W911SD-21-R-0156 PWS USMAPS LED Conversion.pdf
PDF 107 KB Posted
- Solicitation number
- W911SD-21-R-0156
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
USMAPS Bubble Lights Replacement
1.0 SCOPE
This Statement of Work (SOW) describes the support functions required to replace the lighting system in the indoor athletic field (the Bubble) at the United States Military Academy Preparatory School (USMAPS). The work under this purchase order will be performed in the Bubble at USMAPS. Once work is complete, the lighting system in the Bubble will be ready for immediate use.
2.0 APPLICABLE DOCUMENTS
Applicable military standards, specifications, or other documents may be specified in individual orders for specific tasks under this contract.
3.0 REQUIREMENTS
The Contractor shall, as specified in the purchase order, furnish the required personnel, materials, equipment, test instrumentation, and analysis equipment to ensure that lighting system in the Bubble at USMAPS is properly upgraded and ready for immediate use.
3.1 Remove Existing Light Fixtures: The contractor shall provide the manpower and equipment required to remove all existing light fixtures, protective coverings, and halogen bulbs.
3.2 Dispose of Existing Light Fixtures: The contractor shall provide all manpower, equipment, packaging, and transportation assets to remove the existing light fixtures, protective coverings, and halogen bulbs from the USMAPS footprint and dispose of them in accordance with applicable environmental regulations.
3.3 Install New LED Light Fixtures: The contractor shall provide all manpower, equipment, and materials to install new LED light fixtures and LED bulbs in the USMAPS Bubble.
3.4 Dispose of All Packaging from New LED Lighting System: The contractor shall provide all manpower, equipment, and transportation assets to remove all packaging and dunnage from the USMAPS footprint and dispose of them in accordance with applicable environmental regulations.
3.5 Update Lighting System Switches/Controls: The contractor shall provide all manpower, equipment, materials, and test instrumentation to install new switches/controls required to operate the new LED lighting system in the Bubble.
3.6 Conduct Functions Check: The contractor shall provide all manpower, equipment, materials, and test instrumentation to test the new LED lighting system in the Bubble and ensure it is fully mission capable.
File details come from the government source that posted it. Updated .