17-3-4850 ECU Frame_Revised_17 July 2026.pdf

PDF 363 KB Posted

Attached to
Custom Metal Fabrication Services for Specialty Tactical Shelters and Ancillary Equipment
Solicitation number
W911QY26RCUSTOMMETALFAB
Issued by

About this file

This document set comprises engineering drawings and parts lists for an ECU (Electronic Control Unit) Frame Assembly for the U.S. Army Futures Command, Combat Capabilities Development Command, Soldier Center, located in Natick, Massachusetts.

The ECU Frame Assembly consists of multiple welded and fabricated aluminum components, including a frame weldment assembly, vertical and horizontal rectangular tubes, angle rectangular tubes, a U-channel, end cap tubes, spacer panels, and various fasteners (rivets and rivet mount nuts). The primary components are manufactured from aluminum per ASTM B221 and B22.1 specifications, with wall thicknesses of .125 inches and specific dimensional requirements outlined in detailed engineering drawings. Component materials include 6061-T6 aluminum for channels and angle pieces, and 6063-T5 aluminum per ASTM B221 for the U-channel. Manufacturing requirements include removal of burrs and sharp edges, MIL-STD-130 identification markings, and chemical conversion coating per MIL-DTL-5541 Class 3 specifications. The assembly incorporates eight rivet fasteners (MS24243/5A304 and MS24243/5A406 specifications) and four rivet mount nuts (NASM21075 specification). Individual component drawings specify dimensions, tolerances, and manufacturing notes. All drawings were initially released July 25, 2008, with subsequent revisions and fabrication updates noted through July 2026. The documentation includes revision status tracking and distribution statements indicating approval for public release with unlimited distribution.

View the file

Other files

File Type Posted
17-3-4850 ECU Frame.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U Channel is not shown correctly in Detail A or Top and Bottom views. See Drawing 17-3-4854.

2.00

1.00

.417

.583

.281±.002

.562±.002

2X .125

2X .730+ .030 .000

NOTES:

MATERIAL: ALUMINUM 6061-T6 PER ASTM B2211.

REMOVE ALL BURRS AND BREAK SHARP EDGES.2.

IDENTIFY PER MIL-STD-130.3.

A A

B B

C C

D D

ECU FRAME U

CHANNEL

17-3-4854

SHEET 1 OF 1

26-07-08L. WOLFE

UNLESS OTHERWISE SPECIFIED:

SCALE: 4:1 WEIGHT:

REVDWG. NO.

C

SIZE

TITLE:

NAME DATE

COMMENTS:

Q.A.

MFG APPR.

ENG APPR.

CHECKED

DRAWNDIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONS

ANGLES

TWO PLACE DECIMAL 0.03

THREE PLACE DECIMAL 0.010

APPLICATION

USED ONNEXT ASSY

17-3-4851 17-3-5800 17-3-5700

U.S. ARMY FUTURES COMMAND, COMBAT CAPABILITIES

DEVELOPMENT COMMAND, SOLDIER CENTER

GENERAL GREENE AVE, NATICK, MA, 01760-5056

Revised for Fabrication on 17 July 2026. -JF

17-3-4850 ECU Frame_Revised_17 July 2026.pdf
PL17-3-4850 (2).pdf
PL17-3-4850s001-TO
PL17-3-4850s002-TO
PL17-3-4851 (1).pdf
PL17-3-4851s001-TO
PL17-3-4851s002-TO
17-3-4857 (2).pdf
Sheets and Views
17-3-4857-Layout1
17-3-4858 (2).pdf
Sheets and Views
17-3-4858-Layout1
17-3-4861 (2).pdf
Sheets and Views
17-3-4861-Layout1
17-3-4854 Repaired 2.pdf
Sheet1
Drawing View1
Drawing View2

File details come from the government source that posted it. Updated .