This document consists of questions and responses related to a federal solicitation for chrome plating services on MLRS elevation actuator shafts. The solicitation, W911RQ-24-R-0119, is seeking a contractor to receive, pre-clean, chrome plate, finish, and pack MLRS elevation actuator tubes for the Department of the Army Materiel Command Contracting Command Detroit Arsenal.

The key details include: a 10 per month delivery target with a 4-week turnaround, contractor milestones of receiving, pre-cleaning, plating, finishing, and packing the tubes, this being a new contract with a previous incumbent (Masterson Industries, Inc.), the tube dimensions of approximately 5 feet long with a finished diameter range of 3.905 - 3.917 inches, the amount of chrome plating required being 48.1 grams, the Government providing shipping to and from the contractor's facility, and the base material of the tubes being 4130 steel. No drawings are available, as the Government is performing all prefabrication and prep work prior to the tubes being sent to the contractor for chrome plating.

View the file

Other files

File Type Posted
Chrome Tubes.png PNG image
Amend 1 Comb Synop Sol Chrome Plating 6.6.2024.pdf PDF
Comb Synop Sol Chrome Plating.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Responses

W911RQ‐24‐R‐0119

Chrome Plating MLRS Elevation Actuators Solicitation

Q1. Will you tell me a bit more about Section 1.5 Period of Performance?

R1. In a perfect world with no delays in production, expect 10 each per month delivered to contractor site for processing, with expected turn around not to exceed 4 weeks in having processed tubes back to RRAD site. In the event there are delays with tear down due to capacity constraints due to machine break down contractor should expect 4‐6 per month and the adjustments will be communicated through the Program Manager to the contractor. If possible, can the tubes be processed and turned around in 2 weeks, to attempt to expedite and get back closer to the original schedule?

Q2. Clarity on the contractor milestones?

R2. Milestones for contractor:

Receive, pre‐ clean, chrome, plating, finish, and pack.

The main prep work for fabrication to the drawing will be done at RRAD prior to shipping to contractor. Packing will be in special shipping crates to the contractor and shall be used to return the completed tubes back to RRAD.

Q3. Is this a brand new contract OR if there is (was) an incumbent performing these services?

R3. This will be a brand new contract, but there was a previous contract for this service with

Masterson Industries, Inc. (UEI: SHFMC3D2KVT6).

Q4. If not brand new, could you please provide the current / previous contract number and value?

R4. The previous contract numbers were W911RQ‐21‐V‐0016, W911RQ‐21‐V‐0016 P00001, W911RQ‐21‐V‐0016 P00002, and W911RQ‐21‐V‐0016 P00003.

21‐V‐0016 was the base contract and was for $250,000.

Q5. Is it possible to get some clarification on if these are tubes or shafts?

R5. They are steel tubes ‐ 4130 Steel. Hollow with threads in each end.

Q6. What are the sizes of the parts that we are looking at plating? Diameter and length? Do they have pistons on them?

R6. Finished diameter range: 3.905 ‐ 3.917, Length approx. 5 foot, No Pistons

Q7. In the scope of work it does not list the amount of chrome plating we are going to be adding, and will we need to strip any existing chrome from the rods?

R7. RRAD is prepping the tube to remove all previous coating. Contractor will receive a bare tube with possibly some light oil to prevent flash rusting. Contractor will need to pre clean the tube to ensure good chrome adhesion.

Please see section 5.1 Chroming Specifications of the solicitation.

The amount of chrome to be added is 48.1 grams (1.69 oz).

Q8. Will we be expected to grind or polish the diameters?

R8. Polish

Q9. Is weld repair acceptable?

R9. RRAD is doing all of the prefabrication and prep work. Contractor is only chroming the tube.

Q10. What is the base material of these components?

R10. Base metal ‐ 4130 Steel

Q11. If there is a drawing available is it possible to offer replacement cost as well?

R11. N/A. RRAD is doing all of the prefabrication and prep work. Contractor is only chroming the tube.

Q12. Are we plating the entire part?

R12. Only plating the main OD and the groove on the outside.

Q13. Can you please provide us with the Drawings for the part?

R13. N/A

Q14. Will RRAD pay for shipping to and from our shop?

R14. Yes this is still viable.

The Government FedEx Account will still be utilized for this chrome tube requirement.