CODE

(Hour)

PAGE(S)

until local time

X

A X B X C X D

EX

X

G F 73 - 80

81 - 89 X H 90 - 95

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 95

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W911QY 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 32

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

33 - 43 44 - 46

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

47 - 49 50 - 53

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 54 - 56 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 57 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

58 - 70

PART II - CONTRACT CLAUSES

W6QK ACC-APG NATICK

100 MEDWAY RD SUITE 301

MILFORD MA 01757

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

71 - 72

6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W911QY-17-R-0020

Section A - Solicitation/Contract Form

SUPPLEMENTAL INFORMATION

A.1. The Army Contracting Command – Aberdeen Proving Ground (ACC-APG), Natick Contracting Division has a requirement for Improved Environmental Control Units (9K/18K/36K IECU’s).

A.1.1. The Government plans to award a single Firm Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract. The anticipated contract is planned to be structured with a five year production period spread out in two distinct phases: 1) A twelve (12) month, Low Rate Initial Production (LRIP) phase initiated after contract award; and 2) A four (4) year Full Rate Production (FRP) phase initiated after Milestone Decision Authority (MDA) FRP decision approval. The minimum contract value will be $400,000.00 and the maximum contract value will be $110,000,000.00.

A.1.2. This requirement is subject to the availability funds.

A.1.3. Proposals shall be valid for 180 days after the closing date of the solicitation. Contractors shall clearly indicate the period of validity.

A.1.4. Contractors will not be reimbursed for any proposal preparation costs.

A.1.5. Proposals are due NLT INSERT TIME. EDT INSERT DAY, MONTH, YEAR..

A.2. The Government anticipates awarding a single FFP IDIQ contract as a result of this solicitation;

however the Government reserves the right to award one or no contracts at the Government's discretion. Funds will be obligated for quantities ordered upon issuance of delivery orders and not by the basic contract.

A.3. This acquisition is for a 100% Small Business Set-Aside. The North American Industry Classification System NAICS Code is 333415, and the size standard is 1,250 employees.

A.4. The solicitation including Amendments, Exhibits and Attachments listed in Section J, may be downloaded from the Natick Contracting Division website: http://www3.natick.army.mil/IECU.aspx.

A.5. Proposals shall be addressed to the following:

Army Contracting Command – Aberdeen Proving Ground Natick Contracting Division (CCAP-SCN) Milford B Branch ATTN: Nicole Bernier Subject: W911QY-17-R-0020 15 General Greene Avenue, Bldg 1, 3rd Floor Natick, MA 01760

A.6. Prior to hand delivering proposals offerors shall coordinate the delivery with Nicole Bernier via email at nicole.e.bernier.civ@mail.mil.

A.7. Offerors shall access http://www.assistdocs.com herein for all Mil-STD’s referenced in this document for complete up to date information.

A.8. In the event of any conflict or ambiguity between the Contractor's Technical Proposal and the Government's Technical Specification, the Government's Technical Specification takes precedence.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 8 Each First Article Test Units

FFP

9,000 Btu/hr., 115 volt, single phase, 50/60 Hertz. IAW Paragraph C.2.1. of the SOW. IAW FAR 52.209 First Article Approval - Contractor Testing.

FOB: Destination

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 8 Each First Article Test Units

FFP

18,000 Btu/hr., 230 volt, single phase 60 Hertz. IAW Paragraph C.2.1. of the

UNIT UNIT PRICE MAX AMOUNT

0003 8 Each First Article Test Units

FFP

18,000 Btu/hr., 208 Volt, 3-phase, 60 Hertz. IAW Paragraph C.2.1. of the SOW.

IAW FAR 52.209 First Article Approval - Contractor Testing

UNIT UNIT PRICE MAX AMOUNT

0004 8 Each First Article Test Units

FFP

36,000 Btu/hr., 208 Volt, single Phase, 60 Hertz. IAW Paragraph C.2.1. of the

UNIT UNIT PRICE MAX AMOUNT

0005 UNDEFINED Each Low Rate Initial Production Units

FFP

Production Year 1. 9,000 Btu/hr., 115 volt, single phase, 50/60 Hertz. IAW Paragraph C.2.5. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0006 UNDEFINED Each Low Rate Initial Production Units

FFP

Production Year 1. 18,000 Btu/hr., 230 volt, single phase 60 Hertz. IAW

UNIT UNIT PRICE MAX AMOUNT

0007 UNDEFINED Each Low Rate Initial Production Units

FFP

Production Year 1. 18,000 Btu/hr., 208 Volt, 3-phase, 60 Hertz. IAW Paragraph C.2.5. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0008 UNDEFINED Each Low Rate Initial Production Units

