PRS,_W911RX-18-Q-0062.pdf
PDF 53 KB Posted
- Attached to
- Aerial Control Burn Services for Fort Polk, LA
- Solicitation number
- W911RX-18-Q-0062
About this file
Performance Requirements Summary, W911RX-18-Q-0062.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS_Final,_W911RX-18-Q-0062.pdf | ||
| Attachment_1,_RFQ_Solicitation,_W911RX-18-Q-0062.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE REQUIREMENTS SUMMARY
For use of this form, see DA PAM 5-20; the proponent agency is ACSIM.
REQUIRED
SERVICE
PARAGRAPH
NUMBER STANDARD
MAXIMUM ALLOWABLE
DEGREE OF DEVIATION
FROM REQUIREMENT (AQL)
METHOD OF
SURVEILLANCE
THE PROPORTION
OF REQUIRED
SERVICE TO TOTAL
CONTRACT PRICE
DA FORM 5473, MAR 2008 APD LC v1.00PREVIOUS EDITIONS ARE OBSOLETE.
PERFORMANCE REQUIREMENTS SUMMARY
For use of this form, see DA PAM 5-20; the proponent agency is ACSIM.
REQUIRED
SERVICE
PARAGRAPH
NUMBER
STANDARD
MAXIMUM ALLOWABLE
DEGREE OF DEVIATION
FROM REQUIREMENT (AQL)
METHOD OF
SURVEILLANCE
THE PROPORTION
OF REQUIRED
SERVICE TO TOTAL
CONTRACT PRICE
DA FORM 5473, MAR 2008
APD LC v1.00
PREVIOUS EDITIONS ARE OBSOLETE.
1.00
DA FORM 5473-R, NOV 1985
PERFORMANCE REQUIREMENTS SUMMARY
APD
| REQ_SERV: Contractor Furnished Equipment |
| REQ_SERV_1: Contractor Personnel Qualifications |
| REQ_SERV_2: In-Flight Operations |
| REQ_SERV_3: Flight Requirements during PSD Ops |
| REQ_SERV_4: |
| REQ_SERV_5: |
| REQ_SERV_6: |
| REQ_SERV_7: |
| REQ_SERV_8: |
| REQ_SERV_9: |
| REQ_SERV_10: |
| PARAGRAF: C.4.4 |
| PARAGRAF_1: C.4.5 |
| PARAGRAF_2: C.5.2.1 |
| PARAGRAF_3: C.5.2.14 |
| PARAGRAF_4: |
| PARAGRAF_5: |
| PARAGRAF_6: |
| PARAGRAF_7: |
| PARAGRAF_8: |
| PARAGRAF_9: |
| PARAGRAF_10: |
| STANDARD: Contractor shall provide equipment that meets the standards IAW PWS C.4.4 |
| STANDARD_1: Contractor Personnel shall meet the qualifications listed in PWS C.4.5 |
| STANDARD_2: Contractor shall perform all In-Flight Operations IAW PWS C.5.2.1 |
| STANDARD_3: Contractor shall perform within the standards listed in PWS C.5.2.14 during PDS Ops |
| STANDARD_4: |
| STANDARD_5: |
| STANDARD_6: |
| STANDARD_7: |
| STANDARD_8: |
| STANDARD_9: |
| STANDARD_10: |
| AQL: 0% |
| AQL_1: 0% |
| AQL_2: 0% |
| AQL_3: 0% |
| AQL_4: |
| AQL_5: |
| AQL_6: |
| AQL_7: |
| AQL_8: |
| AQL_9: |
| AQL_10: |
| METHOD: 100% |
| METHOD_1: 100% |
| METHOD_2: 100% |
| METHOD_3: 100% |
| METHOD_4: |
| METHOD_5: |
| METHOD_6: |
| METHOD_7: |
| METHOD_8: |
| METHOD_9: |
| METHOD_10: |
| PROPORTN: 100% |
| PROPORTN_1: 100% |
| PROPORTN_2: 100% |
| PROPORTN_3: 100% |
| PROPORTN_4: |
| PROPORTN_5: |
| PROPORTN_6: |
| PROPORTN_7: |
| PROPORTN_8: |
| PROPORTN_9: |
| PROPORTN_10: |
File details come from the government source that posted it.