Questions W911S714B0011 Replace Valves Bldg 10250

1. Because of the age of the existing valves these valves are not a standard item and will have to be casted in order to fit into the existing flanges. The manufactory states that it will require 90 to 120 days to cast the required valves and ship to the job site. Because of the long lead time required to cast and ship the valves can the performance period be changed from 120 day to 160 days?

Yes. The performance period will be changed to 160 days.

2. Will the contactor have to show a paid receipt for the valves on this project before a money draw for the valves can be made by the Government?

Please refer to FAR 52.232-5, as incorporated.