INDEX-1
PART IV SPECIFICATIONS
REPAIR/REPLACE ASPHALT SURFACES at FORT LEONARD WOOD, MISSOURI AND LAKE OF THE
OZARKS RECREATION AREA, LINN CREEK, MO
INDEX
SECTION NO. DESCRIPTION
DIVISION 1 - GENERAL REQUIREMENTS
01010 Summary of Work 01300 Submittals
DIVISION 2 - SITE WORK
02230 Excavation and Preparation of Subgrade and Base Course 02546 Aggregate Surface Course for Road Shoulders 02555 Bituminous Surface Treatment 02560 Bituminous Spray Applications 02561 Asphalt Slurry Seal 02575 Coal Tar Emulsion Slurry 02577 Pavement Markings 02594 Repair of Bituminous Pavements 02598 Cold Milling of Bituminous Pavements 02703 Hot-Mix Asphalt (HMA) For Roads 02749 Hot-Mix Asphalt (HMA) For Airfields 02785 Sealing of Cracks In Bituminous Pavements
DIVISION 3 – 16 (NOT USED)
01010-1
REPAIR/REPLACE IMPROVED SURFACES
SECTION 01010
SUMMARY OF WORK
1 DESCRIPTION OF WORK:
1.1 Work to be Done: The work consists of furnishing all plant, labor, equipment, supplies, and materials, and performing all work in accordance with these specifications and drawings as indicated at Fort Leonard Wood, Missouri.
1.2 Location: The site of the proposed work is in the Training Area and Cantonment Area of the Fort Leonard Wood Military Reservation, Fort Leonard Wood, Missouri, and at the Fort Leonard Wood Recreation Area at the Lake of the Ozarks, Linn Creek, Missouri.
2 PRINCIPAL FEATURES: The work to be performed will include, but not be limited to, providing and replacing asphalt surfaces and other miscellaneous items in accordance with (IAW) the attached Task List in Technical Exhibit A and specifications. This contract will be a delivery order style contract. All work required shall be on a requirement basis as directed by the Contracting Officer on a delivery order. The Contractor will be paid only for actual quantity of work performed for each Task Item.
3 SEQUENCE OF WORK: The area concerned in this project is Government owned and will be in use during the course of this project.
4 SCHEDULING:
4.1 The Contractor shall schedule all activity at the job site through the DPW Contract Inspection Branch a minimum of 24 hours in advance of work.
4.2 Contractor shall schedule his working hours to coincide with the working hours of the military reservation. Normal working hours of the reservation are 7:30 a.m. to 4:00 p.m., Monday thru Friday, legal public holidays excepted. The Contractor shall not perform work on the reservations beyond the aforementioned working hours without the written approval of the Contracting Officer.
4.3 If the Contractor, for his convenience, desires to perform work during other than normal working hours or on other than normal workdays, he shall notify the Contracting Officer and the Directorate of Public Works Inspection Branch at least 72 hours in advance. The Contractor shall not perform work beyond the normal working hours or normal workdays without written approval of the Contracting Officer and the DPW Inspection Branch approval. The Contractor shall reimburse the Government for any additional expense occasioned the Government thereby, such as, but not limited to, overtime pay for Government inspectors, utilities service, etc.
4.4 Time extensions due to adverse weather, increase in scope of work (SOW), material lead time, or reprioritization of contract by Contracting Officer must be received in writing prior to scheduled completion date.
5 UTILITY INTERRUPTIONS: Coordinate with the Contracting Officer, DPW Contract Inspection Branch, and the user for any utility work that interrupts service to the facility, any area outside the facility, or any real property facility.
Establish a schedule of interruptions listing starting and ending times of disconnection 48 hours prior to interruption.
6 FIELD MEASUREMENTS: The Contractor shall verify all measurements at the project site and shall be responsible
01010-2 for all dimensions, fittings, and the proper installation of all materials and equipment specified.
7 PERMITS: The Contractor shall be responsible for obtaining permits for each worksite.
7.1 Digging: A digging permit is required prior to ANY earthwork operations. The DPW Contract Inspection Branch will assist the Contractor in obtaining this free permit.
7. 2 Land Disturbance: A land disturbance permit is required for any projects that disturb one (1) acre or more.
Land disturbance is defined as any activity that disturbs the roots of vegetations such as clearing, grubbing and grading.
The Contractor shall apply for the permit from the Missouri Department of Natural Resources (MODNR), after the FLW Environmental Office has approved the permit application. MODNR by law may take up to 180 days to review and issue a permit. Copy of the permit shall be forwarded to the DPW Environmental Office. The Contractor shall not begin land disturbance operations until they have received and complied with the MODNR permit. MODNR charges a fee for the permits.
7.3 Hot Work Permit: The Contractor shall obtain a written “Hot Work Permit” (DA Form 5383-R) prior to commencing all hot work outside an approved shop area. Permits will be issued by the FLW Fire & Emergency Services at Fire Station #1, Bldg. 580, Phone: (573) 596-0883. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by terms of this contract. The Inspection Branch will assist the Contractor in obtaining this free permit
7.4 Confined Space Permit: The Contractor shall obtain a written “Confined Space Permit” prior to commencing all confined space activity above and/or below ground. Title 29 CFR 1910.146 OSHA (Confined Space Entry) and FLW Regulation 385-7 sets forth the definition of confined spaces and establishes responsibility and procedures for protection of personnel that shall be entering, work in, and existing confines space. If a permit is required the Contractor shall contact the FLW Fire Department, Fire Station #1, Assistant Chief of Operations, Bldg 580, Phone: (573) 596-0883 prior to, and after the permit required entry is conducted. The Contractor shall keep the permit copy within the work area until all workers have been accounted for after completion of the workday. The Inspection Branch will assist the Contractor in obtaining this free permit.
