FORT DRUM OVERHEAD CRANE/HOIST LOAD BRAKE INSPECTION AND LOAD TEST.
Fort Drum, New York Statement of Work
EC-20002-3J
LOAD BRAKE INSPECTION & LOAD TEST OVERHEAD CRANES & HOISTS IN RESPECT TO MANUFACTURIES CRANE SAFETY REQUIREMENTS.
Regulatory Requirements:
- OSHA 29 CFR 1910 Subpart N 1910.179 Overhead and gantry cranes.
- ANSI/ASME B30.2-2005 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist).
- Army Regulation 420–1 • 12 February 2008 Army Facilities Management.
- National Army/OSHA Partnership Department of the Army (#319) Signed October 15, 2004.
- Manufacturers’ specifications & industry standards.
- Asme B30.2/.11/.16/.17
PWS PART 5: SPECIFIC TASKS
5.1. GENERAL: The Contractor shall furnish all supervision, plant, labor, material and equipment necessary to provide load brake inspections, safety certification and load test of the inspected unit. Technical Exhibit Crane/Hoist provided. Inspections, tests and certifications shall be in accordance with current statutory regulations referenced.
5.2. Crane/Hoist load test: The contractor shall statically load test each unit to no less than 100% and no more than 125% to depending upon the unit in reference to 29CFR 1910.179 (F) (2) (I) (A) and 29CFR1910.179 (F) (2) (I) (B).
5.3. Crane/Hoist Documentation: The contractor shall stencil in a contrasting print color and in a conspicuous area of the unit the date and when the load test was completed. The contractor shall provide a written report of the load brake inspection and a load test certificate to the COR within 5 working days of the completion of each unit.
5.4. Crane/Hoist Parts: The contractor shall immediately notify the overhead crane maintenance supervisor of any replacement load brake parts that are needed to repair the unit and secure the unit to safety standards until replacement parts can be procured. Gear box lubricant and gear box gaskets will be provided by the contractor as part of the inspection. Any used parts replaced by the contractor will be returned to the overhead crane maintenance supervisor.
5.5. Clean up. The contractor shall immediately clean up all trash & debris created during the performance of the inspection, test & certification process.
5.6. Coordination. The contractor shall coordinate all work to be done on overhead crane testing with the business section, Randy LeBlanc (315-523-1538) building T-4000 at least 5 days in advance to schedule/coordinate downtime of cranes & hoists to be load tested.
Technical Exhibit: Crane/Hoist List; contains list of Public Works (PW/J) number, Description, Serial Number, Building Number location, MFG, Capacity, Model Number and inspection due dates.
AR 420–1 • 12 February 2008 Army Facilities Management Para 5-10 (a) The public works activity and the using agency/organization are responsible for the maintenance, repair, inspection, and testing of vertical lift devices, such as cranes, and hoists in accordance with 29 CFR 1910.