PRS_Knoll_Workstations.docx

DOCX document 38 KB Posted

Attached to
Installation & Relocation of Workstations
Solicitation number
W911RX-18-Q-0032
Issued by

About this file

Performance Requirements Summary

View the file

Other files

File Type Posted
PWS_Knoll_Workstations.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

Performance Requirements Summary (CHRA Furniture Installations & Relocations)

1. PURPOSE: The purpose of this exhibit is to:

1.1 List the contract requirements considered most critical to acceptable contract performance. These requirements are listed as Required Services (RS). These requirements are not to be construed as the only performance indicators to be utilized by the Contracting Officer (CO) in determining satisfactory performance of the contract. As Contract Discrepancy Reports (CDRs) are issued for other than performance indicators listed here, the criticality of CDRs will be determined by the Contracting Officer and a corresponding deduction for nonperformance will be assessed.

1.2 Summarize or establish the standard for perfect performance required by the contract for each required service.

1.3 Establish the maximum allowable degree of deviation from perfect performance for each requirement (Acceptable Quality Level-AQL) that shall be allowed by the Government before contract performance is considered unsatisfactory.

1.4 Explain the quality assurance method of surveillance the Government will use for each required service to evaluate the Contractor's performance in meeting the contract requirements.

1.5 Show the value or percentage of the contract price that each listed required service represents.

1.6 Define the procedure the Government will use in reducing the Contractor's weekly payment if satisfactory performance is not rendered by the Contractor.

2. QUALITY ASSURANCE METHODS: The Government's primary quality assurance procedures (method of surveillance) are based on random sampling of the critical output products (required service) of the contract using the concepts of ASQC Z1.4. Some contract requirements will, however, be surveilled by using Government or Contractor reports, by periodically reviewing the Contractor's work (i.e., monthly, quarterly, semi- annually), by using other methods of surveillance (planned sampling, 100% inspection, or customer comments), or by using a combination of these methods.

3. ACCEPTANCE CRITERIA: The criteria for acceptable and unacceptable performance under this contract shall be as follows:

3.1 Required Services Surveilled by Random Sampling: Criteria shall be as derived from ASQC Z1.4 based on the lot size, sample size, and acceptable quality level (AQL) for each required service. When the number of defects in the Contractor's performance discovered by the Quality Assurance Evaluation (QAE) exceeds the acceptable level, the Contractor shall be required to complete a CDR. The CDR requires the Contractor to

Performance Requirements Summary

Note: Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.

explain in writing why performance was unacceptable, how performance shall be returned to acceptable levels, and how recurrence of the problem shall be prevented in the future.

3.2 Required Services Surveilled by Other than Random Sampling: The criteria for non- sampled requirement were established based upon the level of performance deemed acceptable to the Government. The use of the CDR as described above applies to these requirements as well.

4. DEDUCTIONS: All work not in compliance with the contract requirements is subject to deductions. Payments to the Contractor will be reduced for documented defects using the following methods.

4.1 Each month, the Contractor's performance will be compared to contract standards and acceptable quality levels using the Government's Quality Assurance Surveillance Plan (QASP).

4.2 When the Contractor's performance level as determined by the number of defects and acceptable quality levels warrants a deduction and the poor performance is not caused by reasons beyond the control of the Contractor, the amount of money to be withheld or permanently deducted from the amount otherwise payable to the Contractor will be computed as follows:

4.3 Defect Deduct. For performance measured by random sampling, the deduction is equal to the total price for service for that quarter times the percent of the sample found defective. For performance measured by other than random sampling, the deduction is equal to the total price for service for that quarter times the percent of the entire lot found defective.

5. QUALITY AND TIMELINESS: Certain required services under this contract may be subject to evaluation for both quality of service and timeliness of service. Note that the acceptable quality level (AQL) for quality of service may be different than the AQL for timeliness of service. The figures to be used for AQL for quality of service and timeliness of service are indicated in the Performance Requirements Summary Table.

6. OTHER RIGHTS: The rights of the Government and remedies described in the Performance Requirements Summary are in addition to all other rights and remedies set forth in this solicitation. Any deductions pursuant to the PRS shall reflect the reduced value of services performed under the present contract. The Contractor shall not be

Relieved of full performance of the services hereunder and may be terminated for default based upon inadequate performance of service even if a deduction was previously taken for inadequate performance. The Government may modify the type and frequency of inspection of items surveyed based on the Contractor's performance.

7. EXPECTED PERFORMANCE: The enumeration of critical services and allowable degrees of deviation from perfect performance in the Performance Requirements Summary are not intended and should in no way be construed to indicate that the Government has bargained for anything less than satisfactory performance of all required services by the Contractor.

8. REPERFORMANCE: The Government reserves the right to require the Contractor to re- perform any or all defective work, or perform late any incomplete or nonperformance disclosed by Government inspection or customer complaint. The Contractor will be given 5 days to re-perform work evaluated as unsatisfactory when applicable.

Performance Objective
Performance Standard
Performance Threshold
Incentive / disincentive

PWS para 5.1. The Contractor shall provide all personnel, equipment, labor, and transportation Necessary to perform the relocation, reconfiguration, disassembly, reassembly and installation of existing workstations and/or new workstations. The contractor shall verify all site conditions, inventory, check equipment and dimensions prior to starting. The contractor shall inspect all work stations, prior to disassembly and moving, and note any damage that is present and present a list to the government. Any other damage due to disassembly or moving will be the contractor’s responsibility to fix or replace at no cost to the government. Workstations will need to be resized to be able to fit additional stations-parts will need to be reused and new parts added as needed. The contractor shall provide and install the following furniture components and items as depicted on the attached floor plans/designs.

Contractor shall disassemble the workstations to a level that it can be moved, transported and re-assembled without damages. Parts, hardware and components, if removed, shall be clearly marked as sets and integrity maintained with the major end item. All workstations shall be wrapped and or package as needed to prevent damage.
Contractor shall provide a written document to the COR identifying the following for no less than 95% of the time: building number, room number, item description, and recordings of all damages prior to movement. The Contractor and the Government at time of completion shall sign the written document.

Cost damages beyond the liability insurance coverage to may be deducted from the contract price IAW Section

5.1.5 at cost to the Government

PWS para 5.2. When required, the Contractor shall Provide vehicle(s) that protects the items from damage during transporting all items as prescribed by the COR or task order.
Contractor shall move the workstation to and from the transport vehicle without causing damage to the item, facility, and/or other Government property located at Fort Riley. All workstations shall be transported with all necessary padding, blocking and tie- downs to allow transportation without damage.
The Contractor shall ensure 100% of all vehicles and drivers comply with municipal, State, and Federal laws, ordinances, rules and regulations applicable to the business carried on under this contract.

The Contractor shall maintain a log on any damages or losses that occur during transporting for no less than 95% of the items.

Cost damages beyond the liability insurance coverage to may be deducted from the contract price IAW Section

PWS para 5.3 The Contractor shall re-assemble workstations within the designated facility.
Contractor shall re-assemble workstations back to original state without damage to the item or facility at the designated area identified by the COR. All hardware and components must be secured to ensure item is safe and functional.
Contractor shall provide a written document to the COR identifying the following for no less than 95% of the time: building number, room number, item description, and recordings of all damages after movement to designated area. The Contractor and the Government at time of completion shall sign the written document.

Cost damages beyond the liability insurance coverage to may be deducted from the contract price IAW Section

File details come from the government source that posted it.