8 SAFETY REQUIRMENTS:
8.1 General Safety: During progress of work, the Contractor shall protect all personnel, whether Government or civilian, from any and all safety hazards caused by the construction operations. The contractor shall follow all Federal, State and local laws in accordance with 29 CFR 1910 (General Industries Standards), and 29 CFR 1926 (Construction Standards).
8.2 Fire Prevention: The current version of FLW Regulation 420-2 “Post Fire Regulations” is by this reference made a part of this solicitation and resultant contract. The Contractor’s operation shall conform to all applicable portions of this document. All personnel entering on duty as Contractor’s employees shall be instructed in the fire prevention program of the Post and shall be advised of the requirement of the Post Fire Regulations as they pertain to this particular contract.
8.3 Traffic Control: Contractor shall provide all temporary signs and markers as necessary to maintain safety in the worksite. All signs shall conform to the latest edition of the Manual of Uniform Control Devices (MUTCD) and shall be coordinated with, and approved by, DPW Inspection Branch. Contractor shall ensure road user movement is inhibited as little as practical.
9. SPECIAL REQUIREMENTS:
01010-3
9.1 Use of Fire Hydrants – The temporary use of fire hydrants as sources of water is not authorized without prior approval by the Fire Department, 596-0886. Fire hydrant connections shall include an approved backflow preventer. Use of backflow preventers must comply with Missouri Department of Natural Resources, Division 60, Public Drinking Water Program, Chapter 11 – Backflow Prevention, Title 10CSR60-11. Government furnished backflow preventers shall be utilized and are available at Bldg. 1601, Water Treatment Plant on a first come basis.
The Contractor shall be required to sign a hand receipt prior to obtaining a backflow preventer. The Contractor shall be accountable to return the checked out backflow preventer equipment undamaged and as soon as possible.
The contractor shall furnish and use an approved fire plug wrench to open and close the hydrant. Pipe wrenches shall not be used. When the hydrant is not being used it shall be shut off. When the need for the hydrant is finished, the hydrant shall be shut off , the temporary connection and backflow preventer shall be removed, the fire hydrant caps shall be replaced and the Fire Department shall be notified that the hydrant will no longer be used.
10. SECURITY:
10.1 In unoccupied facilities, the Contractor shall be responsible for the security of the facility; i.e., all exterior doors shall be locked, windows closed and locked, etc.
10.2 The Contractor shall not be on site without prior notification to the DPW Contract Inspection Branch.
10.3 Contractor personnel shall have valid civilian ID’s.
11 APPLICABLE PUBLICATIONS/REFERENCES: The publications referenced herein after shall be the most recent at the time of solicitation, unless otherwise specified at the beginning of each Specification Section under paragraph 1.
APPLICABLE PUBLICATIONS and or REFERENCES.
12 WORKSITE HOUSEKEEPING:
12.1 The Contractor shall remove all trash and disposal material from the worksite before the end of each day, to the extent it is consistent with standard construction practices on Government work sites. The Contractor shall take all possible precautions to maintain the work site, at all times, in a condition that will prevent damage or injury to person or property, Government or otherwise. The above precautions shall include protection from weather conditions. The Contractor shall be responsible for all damages caused by the negligent acts or omissions of his employees, sub-contractors, or agents during Contract performance.
12.2 Materials to be used within 1 week of delivery and scrap material to be used as work progresses shall not be required to be in screened area. However, all such items shall be placed in an orderly manner (i.e. dirt, rock, etc., in piles and stackable items such as pipe, brick, lumber, etc., stacked off the ground on pallets in an orderly manner).
12.3 Grass and weeds at work/storage site shall be kept at a height of 4”or less. Work site/storage site shall be policed for trash and disposal material a minimum of once per day.
12.4 All trailer and material storage sites shall have an identification board/sign, with company and job name on it, i.e. ABC Construction – ABC building complex. Signs shall meet the following criteria: min 3’ X 3’ max of 4’ X 8’ in size, 3” high legible print, and be approved by DPW Inspection Branch.
13 RESPONSIBLITY FOR DAMAGE
13.1 Damage to Personal Property: The Contractor shall be solely responsible for all damage to Government and occupant personal property caused by the Contractors’ personnel, subcontractors, his agents, or by the performance
01010-4 of his work.
13.2 Damage by Negligence: Damage resulting in gas leaks, electrical outages, loss of heat during cold weather, water leaks, unsecured facilities, weather damage, or oil/hazardous waste spills shall be responded to by the Contractor within 2 hours and repaired within one workday. If the Contractor fails to comply with these requirements, the Government reserves the right to repair the damage and charge the cost to the Contractor. Contractor shall protect all areas through which he will be transporting demolition debris or construction materials. Any damaged turf, sidewalks, roads, vegetation, site amenities, etc, shall be replaced or repaired by the Contractor prior to final Contract closeout.
14 DISPOSAL OF MATERIALS: All materials removed and not reused or designated as salvage material in this project shall become the property of the Contractor, unless otherwise specified, and shall be the Contractor's responsibility for lawful disposal.
14.1 The Contractor may use the Fort Leonard Wood Compost area for the disposal of wood chips, leaves, and grass clippings generated by this project.