FFP

Production Year 1. 36,000 Btu/hr., 208 Volt, single Phase, 60 Hertz. IAW

UNIT UNIT PRICE MAX AMOUNT

0009 1 Job Integrated Master Schedule (IMS)

FFP

Production Year 1. IAW CDRL A001 and Paragraph C.1.6. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0010 1 Job Configuration & Control Documents (PCA)

FFP

Production Year 1. Physical Configuration Audit (PCA). IAW CDRL A002 and Paragraph C.3.4.2. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0011 1 Job Failure Analysis (TIR's)

FFP

Production Year 1. Test Incident Reports (TIRs). IAW CDRL A003 and Paragraphs C.2.3.1. and C.3.3.1. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0012 1 Job First Article Test (FAT) Plan

FFP

Production Year 1. IAW CDRL A004 and Paragraph C.2.2. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0013 1 Job First Article Test (FAT) Report

FFP

Production Year 1. IAW CDRL A005 and Paragraph C.2.3.3. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0014 1 Job Product Drawings & Associated Drawings

FFP

Production Year 1. IAW CDRL A006 and Paragraph C.2.4. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0015 1 Job Special Packaging Instructions (SPI)

FFP

Production Year 1. IAW CDRL A007 and Paragraph C.3.1.3. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0016 1 Job Packaging PDDR

FFP

Production Year 1. Product Definition Data Requirements (PDDR). IAW CDRL A008 and Paragraphs C.4.2. and C.4.3. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0017 1 Job Item Unique Identification (IUID)

FFP

Production Year 1. IAW CDRL A009 and Paragraph C.3.7.1. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0018 1 Job IPRD - Operator

FFP

Production Year 1. Instructional Performance Requirements Documents (IPRD).

IAW CDRL A010 and Paragraph C.5.3. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0019 1 Job IPRD – Maintainer

FFP

Production Year 1. Instructional Performance Requirements Documents (IPRD).

IAW CDRL A011 and Paragraph C.5.3. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0020 1 Job Instructional Media Package (IMP)

FFP

Production Year 1. IAW CDRL A012 and Paragraph C.5.3. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0021 1 Job LRIP Status Reports

FFP

Production Year 1. Low Rate Initial Production (LRIP). IAW CDRL A013 and Paragraph C.2.6. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0022 1 Job Document Control Number (DCN)

FFP

Production Year 1. IAW CDRL A017 and Paragraph C.3.4.8. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0023 1 Job Program of Instruction (POI) - Operator

FFP

Production Year 1. IAW CDRL A018 and Paragraph C.5.1. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0024 1 Job POI – Maintainer

FFP

Production Year 1. Program of Instruction (POI). IAW CDRL A019 and Paragraph C.5.1. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0025 1 Job Lesson Plan/Training Guide/Visual Aids

FFP

Production Year 1. Lesson Plan/Training Guide/Visual Aids – Operator.

IAW CDRL A020 and Paragraph C.5.1. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0026 1 Job Lesson Plan/Training Guide/Visual Aids

FFP

Production Year 1. Lesson Plan/Training Guide/Visual Aids – Maintainer.

IAW CDRL A021 and Paragraph C.5.1. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0027 1 Job Interactive Multimedia Instruction (IMI)

FFP

Production Year 1. Interactive Multimedia Instruction (IMI) – Operator.

IAW CDRL A022 and Paragraph C.5.3.1. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0028 1 Job Interactive Multimedia Instruction (IMI)

FFP

Production Year 1. Interactive Multimedia Instruction (IMI) – Maintainer.

IAW CDRL A023 and Paragraph C.5.3.1. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0029 1 Job Code of Conduct & IKPT

FFP

Production Year 1. Conduct of Training/Instructor Key Personnel Training (IKPT). IAW CDRL A024 and Paragraph C.5.2.2. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0030 1 Job Conduct FAT

FFP

Production Year 1. IAW with Paragraph C.2.3. of the SOW, IS and PD.

UNIT UNIT PRICE MAX AMOUNT

0031 1 Job Shipping

FFP

Production Year 1. IAW with Paragraph C.3.8. of the SOW, IS and PD.

