Questions and Answers W911RZ24Q0036.pdf
PDF 73 KB Posted
- Attached to
- Four Story Shoot House Renovation
- Solicitation number
- W911RZ24Q0036
About this file
This document contains a set of Questions and Answers related to Solicitation W911RZ24Q0036 for the renovation of a Four Story Shoot House. The solicitation is for services to repair, replace, and paint structural features of an existing military shoot house, including replacing the exterior walls and roof. Key details include:
The solicitation does not provide any details on the project threshold, existing structure, or budget/cost estimate. Potential contractors are asked to provide quotes for the requirement. The period of performance is from 30 September 2024 to 30 May 2025, with the solicitation closing on 23 September 2024 at 7:00 AM MST. The government will not provide design details or drawings, but will review any structural concerns identified by the contractor. Contractors are expected to meet safety requirements, but the shoot house is not subject to conventional construction standards. No further design work is required from the contractor beyond what is specified in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911RZ24Q0036 Combine Synopsis v3.pdf | ||
| W911RZ24Q0036 Combine Synopsis v2.pdf | ||
| Range 131 Overview Map.pdf | ||
| W911RZ24Q0036 Combine Synopsis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911RZ24Q0036
Four Story Shoot House Questions and Answers
Q: Could you please provide clarification on the project threshold, if any, for this particular solicitation?
A: That will not be disclosed. We are asking potential contractors to provide Quotes for this requirement.
Q: Do you have any pictures of the existing Structure?
A: Pictures provided in Solicitation Posting on SAM
Q: Do you have any measurements for the structure? Overall size would help.
A: No measurements to provide.
Q: Do you have any blueprints for this project?
A: No blueprints to provide.
Q: Do you have a projected Magnitude of this project or a budget?
Q: What is the engineer's estimated magnitude of the project?
Q: What is the length of the Period of Performance?
A: 30 September 2024 – 30 May 2025.
Q: Is the bidding date & time remains the same? Sept. 23, 7AM
A: Yes, Solicitation Closes 23 September 2024 @ 7:00 AM MST.
Q: Can I ask for a copy of the pre-bid attendees/planholders list?
A: No.
Q: How much will be the project cost magnitude or estimated cost?
Q: Is there any amendment issued to date?
A: Yes, Amendment to original Solicitation was published on 17 September 2024.
Q: Can you send me a copy of the SF 1449 (I only find the continuation pages)?
A: Full SF 1449 was added as Amendment on 18 September 2024.
Q:Can you extend the proposal due date to allow VCI time to accurately assess the costs and provide you with an acceptable proposal?
A: No, due to the time constraints of end of fiscal year.
Q: Will the government provide a design for the roof to meet the 150 lbs/SF requirement?, Specific Task 5.2.03. page 52 of 59.
A: There will not be a design provided; however, the existing configuration may be matched with like materials of equal or greater strength and durability. The roof is designed to meet the load requirements given joist material, spacing, and decking. The same specifications may be transferred to the new deck.
Q: Will the government provide a framing design for the "existing storage enclosure"?;
see Specific Tasks 5.3.01, page 52 of 59.
A: No. The storage enclosure will not be independently modified other than to tie the new stairwell enclosure together and roof accordingly.
Q: Who will identify "any structural concerns" and who will determine how each will be
"remediated"?; see Specific Tasks 5.4.02, page 52 of 59.
A: The Department of Public Works will review any structural concerns and plans for remediation as they are identified if necessary. Remediation with regards to this contract is limited to within the scope of work and materials as bid. Concerns regarding structural safety as the building exists will be addressed through DPW.
Q: If all frames are to "be wooden and 'overbuilt' to withstand window replacement and breaching." can the government provide a design or at least identify the type and size of the framing members?, see Specific Task 5.5.01. page 53 of 59.
A: A specific design will not be provided due to various dimensions. Existing fenestrations will be framed within the metal wall framing. The additional framing will be constructed of wood and include two layers – one firmly fixed to the existing metal frame and a secondary that will be nailed to the primary wood frame. The concept is that the interior wood frame will damage before the metal frames are damaged or deformed.
Q: Will the government provide a design for the decking /flooring to meet the 150 lbs/SF requirement?, see Specific Tasks 5.6.04, page 53 of 59.
A: There will not be a design provided; however, the existing configuration may be matched with like materials of equal or greater strength and durability. The roof is designed to meet the load requirements given joist material, spacing, and decking. The same specifications may be transferred to the new deck.
Q: Are there any design drawings for this project or are there any as-built drawings for this project?
A: No.
Q: What material is referred to in Specific Task 5.5.02, as "only bult [sic] up with heavy duty, reinforced framing."? see question 4. above.
A: Same requirements as specified in 5.5.01, wood. Existing fenestrations will be framed within the metal wall framing. The additional framing will be constructed of wood and include two layers – one firmly fixed to the existing metal frame and a secondary that will be nailed to the primary wood frame. The concept is that the interior wood frame will damage before the metal frames are damaged or deformed.
Q: If any design work is required of the contractor what design criteria / standard are the expected to meet?
A: This is a training building and is not subject to conventional construction standards.
Designs that modify the structure will be subject to DPW approval as needed for safety purposes.