14.2 All other wastes generated during Contractor operations shall be disposed of off post by the Contractor at his/her expense.
14.2.1 The disposal of demolition waste is regulated by the Missouri Department of Natural
Resources under Chapter 260, Revised Statutes of Missouri and 10 Code of State Regulations Chapter 80-
4. Such waste, in types and quantities established by the Department, shall be taken to a demolition landfill or a sanitary landfill off of the Installation for disposal. The Contractor shall provide any information requested by the landfill operator to complete forms required by the Missouri Department of Natural Resources or other Government-required landfill records.
14.2.2 Wastes classified as hazardous wastes under the Resource Conservation and Recovery Act shall be disposed of off the installation, unless otherwise specified in this contract. No hazardous waste shall be disposed of without prior review of the disposal documents, and the approval of the Contracting Officer and the Directorate of Public Works Environmental Coordinator, or his designated representative. The Contractor shall provide an original copy of the disposal document from the approved EPA or State permitted disposal facility for each shipment of hazardous waste generated in this project to the Contracting Officers Representative.
15 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES:
15.1 All Contractor and sub-contractor personnel performing tasks on this SOW shall comply with all applicable installation, facility and area commander installation/facility access and local security policies and procedures which will be provided to the Contractor by a Government representative upon written request to the Contracting Officer. Contractor shall provide all information required for background checks to meet installation access requirements as performed by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Requesting Contractor shall submit request for installation pass to the KO at https://vcc1.icmvcc.com/im3500/. There is no charge to the Contractor for this pass. Contractor personnel shall comply with all personal identity verification requirements as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of the base contract to this task order, should the Force Protection Condition (FPCON) at any facility or installation change, the Government may require changes in Contractor security matters or processes.
15.1.1 In the event that the automated system at https://jkodirect.jten.mil is not available (e.g., server problems), Level I AT Awareness Training can be provided by a qualified instructor. However, if the training is not completed online, the Level I AT Awareness Instructor qualification must be coordinated with the Installation
01010-5
Antiterrorism Officer (or Installation Security equivalent) and the resultant name(s) of approved instructors shall be provided to the KO.
15.2 Antiterrorism (AT) Level I Training: All contractor and sub-contractor employees requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training available at https://jkodirect.jten.mil.Users need to enroll in "Course #JS-US007-14" to receive credit for the training within 10 calendar days of contract award; or for new employees within 10 working days of beginning performance on this contract. Contractor shall submit certificates of completion for all personnel to the KO within five calendar days of completion of the training. There is no charge to the Contractor for this training. The burden to complete this training is approximately 1-hour per employee.
15.3 iWatch Training: Within 10 calendar days of contract award and within 10 calendar days of new
Contractor employees commencing work on this contract, all Contractor and sub-contractor employees shall review the FLW Directorate of Emergency Services (DES) web link for iWatch training located at http://www.wood.army.mil/LEC/iWatch/iWatch.htm. This locally developed training will inform employees of the types of behavior to watch for and how to report suspicious activity. Suspicious activity shall be reported to the KO.
There is no charge to the Contractor for this review. The burden to complete this training is approximately 20-minutes per employee.
15.4 OPSEC Standard Operating Procedure/Plan (SOP): The KO will ensure the contractor (after selected) is aware of the MSCoE OPSEC Plan and is in compliance with the MSCoE OPSEC Plan during contract performance.
15.5 OPSEC Training: New contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty in accordance with AR 530-1. All contractors shall complete annual OPSEC Awareness training if the contract duration is longer than 30-days. MSCoE OPSEC Officer will provide training. Coordination of training shall be through the DPW Inspection Branch. Proof of training, including a detailed listing of attendees, shall be provided to the KO. A nominal fee shall be charged to the Contractor for this training equal to 1-hour of Government time. The burden to complete this training is approximately 1-hour per training evolution. There are no restrictions to number of attendees in a given training evolution.
15.5.1 All costs associated with employee training and review must be included in the CLIN prices bid/offered for the underlying requirement. No other payments are authorized.
15.5.2 Contractor shall reimburse the Government for classroom OPSEC training. The established fee is $30 per face-to-face training session conducted. Contractor personnel may all attend the same training session;
however, in the event of new hires, additional session(s) shall be required. Contractor shall submit payment to the US Treasury, Attention: Budget Officer, MSCoE G-8, 14000 MSCoE Loop, Ste 335, Fort Leonard Wood, MO 65473.
16 PRICE ADJUSTMENT:
16.1 Adjustments will be made to the unit price and extended to the total price paid to the Contractor for Tasks 1, 2, 3, 4, 5, 6, 7, 19, 29, 30 and 44 if the latest Monthly Fuel Index and/or Asphalt Price Index, as posted on the MODOT website, on the date a Delivery Order is issued, has fluctuated from the indexes posted on said website on the date of the bid opening for this contract. The MODOT website to be used is found at http://modot.org/business/contractor_resources/bidOpenIndex.shtml. Select the latest Bid Letting Date that has posted indexes and then select the links “Asphalt Price Index” and “Monthly Fuel Index”. The price adjustments will be calculated as described in Paragraphs 16.2 and 16.3. The price adjustments for fuel and asphalt will then be added to the Unit Price for the Tasks listed above in this paragraph that are used in the issued Delivery Order for the work being performed. The price adjustments may result in an increase or decrease in the unit price of the Tasks
01010-6 depending on the change in the indexes.
