to the extent permitted by the data rights clauses. The parties mutually acknowledge their understanding that this is the government’s intent. All documents and materials, to include the source codes of any software, produced under this task order shall be government owned and are the property of the government with all rights and privileges of ownership/copyright belonging exclusively to the government. These documents and materials may not be used or sold by the contractor without written permission from the contracting officer.