ATTACHMENT 6
SUBMITTALS
1. Where to Submit: The Contractor submit submittals to the Contracting Officer, Mission and Installation Con-tracting Command, Directorate of Contracting, 1792 12th Street, Fort Riley, Kansas 66442.
2. When to Submit: Submit submittals when required in the schedule below. The first delivery order will not be issued until the required submittals have been approved by the Government. The approved Quality Control Plan, Accident Prevention Plan, and Management Plan shall be implemented not later than the contract start date. The Contractor shall resubmit the plans within 5 working days prior to any proposed changes in the plans.
3. What to Submit: All submittals shall be accompanied by properly filled out ENG Form 4025 (Mar 2012), Trans-mittal of Shop Drawings, Equipment Data, Material Samples, or Manufacturer’s Certificates of Compliance. This ENG Form in Adobe .pdf fillable form format is available without cost at http://www.usace.army.mil/publications/.
Submittals shall be grouped together by paragraph in the PWS and submitted on one ENG 4025 form for each para-graph. Submit one copy of all submittals for review in Adobe .pdf format on a CD-RW or DVD+RW disc along with one item of any required physical material samples. The Government will review the submittals, enter the ap-propriate Submittal Action Code in column i on ENG Forms 4025 and return the submittals to the Contractor on the CD-RW or DVD+RW along with any physical material samples. The preceding requirements also apply to any nec-essary resubmissions.
Referenced Section and Paragraph or Sheet Number Description of Submittal When to Submit
PWS 1.6.4.2 Quality Control Plan Post Award Conference
PWS 1.6.4.3.1 QC/QA Daily Reports 9:00 a.m. the following workday
PWS 1.6.11 Supervisor’s Experience and Description of Project Management Organization Post Award Conference
PWS 1.6.12.1 Personnel List 15 calendar days following contract award
PWS 1.6.19.1, 1.6.19.3,
and 1.6.19.4
AT Level I and OPSEC Awareness Train-ing Completion Certificates, and iWatch Program Information Briefing Report
Refer to paragraphs
PWS 1.6.26.2 Accident Prevention Plan Post Award Conference
PWS 4.4.1, 4.4.2.1, and 4.4.2.2
Washer and Dryer Specifications 15 calendar days following contract
PWS 4.4.3 Conformance to Industry Safety Stand-ards 15 calendar days following contract
PWS 4.4.6 Machine List 15 calendar days following delivery of the machines
PWS 4.4.7 Sample of Machine Label 15 calendar days following contract
PWS 4.5 Samples of Records, Reports, and Forms 15 calendar days following contract
PWS 5.1.1 Phase-In/Phase-Out Transition Schedule Post Award Conference
PWS 5.7 Management Plan Post Award Conference
PWS 5.8.1 Contractor Manpower Reporting NLT the 21st day of each month pre-ceding the month to which the schedule applies