Amendment_0001.pdf
PDF 322 KB Posted
- Solicitation number
- W911QY18R0034
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 07_Amendment_0007.pdf | ||
| Amendment_0006.pdf | ||
| Attachment_7_Component_List_.xlsx | XLSX spreadsheet | |
| Attachment_2_Fabrics_Revised_.xlsx | XLSX spreadsheet | |
| Attachment_6__3D_Base_Layer_Undershirt_and_Drawer_Drawing.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Atatchment_6_Drawings.pdf | ||
| Attachment_3_52.212-3_Reps_&_Certs.pdf | ||
| Attachment_5_Solicitation_Clauses.pdf | ||
| Attachment_2_Fabrics.xlsx | XLSX spreadsheet | |
| Attachment_4_Past_Performance_Questionnaire.pdf | ||
| Attachment_1_Supply_Requirement.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment00001 to W911QY18R0034
For Cold Temperature and Artic Protective System (CTAPS) Project
Answers to Technical Questions:
1. Are all required materials already in stock/ available on request?
Answer: Most materials are in stock. The offerors will need to verify with the fabrics vendors the availability.
2. If all required materials are not available right away, have Natick placed a production order already?
Answer: No.
3. Does Natick have a vendor to perform a dyeing of the base layer material? Is it required piece dyeing or garment dyeing?
Answer: No, and either piece dyeing or garment dyeing is acceptable.
4. Would the fabric mill of the base layer material perform piece dyeing?
Answer: The offerors will need to verify with the mill if that is an option.
5. Does Natick expect the recommendations, suggestions and ideas for the Design Review to only be communicated with a physical sample or it can me Illustrations and make be small mock up component samples(not a full garment)?
Answer: Illustrations that are accompanied with small mock up component samples (not a full garment) is sufficient for the design review.
6. What is the timeline for the First Design Review after award date?
Answer: The first design review shall be held within 5 business days of contract award.
7. Once the recommendations are discuss and either approved or disapproved during the Design Review, does Natick require a Physical prototype to represent the changes? Let's call this Proto #1.
Answer: Once the recommendations are discussed and either approved or disapproved during the Design Review.
8. If Proto #1 is required, what is the purpose of the samples (let's call them Proto #2) that are being asked for, using a surrogate materials?
Answer: Natick does require a Physical prototype to represent the changes which will serve as the mock up sample using surrogate material.
9. Is there an option of a face to face Design review and Pre-production meeting?
Answer: Yes, these meetings can be held at NSRDEC.