UNIT UNIT PRICE MAX AMOUNT

0032 UNDEFINED Each Spare and Repair Parts

FFP

Offeror shall submit pricing in Attachment 0003 Spares and Repair Parts Pricing IAW with Paragraph C.3.10. of the SOW, IS and PD.

UNIT UNIT PRICE MAX AMOUNT

0033 1 Job Safety Assessment Report (SAR)

FFP

Production Year 1. IAW with C.2.1. and C.2.3.3. of the SOW and CDRL A025.

UNIT UNIT PRICE MAX AMOUNT

1001 UNDEFINED Each Full Rate Production

FFP

Production Year 2. 9,000 Btu/hr., 115 volt, single phase, 50/60 Hertz.

IAW with Paragraph C.3.1. of the SOW, IS, and PD.

UNIT UNIT PRICE MAX AMOUNT

1002 UNDEFINED Each Full Rate Production

FFP

Production Year 2. 18,000 Btu/hr., 230 volt, single phase 60 Hertz. IAW with Paragraph C.3.1. of the SOW , IS, and PD.

UNIT UNIT PRICE MAX AMOUNT

1003 UNDEFINED Each Full Rate Production

FFP

Production Year 2. 18,000 Btu/hr., 208 Volt, 3-phase, 60 Hertz. IAW with

UNIT UNIT PRICE MAX AMOUNT

1004 UNDEFINED Each Full Rate Production

FFP

Production Year 2. 36,000 Btu/hr., 208 Volt, single Phase, 60 Hertz. IAW with

UNIT UNIT PRICE MAX AMOUNT

1005 1 Job Full-Rate Production (FRP) Test Plan

FFP

Production Year 2. IAW CDRL A014 and Paragraph C.3.1.1. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

1006 1 Job Full-Rate Production (FRP) Test Report

FFP

Production Year 2. IAW CDRL A015 and Paragraph C.3.1.1.1. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

1007 1 Job Full-Rate Production (FRP) Status Report

FFP

Production Year 2. IAW CDRL A016 and Paragraph C.3.2. of the SOW.

UNIT UNIT PRICE MAX AMOUNT

2001 UNDEFINED Each Full Rate Production

FFP

Production Year 3. 9,000 Btu/hr., 115 volt, single phase, 50/60 Hertz. IAW with Paragraph C.3.1. of the SOW, IS and PD.

UNIT UNIT PRICE MAX AMOUNT

2002 UNDEFINED Each Full Rate Production

FFP

Production Year 3. 18,000 Btu/hr., 230 volt, single phase 60 Hertz. IAW with

UNIT UNIT PRICE MAX AMOUNT

2003 UNDEFINED Each Full Rate Production

FFP

Production Year 3. 18,000 Btu/hr., 208 Volt, 3-phase, 60 Hertz. IAW with

UNIT UNIT PRICE MAX AMOUNT

2004 UNDEFINED Each Full Rate Production

FFP

Production Year 3. 36,000 Btu/hr., 208 Volt, single Phase, 60 Hertz. IAW with

UNIT UNIT PRICE MAX AMOUNT

3001 UNDEFINED Each Full Rate Production

FFP

Production Year 4. 9,000 Btu/hr., 115 volt, single phase, 50/60 Hertz. IAW with

UNIT UNIT PRICE MAX AMOUNT

3002 UNDEFINED Each Full Rate Production

FFP

Production Year 4. 18,000 Btu/hr., 230 volt, single phase 60 Hertz. IAW with

UNIT UNIT PRICE MAX AMOUNT

3003 UNDEFINED Each Full Rate Production

FFP

Production Year 4. 18,000 Btu/hr., 208 Volt, 3-phase, 60 Hertz. IAW with

UNIT UNIT PRICE MAX AMOUNT

3004 UNDEFINED Each Full Rate Production

FFP

Production Year 4. 36,000 Btu/hr., 208 Volt, single Phase, 60 Hertz. IAW with

UNIT UNIT PRICE MAX AMOUNT

4001 UNDEFINED Each Full Rate Production

FFP

Production Year 5. 9,000 Btu/hr., 115 volt, single phase, 50/60 Hertz. IAW with

UNIT UNIT PRICE MAX AMOUNT

4002 UNDEFINED Each Full Rate Production

FFP

Production Year 5. 18,000 Btu/hr., 230 volt, single phase 60 Hertz. IAW with

UNIT UNIT PRICE MAX AMOUNT

4003 UNDEFINED Each Full Rate Production

FFP

Production Year 5. 18,000 Btu/hr., 208 Volt, 3-phase, 60 Hertz. IAW with

UNIT UNIT PRICE MAX AMOUNT

4004 UNDEFINED Each Full Rate Production

FFP

Production Year 5. 36,000 Btu/hr., 208 Volt, single Phase, 60 Hertz. IAW with

B.2 ADDITIONAL PRICING

B.2.1. Contractor Support Pricing (CLINS 0010, 0011 and 0029)