16.1.1 Price Adjustment for Fuel: The price adjustment for fuel used in application of asphalt will be based on a Fuel Usage Factor for Production of 2.65 gal/ton of Total Mix and a Fuel Usage Factor for On-Road Hauling of 0.67 gal/ton of Total Mix for a total Fuel Usage Factor of 3.32 gal/ton. This factor will be divided by 9 (nine) to give a factor of 0.37 gal/sq. yd. for a 2” asphalt course. A factor of 0.74 gal/sq. yd. will be used for a 4” asphalt course. The Fuel Usage Factor in gal/sq. yd. will be multiplied by the change in the Monthly Fuel Index as described in Paragraph 16.1. The resulting price adjustment will then be applied to the Unit Price for the appropriate Tasks.
A = B X (C – D)
Where: A = Adjustment for fuel used in application of asphalt
B = Fuel Usage Factor (0.37 for 2” course of asphalt, 0.74 for 4” course of asphalt)
C = Monthly Fuel Index on the date of commencement of work
D = Monthly Fuel Index on the date of bid opening for this contract.
16.1.2 Price Adjustment for Asphalt: The price adjustment for asphalt will be applied to the actual amount of asphalt binder used by the Contractor for the Tasks listed in Paragraph 16.1. The change in the Asphalt Price Index, as described in Paragraph 16.1, will be divided by 9 (nine) to obtain a price/sq. yd. for a 2” asphalt course. The adjustment factor for a 4” asphalt course shall be twice this amount. The percentage of virgin asphalt as shown in the job mix formula submitted by the Contractor, in accordance with SEC 403 (2004) Missouri Standard Specifications for Highway Construction - Asphaltic Concrete Pavement, will be the basis for adjustments for any asphalt mix type placed. The effective asphalt obtained from the use of recycled asphalt pavement (RAP) will not be eligible for adjustment. To determine the adjustment for asphalt the following formula will be used. The resulting price adjustment will then be applied to the Unit Price for the appropriate Tasks.
A = B X (C – D) / 9; for a 2” asphalt course
A = B X (C – D) / 4.5; for a 4” asphalt course
Where: A = Adjustment for asphalt
B = % of virgin asphalt binder as listed in the job mix formula in use
C = Asphalt Price Index on the date of commencement of work
D = Asphalt Price Index on the date of bid opening for this contract.
16.2 Price Adjustment Modifications: In the event there is a delay of at least 30 days between the date the Delivery Order is issued and the work starts either the Contractor or the Government may request a modification based on changes in the Monthly Fuel Index and/or Asphalt Price Index, as posted on the MODOT website, since the Delivery Order was issued. No work will proceed until the modification has been issued by the Contracting Officer. The price adjustments will be made as described in Paragraphs 16.1.1 and 16.1.2 except the indexes on the date the Delivery Order was issued will be substituted for the indexes on the date of the bid opening for this contract
01010-7 as illustrated in Paragraphs 16.2.1 and 16.2.2.
16.2.1 Price Adjustment for Fuel:
A = B X (C – D)
Where: A = Adjustment for fuel used in application of asphalt
B = Fuel Usage Factor (0.37 for 2” course of asphalt, 0.74 for 4” course of asphalt)
C = Monthly Fuel Index on the date of commencement of work
D = Monthly Fuel Index on the date the Delivery Order was issued.
16.2.2 Price Adjustment for Asphalt:
A = B X (C – D) / 9; for a 2” asphalt course
A = B X (C – D) / 4.5; for a 4” asphalt course
Where: A = Adjustment for asphalt
B = % of virgin asphalt binder as listed in the job mix formula in use
C = Asphalt Price Index on the date of commencement of work
D = Asphalt Price Index on the date the Delivery Order was issued.
17 SUBMITTALS:
17.1 A traffic control plan for each operation or site, in sufficient detail to define temporary traffic patterns, areas to be closed, and measures to be taken to reroute traffic and to maintain the safety of the public and workmen.
01300-1
SECTION 01300
SUBMITTALS
1. General: All items of equipment and/or materials that are defined or described in the contract require submission in accordance with this section. Brochures, samples, certificates of compliance, test reports, as applicable, shall be submitted by the Contractor to the Contracting Officer, and approval given by the Contracting Officer before any equipment or material is installed under this contract.
1.1. All of the data required shall be submitted at one time. Approval of materials and equipment will be withheld until all of the required information has been submitted and is in the hands of the Contracting Officer.
All submissions must be in sufficient detail to adequately determine that the item will meet the requirements of this specification.
1.2. All submittals shall be transmitted to the Contracting Officer for review and approval within 30 calendar days after contract award date on Engineer Form 4025 in quadruplicate. The forms shall be completed as directed. No submittal will be accepted unless it is on the subject form. The forms will be furnished to the Contractor by the Government. All attachments to the transmittal form, such as catalog cuts, brochures, certif-ications, etc., shall be submitted in four (4) copies.
1.3. The Contractor shall complete and submit to the Contracting Officer for approval, four copies of ENG Form 4288 Submittal register. At a minimum, the submittal register shall include a listing of all items listed in paragraph 2 of this section. This submittal register shall be provided with the initial set of submittals the Contractor submits for approval. ENG form 4288 will be furnished to the Contractor by the Government. This register will be maintained by the Government to insure that all required materials are submitted and approved IAW the contract requirements.
1.4. Scheduling: A minimum of 14 calendar days will be scheduled for review and approval of material submittals and possible resubmittal of any items subject to approval. For shop drawings submittals, a minimum of 21 calendar days will be allowed for review, approval, and possible resubmittal.
