Attachment_0002_-_Performance_Based_Matrix_Table.pdf
PDF 187 KB Posted
- Attached to
- Bldg 63-410 Electrical Service Upgrade
- Solicitation number
- W911RP-19-T-0004
About this file
Attachment 0002 - Performance Based Matrix
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE BASED MATRIX TABLE
PERFORMANCE
OBJECTIVE
PWS PERFORMANCE THRESHOLD
METHOD OF
SURVEILLANCE
1. Provide overhead service, disconnect, and overhead transformers, connect to building at weather-head.
Scope Work completed with no obvious errors.
Inspection
2. Test voltage and phase rotation before connection of service
Scope Test indicates correct phase rotation and three phase motors subsequently turn right direction
Inspection and send written (email) message containing test procedure and result
3. Notify the government COR of reason for equipment failure prior to proceeding with repair.
Scope Fault information provided to COR.
Repairs do not proceed without approval from COR
Inspection
4.
Report injury incidents
Scope Report incidents within one hour to the KO or designated COR with all available facts.
Upon receipt of incident report
File details come from the government source that posted it.