Labor Categories

Proposed Fully Burdened

Hourly Rates Program Manager $

Senior Engineer $ Engineer $

Manufacturing Engineer $

Quality Control Manager $

Trainer $

Technician $ Administrative

Support $

B.2.2. IECU Production Step-Ladder Pricing CLIN 0005 (Production Year 1)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 0006 (Production Year 1)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 0007 (Production Year 1)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 0008 (Production Year 1)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 1001 (Production Year 2)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 1002 (Production Year 2)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 1003 (Production Year 2)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 1004 (Production Year 2)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 2001 (Production Year 3)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 2002 (Production Year 3)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 2003 (Production Year 3)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 2004 (Production Year 3)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 3001 (Production Year 4)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 3002 (Production Year 4)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 3003 (Production Year 4)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 3004 (Production Year 4)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 4001 (Production Year 5)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 4002 (Production Year 5)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 4003 (Production Year 5)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

CLIN 4004 (Production Year 5)

FROM: TO: UNIT PRICE:

1 150

151 300

301 450

451 600

600 +

B.2.3 Spare and Repair Parts Pricing (CLIN 0032) Provide unit price in Attachment 0003 Spares and Repair Parts Pricing

Section C - Descriptions and Specifications

STATEMENT OF WORK

C. DESCRIPTION AND SPECIFICATIONS for 9,000 Btu/hr 115 volt, single phase, 50/60 Hertz (or 9k 115/1/60);

(2) 18k 230/1/60; (3) 18k 208/3/60; and, (4) 36k 208/3/60 Improved Environment Control Units (IECUs)

C.1. GENERAL REQUIREMENTS

C.1.1 Scope: This Statement of Work (SOW) describes the work to be performed by the Contractor in conjunction with the fabrication, test and delivery of the four (4) different IECU variants.

C.1.2. Contract Outline and Sequence of Events: The Contractor shall produce 9/18/36k IECUs which shall meet all performance and physical requirements specified in the Government furnished Technical Data Package (TDP), Purchase Description (PD) and Interface Standard (IS) for IECUs (MIL-STD-1408D). The Contractor shall deliver all required data items in accordance with the Contract Data Requirement Lists (CDRLs) included in the Exhibits.

This effort requires the fabrication of First Article Test (FAT) units in accordance with the Government Furnished TDP, conduct FAT, and production of 9,000, 18,000, and 36,000 Btu/hr IECUs (or 9/18/36k IECUs) variants. The Government will provide four TDPs, representing (1) 9,000 Btu/hr 115 volt, single phase, 50/60 Hertz (or 9k 115/1/60); (2) 18k 230/1/60; (3) 18k 208/3/60; and, (4) 36k 208/3/60 IECUs, in AutoCAD format. The Government is not entertaining any design changes, or duplication of efforts completed during the Engineering and Manufacturing Development (EMD) phase. The Government’s intent is to produce IECUs without changing their already-proven designs such that prior development efforts completed in the Engineering and Manufacturing Development (EMD) phase will entirely, or largely, be retained (i.e., avoid repeat of EMD efforts – through tests and revising logistical documents – wholly or partially). Physical and performance requirements of IECUs are specified in the TDP, Attachment 1, PD, Attachment 2, and IS, Attachment 3. All IECUs specified in this SOW are “Horizontal Compact” variants.

C.1.2.1. For the purposes of this contract, the effort is structured in two distinct phases. The first phase will be for Low Rate Initial Production (LRIP) which includes logistics data documentation, FAT, and the manufacture of low rate initial production units. The second phase will be for Full Rate Production (FRP) which includes full rate production units and production testing. These two contract phases are divided in this SOW in Sections C.2 and C.3 respectively. The terms “ECU,” “IECU,” and “air conditioner” are used interchangeably in this document.

C.1.3. Contractor Responsibilities: The Contractor shall furnish all personnel, labor, engineering, services, materials, supplies, and facilities necessary to manufacture the IECUs and provide all support hardware and software as indicated in this SOW. The work and services to be performed by the Contractor are detailed in this SOW and will be authorized by issuance of delivery orders. The Contractor shall not initiate any work that is not authorized by a delivery order and/or contract modification without written direction by the Contracting Officer.