2. MATERIAL APPROVAL SUBMITTALS: At a minimum the following list of materials will require approval under the Contract Clause, FAR 52.236-5, titled Material and Workmanship. Additional materials requiring approval may be listed in other sections of the specifications. The Contracting Officer may require submission of additional materials as deemed necessary. If additional items are required to be submitted a revised ENG form 4288, SUBMITTAL REGISTER, shall be prepared by the Contractor and submitted with the additional material submittals. The Contractor shall not proceed with any work using materials that are subject to approval, until materials are approved.
2.1. SECTION 01010: SUMMARY OF WORK:
2.1.1. Traffic control plan for each operation or site.
2.1.2. Adhesive-backed reflectorized temporary centerline markers
2.2. SECTION 02230: EXCAVATION AND PREPARATION OF SUBGRADE AND BASE
COURSE:
2.2.1. Baserock: sieve analysis
01300-2
2.2.2. 3-inch clean rock: 10 lb. sample and sieve analysis
2.2.3. PVC pipe: manufacturer’s descriptive data for pipe and fittings
2.3. SECTION 02546: AGGREGATE SURFACE COURSE FOR ROAD SHOULDERS:
2.3.1. Sieve analysis of aggregate.
2.3.2. Source of aggregate.
2.3.3. Results of wear tests.
2.4. SECTION 02555: BITUMINOUS SURFACE TREATMENTS:
2.4.1. Sieve analysis and test reports for aggregate.
2.5. SECTION 02560: BITUMINOUS SPRAY APPLICATIONS:
2.5.1. Manufacturer's descriptive data: asphalt emulsions
2.5.2. Equipment and methods for application of bituminous spray applications.
2.6. SECTION 02561: ASPHALT SLURRY SEAL:
2.6.1. Details and data on the make, type, and capacity of the slurry seal machine.
2.6.2. Mix design for the slurry seal mixture
2.6.3. The material supplier's statement that the supplied material meets specified requirements.
Each certificate shall be signed by an official authorized to certify on behalf of material supplier and shall identify quantity and date or dates of shipment or delivery to which the certificates apply.
2.7. SECTION 02575: COAL TAR EMULSION SLURRY:
2.7.1. A copy of the mixture proportions that meet all the requirements of this specification.
2.7.2. The material supplier's statements that the supplied material meets the specified requirements. Each certificate shall be signed by an official authorized to certify on behalf of the material supplier and shall identify the quantities and dates of shipments or deliveries to which the certificates apply.
2.7.3. A detailed description of the machines that will be used to mix and place the seal coat.
2.8. SECTION 02577: PAVEMENT MARKINGS:
2.8.1. Test Reports: The Contractor shall furnish laboratory test reports with certification that the following materials meet the specifications:
2.8.1.1. Paint
2.8.2. Drawings depicting shapes and dimensions of arrows and letters.
01300-3
2.9 SECTION 02703: HOT-MIX ASPHALT (HMA) FOR ROADS
2.9.1 Mix Design
2.9.2 Asphalt Cement Binder
2.9.3 Copies of certified test data.
2.90.4 Amount, type and description of any modifiers blended into the asphalt cement binder
2.9.5 Testing Laboratory
2.9.6 Certification of compliance.
2.9.7 Plant Scale Calibration Certification
2.9.8 Equipment for placement and compaction of asphalt concrete.
2.9.9 Herbicide for treating vegetation growing in existing pavement
2.10 SECTION 02749: HOT-MIX ASPHALT (HMA) FOR AIRFIELDS
2.10.1 Product Data
2.10.1.1 Mix Design: Submit proposed JMF.
2.10.2 Test Reports
2.10.2.1 Aggregates
2.10.2.2 QC Monitoring: Submit aggregate and QC test results.
2.10.3 Certificates
2.10.3.1 Asphalt Cement Binder: Submit copies of certified test data.
2.10.3.2 Testing Laboratory: Submit certification of compliance.
02230-1
SECTION 02230
EXCAVATION AND PREPARATION OF SUBBASE AND BASE COURSE
PART I. - GENERAL
1.1 REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM D 1556(2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method
ASTM D 1557(2009) Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/cu. ft. (2,700 kN-m/cu.m.))
ASTM D 2167(2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method
ASTM D 2216(2010) Laboratory Determination of Water (Moisture) Content of Soil and Rock
ASTM D 2487(2010) Classification of Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D 2922(2004) Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth)
ASTM D 2937(2010) Density of Soil in Place by the Drive-Cylinder Method
ASTM D 3017(2004) Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth)
ASTM D 3034 (2008) Standard Spec Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings
ASTM F 949 (2010) Standard Specification for Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe
With Smooth Interior and Fittings
ASTM F 789(1995) Standard Specification for Type PS-46 and Type PS-115 Poly(Vinyl Chloride) (PVC) Plastic Gravity Flow Sewer Pipe and Fittings
ASTM D 3212(2007) Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible
Elastomeric Seals
ASTM F 477(2010) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
UBPPA UNI-B-9(2001) Uni-Bell PVC Pipe Association, Recommended Performance Specifications for
Polyvinyl Chloride (PVC) Profile Wall Gravity Sewer Pipe and Fittings Based on Controlled Inside Diameter (Normal Pipe Sizes 4-48 inches)
1.2 DEFINITIONS:
1.2.1 Excavation: The satisfactory removal and deposition of all materials indicated.
1.2.2 Baserock: Crushed limestone or dolomite conforming to the following gradation requirements:
02230-2
Percent
Passing 1-inch sieve Passing 1/2-inch sieve............60-90 Passing No. 4 sieve...............40-60 Passing No. 40 sieve..............15-35
1.2.3 3-inch clean rock: Limestone or dolomite having at least 10 percent retained on the 3-inch sieve and having less than five percent passing the 3/4-inch sieve.
