Performance Requirement

PWS

Section

Performanc e Standard

Allowable Deviation

Method of Surveillance

Frequency

Service Improved Grounds

a. Mow

b. Edge

c. Trim

d. Debris

Removal

e. Weed Control High Visibility Improved Grounds

f. Planter Beds

g. Leaves and Storm Debris High Visibility Grounds

h. Irrigation

Attachmen t A, Paragrap h 2.2.1- 2.2.8

Complete each particular task within the month IAW the

PWS.

Contracto r shall meet performan ce on 95% of the improved grounds according to contract requireme nts in a month.

Periodic sampling and with customer complaints.

Weekly

Broad Leaf Control

Attachmen t A, Paragraph 2.2.9

Complete each particular task within the month IAW the PWS.

Contracto r shall meet performan ce on 95% of the improved grounds according to contract requireme nts in a month.

Periodic sampling and with

Leaves and Storm Debris

Attachmen t A, Paragrap h 2.2.10

Complete this task within 72 hours after services are ordered IAW the PWS.

Contracto r shall complete at least 90% of the areas leaf/debris free within 72 hours.

Periodic sampling and with

Tree Service / Maintenanc e

Attachmen t A, Paragrap h 2.2.11.1

Complete this task within 5 days after services are ordered IAW the PWS.

Contracto r shall complete at least 95% of the area serviced within 5 days after order is placed.

Periodic sampling and with

Tree & Stump Removal

Attachmen t A, Paragrap h 2.2.11.2

Complete this task within 5 days after services are ordered IAW the PWS.

Contractor shall complete at least 95% of the area serviced within 5 days after order is placed.

Periodic sampling and with

Service / Maintenanc e Shrubs / Hedges / Plants

Attachmen t A, Paragraph 2.2.12.1

Complete this task within 5 days after services are ordered IAW the PWS.

Contractor shall complete at least 95% of the area serviced within 5 days after order is placed.

Periodic sampling and with

Additional Services

Attachmen t A, Paragrap h 2.2.13.1

Complete this task within 5 days after services are ordered IAW the

PWS.

Contractor shall complete at least 95% of the area serviced within 5 days after order is placed.

Periodic sampling and with

After each service

Fire brakes /Ranges / Ammunition Supply Post

Attachmen t A, Paragrap h

Complete each particular task within the month IAW the

PWS.

Contractor shall meet performan ce on 98%

Periodic sampling and with

2.2.14 of the improved grounds according to contract requiremen ts in a month.

Contractor Manpower Reporting

(CMR)

PWS,

Paragrap h 3.3

Complete this task no later than the 31st of October each contract year.

Shall be percent complete.

100% Annually