C.1.4. Program Management: The Contractor shall designate an individual as the Contractor’s Program Manager (PM). The PM shall serve as the primary Point of Contact (POC) between the Government and Contractor, and shall be responsible for the coordination of all Contractor activities related to the contract. The PM shall have the authority to commit the Contractor to courses of action relating to schedule and performance and accept direction from the Government Contracting Officer. The PM shall be responsible for coordinating all meetings between the Government and the Contractor. The PM shall be responsible for bringing to the Contracting Officer’s attention any conflicts in the Contractor’s interpretation of the contract requirements (first by telephone and followed in writing) or problems that could adversely affect the Contractor’s ability to meet the stated quality, cost, or production/delivery schedule.

C.1.5. Schedule: All “days” specified in the contract are calendar days which includes Saturdays, Sundays, and holidays. For CDRLs, if an item is due on any weekend day or holiday, the responsible party (both contractor and Government) must still complete the item by the due date; he/she must pre-plan for the non-working days and schedule his/her efforts accordingly.

C.1.6. Integrated Master Program Schedule: The Contractor shall baseline the program schedule in accordance with (IAW) CDRL A001, Integrated Master Schedule (IMS). The schedule shall depict the milestones necessary for production and delivery of the LRIP and FRP units and applicable Logistics Data Deliverables. All updated information from the previous submission shall be differentiated by using a different-color font.

C.1.7. Communication: Each CDRL will indicate the preferred method of communication between Government and Contractor personnel based on the individual requirements of the product deliverables. The Contractor shall designate its single point of contact within seven days of the contract award. For contract discussions, phone communication is allowed on exceptional cases but e-mail is encouraged. For product deliverables transmitted via e-mail, documents should not exceed 20 megabytes. For larger documents, a mutually convenient site (e.g., AKO website within the Army, or, the Contractor’s website) should be used for timely exchange, rather than using traditional hard-copy mails.

C.2. LOW RATE INITIAL PRODUCTION (LRIP) PHASE

C.2.1. First Article Test (FAT) Units: The Contractor shall fabricate eight (8) each of all four (4) IECU variants (CLINs 0001, 0002, 0003, 0004) – called FAT units – IAW the Government furnished TDPs and conduct FAT for all four (4) variants. The FAT units shall be completely representative of low rate initial production units including, but not limited to, manufacturing processes and quality assurance processes. Production of FAT units shall include all the non-recurring tasks associated with the initiation of production. Non-recurring tasks to initiate IECU production shall include developing manufacturing processes and instructions; developing quality assurance processes and documents; establishing suppliers; set up of equipment, tools, and fixtures; qualification of refrigerant handlers; personnel training; and all other tasks required to establish a production line that delivers fully compliant systems. The Contractor shall prepare a Safety Assessment Report (SAR) for each variant IAW CDRL A025. The Contractor shall use recognized industry standards for calibration processes and design of automated process control equipment. The Contractor may be requested to brief quality assurance during In-Process Reviews (IPRs). Changes to the FAT units resulting from material deficiencies or inadequate design shall be incorporated into the design through the Engineering Change Proposal (ECP) process to include updating the FAT units. The following sections further describe the work to be completed during the LRIP phase.

C.2.2. First Article Test (FAT) Plan: The Contractor shall develop and provide a FAT Plan in accordance with CDRL A004. The FAT Plan shall incorporate the required testing identified in Section C.2.3.2., system description, test objectives, test witnesses, test criteria, test procedures, test equipment, test photos, pass/fail criteria, planned technical analysis, data to be processed, raw data to be collected, and signatures. The Contractor shall be responsible for coordinating and scheduling all FAT required by utilizing the appropriate facilities, equipment, and procedures. The FAT Plan shall include a comprehensive FAT schedule that outlines the location, dates, duration, and identifies all testing resources required. Every requirement/verification outlined in the performance Purchase Description (PD) shall be addressed completely.

C.2.3. First Article Testing (FAT): The Contractor shall be responsible for all actions necessary to complete the FATs (CLIN 0030) including transportation of equipment and test items to and from test sites. The Contractor shall administer and perform a FAT IAW the PD and the IS. FAT is designed to verify the conformance of IECU FAT Units to this SOW, PD, and IS prior to beginning the build of LRIP and FRP units.