1.2.4 2-inch clean rock: Limestone or dolomite having at least 10 percent retained on the 2-inch sieve and having less than five percent passing the 3/4-inch sieve.
1.2.5 Satisfactory Materials: Satisfactory materials shall comprise any materials classified by ASTM D 2487 as GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP.
1.2.6 Unsatisfactory Materials: Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include man-made fills, trash, refuse, or backfills from previous construction. Unsatisfactory material also includes material classified as satisfactory which contains root and other organic matter, frozen material, and stones larger than 3 inches. The Contracting Officer shall be notified of any contaminated materials.
1.2.7 Cohesionless and Cohesive Materials: Cohesionless materials include materials classified in ASTM D 2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM, GP-GM, GW-GM, SW-SM, SP-SM, and SM shall be identified as cohesionless only when the fines are nonplastic.
1.2.8 PVC pipe and joints: PVC pipe and joints shall be 12 inches in diameter and shall meet any of the following requirements:
1.2.8.1 ASTM D 3034, Type PSM, with a maximum SDR of 35.
1.2.8.2 ASTM F 949 for corrugated sewer pipes with a smooth interior.
1.2.8.3 UBPPA UNI-B-9, Series 46, for ribbed sewer pipe with smooth interior.
1.2.8.4 ASTM F 789 for Type PS-46.
1.2.8.5 Joints shall be flexible elastomeric seal joints in accordance with ASTM D 3212. Gasket materials shall meet the requirements of ASTM F 477.
1.3 UTILIZATION OF EXCAVATED MATERIALS:
1.3.1 Satisfactory material may be used to repair areas disturbed by construction.
1.3.2 All unsatisfactory material and surplus satisfactory material shall be transported and deposited as specified in SECTION 01010: SUMMARY OF WORK.
1.4 DEGREE OF COMPACTION: Degree of compaction is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 1557, abbreviated as percent laboratory maximum density.
02230-3
1.5 SUBMITTALS:
1.5.1 Sieve analysis of baserock material
1.5.2 Descriptive data for PVC pipe
1.5.3 3-inch clean rock: 10 lb. sample and sieve analysis
1.5.4 Copies of all laboratory and field test reports within 24 hours of the completion of the test.
PART 2 - EXECUTION
2.1 EXCAVATION: Excavation shall conform to the dimensions and elevations . Excavations below indicated depths will not be permitted except to remove unsatisfactory material. Unsatisfactory material encountered below the grades shown shall be removed as directed and replaced with satisfactory material. Satisfactory material removed below the depths indicated, without specific direction of the Contracting Officer, shall be replaced, at no additional cost to the Government, with satisfactory materials to the indicated excavation grade. Satisfactory material shall be placed and compacted as specified in paragraph FILLING AND BACKFILLING.
2.2 FILLING AND BACKFILLING: Satisfactory materials shall be used in bringing fills and backfills to the lines and grades indicated and for replacing unsatisfactory materials. Satisfactory materials shall be placed in horizontal layers not exceeding 8 inches in loose thickness, or 6 inches when hand-operated compactors are used. After placing, each layer shall be plowed, disked, or otherwise broken up, moistened or aerated as necessary, thoroughly mixed and compacted as specified. Backfilling shall not begin until construction below finish grade has been approved. Backfill shall be brought to indicated finish grade. Backfill shall not be placed in wet or frozen areas.
Heavy equipment for spreading and compacting backfill shall not be operated closer to foundation or retaining walls than a distance equal to the height of backfill above the top of footing; the area remaining shall be compacted in layers not more than 4 inches in compacted thickness with power-driven hand tampers suitable for the material being compacted. Backfill shall not be placed against foundation walls prior to 7 days after completion of the walls.
As far as practicable, backfill shall be brought up evenly on each side of the wall and sloped to drain away from the wall. Each layer of fill and backfill shall be compacted to not less than the percentage of maximum density specified below:
02230-4
Percent Laboratory maximum density
Cohesive Cohesionless material material
Fill, embankment, and backfill
Under structures, building slabs, steps, paved areas, around footings, and in trenches 90 95
Under sidewalks and grassed areas 85 90
Subgrade
Under building slabs, steps, and paved areas, top 12 inches 95 95
Under sidewalks, top 6 inches 85 90
Approved compacted subgrades that are disturbed by the Contractor's operations or adverse weather shall be scarified and compacted as specified herein before to the required density prior to further construction thereon. Recompaction over underground utilities and heating lines shall be by hand tamping.
2.3 SUBBASE PREPARATION:
2.3.1 Construction: Subbase shall be shaped to line, grade, and cross section, and compacted as specified.
2.3.1.1 If during compaction it appears that the subbase is soft, wet, or otherwise unsuitable, the Contracting Officer may direct the Contractor to remove the unsuitable material and replace it with suitable material, according to the Tasks contained in these specifications. In order to be paid for the quantities used under these Tasks, the Contractor must obtain approval from the Contract Inspection Branch before each use of these Tasks and shall submit proof of the quantities of rock used.
2.3.1.2 During construction, work shall be performed in a manner and sequence that will ensure proper drainage of the work area.
