Industry Questions and Answers
Solicitation W911RX-18-Q-0078
Fort Riley, KS
1. Will work be required within the UXO-impacted/hazard area?
NO
2. Is there a concern for UXO outside the target areas?
NO
3. Will the Army survey and clear the area for UXO prior to the work being performed? We assume the limits of UXO clearance are a minimum of 50 yards on each side of the underground fiber optic line where excavation is to be performed.
Not needed
4. Are any concrete repairs required under this contract?
NO
Additional comments**
The contractor would need to call in their own locates for any digging they would be doing.
The electrical portion of the project will be done by DPW electricians, so any needed coordination would need to be done through them to set up times.
The provided as-builds should address some of the questions by reviewing them.