2.3.2 Compaction: Compaction shall be accomplished by at least three complete coverages with a sheepsfoot roller over the entire area to be compacted. The sheepsfoot roller shall have feet projecting not less than 6 inches from the surface of the drum and shall have a minimum load on each foot of 250 pounds per square inch of tamping area. Compactive effort shall be continued, if necessary, until the feet penetrate not more than 2 inches into the layer of material being compacted. Continuous leveling and manipulating shall be performed during compacting operations.
2.3.3 Subbase Protection: The finished subbase shall not be disturbed by traffic or other operation and shall be protected and maintained by the Contractor in a satisfactory condition until base course is placed. The
02230-5 storage or stockpiling of materials on the finished subbase will not be permitted. No base course shall be laid until the subbase has been checked and approved by the Contract Inspection Branch, and in no case shall base be placed on a muddy, spongy, or frozen subbase.
2.4 FINE GRADING:
2.4.1 Fine grading shall be done such that when a 10 foot straightedge is laid on the surface in any direction, the surface and the straightedge shall vary from each other not more than 1/2 inch.
2.4.2 After the surface is within the above tolerance, the surface shall be compacted by not less than three complete coverages with a 5 ton roller.
2.5 BASE COURSE PREPARATION:
2.5.1 Compaction: Base course aggregate shall be compacted by not less than three complete coverages with a 5 ton roller. Rolling shall be continued until there is no visible evidence of further consolidation.
2.5.2 Finishing: The completed base course shall have a surface such that when a 10 foot straightedge is laid on the base course surface in any direction, the surface of the base course and the straightedge shall vary from each other not more than 1/2 inch.
2.5.3 Base Course Protection: The finished base course shall not be disturbed by traffic or other operation and shall be protected and maintained by the Contractor in a satisfactory condition until asphalt is placed.
The storage or stockpiling of materials on the finished base course will not be permitted. No asphalt shall be laid until the base course has been checked and approved by the Contract Inspection Branch, and in no case shall asphalt be placed on a muddy, spongy, or frozen base course.
2.5.4 Drainage: The surface of the base course shall be well drained at all times. If at any time the compacted base becomes unstable, it shall be the Contractor's responsibility to restore the earth subbase and the base course to the required grade, cross section, and density, at no additional cost to the Government.
2.6 CULVERT INSTALLATION:
2.6.1 Ditch walls below the top of the pipe shall be sloped, or made vertical, and of such width as recommended in the manufacturer's installation manual. Where no manufacturer's installation manual is available, ditch walls shall be made vertical. The ditch width below the top of pipe shall not exceed 24 inches plus pipe outside diameter (O.D.).
2.6.1.1 Ditch walls above the top of the pipe shall have vegetation removed to ensure adequate compaction of fill and bonding of fill to ditch walls.
2.6.2 Bottom Preparation: The bottom of the ditch shall be accurately graded to provide uniform bearing and support for the pipe bedding.
2.6.3 Soft or wet material shall be removed to a depth of 6 inches and replaced with compacted baserock.
2.6.4 Bedding shall be baserock and shall be placed in layers not exceeding 6 inches loose thickness, then compacted with at least three passes of a vibratory plate compactor or other approved equipment.
The final bedding thickness shall be 4 to 6 inches. Bedding shall be accurately graded to provide uniform bearing and support along the full length of pipe.
02230-6
2.6.4.1 Bell holes shall be excavated in the bedding material to allow for unobstructed assembly of the pipe joints. When the joint has been made, the bell hole shall be filled with bedding material to provide for adequate pipe support throughout its entire length.
2.6.5 The pipe shall be placed on the bedding material over the centerline of the ditch with the midpoint of the pipe at the centerline of the proposed pavement. Pipe shall be placed with the bell end upstream and the spigot end downstream.
2.6.6 Haunching and Final Backfill: Baserock shall be placed and compacted around the pipe by hand or mechanical tamping to a depth of one-half of the pipe diameter. Care shall be taken to ensure thorough compaction of the fill under the haunches of the pipe. Baserock shall then be placed in layers of 6 inches loose thickness and compacted with at least three passes of a vibratory plate compactor to the full height of the fill.
2.7 Cleaning and Shaping of Existing Ditches: The Contractor shall clean and shape the existing ditch and foreslope by pulling the foreslope of the ditch and by cleaning out the ditch bottom so that water will flow off of the roadway and into the ditch. The ditch shall have a smooth, continuous profile so that there is no ponding of water in the ditch. The Contractor may relocate material removed from the foreslope and the ditch on the roadway.
END OF SECTION
02546-1
SECTION 02546
AGGREGATE SURFACE COURSE FOR ROAD SHOULDERS
PART 1 - GENERAL
1.1 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
1.1.1. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPOR-TATION OFFICIALS
(AASHTO):
AASHTO T 96 Standard Method of Test for
Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine
1.1.2. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM C 117(2004) Materials Finer Than 75 micrometer
(No. 200) Sieve in Mineral Aggregates by Washing
ASTM C 136(2006) Sieve Analysis of Fine and Coarse Aggregates
ASTM D 75(2009) Sampling Aggregates
ASTM D 422-63(2007) Standard Test Method for
Particle-Size Analysis of Soils
ASTM D 3740(2010) Standard Practice for Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction
ASTM E 11(2009e1) Standard Specification for Wire-
Cloth Sieves for Testing Purposes (1987)
02546-2
1.2 UNIT PRICES
1.2.1 Measurement: The quantity of aggregate surface course completed and accepted as determined by the Contracting Officer will be measured in cubic yards of aggregate hauled and placed.
1.2.2 Payment: Quantities of aggregate surface course for road shoulders, as specified in paragraph Measurement, will be paid for at the respective contract unit prices. Payment will constitute full compensation for raising shoulders to the grade of the adjacent road surface, including furnishing all labor and incidentals necessary to complete the work required by this section.
1.3 SUBMITTALS
1.3.1. Sieve analysis of aggregate.
1.3.2. Source of aggregate.
1.3.3. Results of wear tests.
1.4 SAMPLING AND TESTING: Sampling and testing shall be the responsibility of the Contractor. Sampling and testing shall be performed by an approved commercial testing laboratory or by the Contractor, subject to approval. If the Contractor elects to establish testing facilities of his own, approval of such facilities shall be based on compliance with ASTM D 3740, and no work requiring testing will be permitted until the Contractor's facilities have been inspected and approved.
1.4.1 Sampling: Sampling for material gradation shall be taken in conformance with ASTM D 75. When deemed necessary, the sampling will be observed by the Contracting Officer.
1.4.2 Testing
1.4.2.1. Gradation: Aggregate gradation shall be made in conformance with ASTM C 117, ASTM C 136, and ASTM D 422. Sieves shall conform to ASTM E 11.
1.4.2.2. Wear Test: Wear tests shall be made in
conformance with AASHTO T 96.
1.4.3 Approval of Materials: The source of the material to be used for producing aggregates shall be selected fourteen days prior to the time the material will be required in the work. Approval of sources not already approved by the Government will be based on an inspection by the Contracting Officer. Tentative approval of materials will be based on appropriate test results on the aggregate source. Final approval of the materials will be based on tests for gradation performed on samples taken from the completed and compacted surface course.
1.5 WEATHER LIMITATIONS: Aggregate surface courses shall not be constructed when the ambient temperature is below 35 degrees F and on subgrades that are frozen or contain frost. It shall be the responsibility of the Contractor to protect, by approved method or methods, all areas of surfacing that have not been accepted by the Contracting Officer. Surfaces damaged by freeze, rainfall, or other weather conditions shall be brought to a satisfactory condition by the Contractor.
PART 2 - PRODUCTS
02546-3
2.1 AGGREGATES: Aggregates shall consist of clean, sound, durable particles of crushed limestone or dolomite.
Aggregates shall be free from lumps and balls of clay, organic matter, objectionable coatings, gravel, stones and other foreign materials. The Contractor shall be responsible for obtaining materials that meet the specification and can be used to meet the grade and smoothness requirements specified herein after all compaction operations have been completed.
2.1.1 Coarse Aggregates: The material retained on the No. 4 sieve shall be known as coarse aggregate.
Coarse aggregates shall be reasonably uniform in density and quality. The coarse aggregate shall have a percentage of wear not to exceed 50 percent as determined by AASHTO T 96. The amount of flat and/or elongated particles shall not exceed 20 percent. A flat particle is one having a ratio of width to thickness greater than three; an elongated particle is one having a ratio of length to width greater than three. When the coarse aggregate is supplied from more than one source, aggregate from each source shall meet the requirements set forth herein.
2.1.2 Fine Aggregates: The material passing the No. 4 sieve shall be known as fine aggregate. Fine aggregate shall consist of screenings or other finely divided mineral matter that is processed or naturally combined with the coarse aggregate.
2.1.3 Gradation Requirements: Gradation requirements specified in TABLE I shall apply to the completed aggregate surface. It shall be the responsibility of the Contractor to obtain materials that will meet the gradation requirements after mixing, placing, compacting, and other operations. TABLE I shows permissible gradings for granular material used in aggregate surface roads. Sieves shall conform to ASTM E 11.
TABLE I. GRADATION FOR AGGREGATE SURFACE COURSES FOR ROAD SHOULDERS
Sieve Designation No. 1 No. 2
1 in. 100 --
3/4 in. -- 100 3/8 in. *65 *75 No. 4 -- -- No. 10 5-25 10-30 No. 200 -- --
NOTE: “*” indicates maximum permitted
I. PART 3 - EXECUTION
3.1 OPERATION OF AGGREGATE SOURCES: Clearing, stripping, and excavating shall be the responsibility of the Contractor. The aggregate sources shall be operated to produce the quantity and quality of materials meeting these specification requirements in the specified time limit.
3.2 PREPARATION OF EXISTING SHOULDER: The existing shoulder shall be cleaned of all foreign substances. At the time of surface course repair, the shoulder shall contain no frozen material. Ruts or soft yielding spots in the shoulder shall be corrected by loosening and removing soft or unsatisfactory material. The completed shoulder shall not be disturbed by traffic or other operations and shall be maintained by the Contractor in a satisfactory condition until the surface course is placed.
3.3 MIXING AND PLACING MATERIALS: The materials shall be mixed and placed in such a manner as to obtain uniformity of the material. Approved material shall be placed on the shoulder in such quantity as to compact
02546-4 to the grade of the adjacent road surface. A slope of not less than 1/2 inch per foot away from the road shall be maintained. The Contractor shall make such adjustments in mixing or placing procedures or in equipment so as to bring the shoulder level with the road surface, to minimize segregation and egradation, and to ensure a satisfactory surface course.
3.4 SCARIFICATION: After the required quantity of aggregate surfacing material has been distributed and spread over the prepared shoulder, it shall be incorporated into the upper two to four inches of the shoulder by the use of a blade, tiller, scarifier or disk until a uniform mixture of surfacing material and existing shoulder material is attained.
3.5 COMPACTION: The mixture shall be…