C.2.3.1. The Contractor may utilize FAT units as needed to complete all testing and verification within the required schedule. The Contractor shall be responsible for coordinating and scheduling all testing and for the utilization of the appropriate facilities, equipment, personnel, and procedures. The Contractor may use Government test facilities, on a non-interference basis, for performance of some or all of the required First Article Tests. If utilized, the Contractor shall provide reimbursement directly to the Government testing activity (e.g., Aberdeen Test Center) for all direct and indirect costs incurred related to the test conduct. Throughout FAT, the Government requires immediate and electronic access to test related information, including the test plans, test schedule, test results, and each Test Incident Report (TIR) or failure analysis (CDRL A003). The Government has the right to attend any portion or all of the FAT. The Contractor, at no additional cost to the Government, shall correct all issues to include non-conformances or deviations from the TDP that are identified as a result of the conduct of FAT. The Contractor shall report the FAT results, analyze any failures, repair any damage, provide corrective action for failures, submit

ECPs as part of the configuration control as required, and retain one FAT unit of each variant as manufacturing samples during execution of IECU production. The Contractor shall restore the First Article unit to original condition plus correct non-conformances identified in testing, and deliver these units last on the contract, unless otherwise directed by the Government. Prior to final delivery of the FAT units, the contractor shall incorporate any and all approved Engineering Changes to the units.

C.2.3.2. First Article Testing. The list in Table 1 is a summary of specific tests during FAT that are required and referenced in the PD. The contractor is responsible for completing all the First Article Tests IAW the test paragraphs in the PD. The FAT units shall be allocated based on Table 2.

TABLE 1: First Article Tests

FAT Tests Test Paragraphs

Requirement Paragraphs

X Examination 4.2

3.1, 3.3.6, 3.5.4, 3.5.5, 3.5.6, 3.5.7, 3.11.1, 3.11.3, 3.11.4, 3.11.5, 3.11.6, 3.12, 3.13, 3.14, 3.15, 3.16, 3.17, 3.18

X Cooling Capacity 4.3.3.1 3.3.1

X High Temperature Operation 4.3.3.3.1 3.3.3.1, 3.3.5.1, 3.3.5.3

X Heating Capacity 4.3.3.4.1 3.3.4.1, 3.3.5.1

X Inrush Current 4.3.3.5 3.3.5.2

X Inclined Operation 4.3.3.6 3.3.6

X Controls 4.3.4 3.4

X Refrigerant System Pressure 4.3.5 3.5.3

X Vibration 4.3.6 3.6

X EMI 4.3.8.a.1 3.8.1

X Evaporator Compartment Air Leakage 4.3.11 3.11.2

TABLE 2: Test Layout for First Article Units

Test PD Test Article Units

1 2 3 4 5 6 7 8

Examination 4.2 X X X X X X X X

Controls 4.3.4 X X X X X X X X

Refrigerant System Pressure 4.3.5 X X X X X X X X

Inrush Current 4.3.3.5 X

Cooling Capacity 4.3.3.1 X

Heating Capacity 4.3.3.4.1 X

Evaporator Compartment Air Leakage 4.3.11 X

High Temperature Operation 4.3.3.3.1 X

Inclined Operation 4.3.3.6 X

EMI 4.3.8.a.1 X

Vibration 4.3.6 X

C.2.3.3. FAT Report: The Contractor is required to develop and submit a comprehensive FAT Report for all of the tests that were conducted during the FAT in accordance with CDRL A005. The Contractor shall delivery the SAR

IAW CDRL A025.

C.2.4. Physical Configuration Audit: The Contractor shall conduct a Physical Configuration Audit (PCA) at the contractor’s facility within 90 days after entering the LRIP Phase. A Government team of not more than six personnel will observe the PCA and verify that the IECU hardware and TDP are in agreement. The Contractor shall provide all current drawings, configuration documents, and other resources required for the Government team’s review IAW CDRL A006. The Contractor shall have at sufficient quantities of product drawings, documents and resources and shall be available to allow each member of the Government team to work independently or simultaneously in the observation of the PCA.

C.2.4.1. The Contractor shall provide appropriate personnel from each engineering, quality, test, and manufacturing department to discuss specific issues as requested throughout the PCA.

C.2.4.2. The Contractor shall provide adequate space, desks, and tables for a minimum of six people to perform the document review.

C.2.4.3. The Contractor shall provide one each IECU variant along with tools and inspection equipment for the

PCA.

C.2.5. LRIP Production Units: Production other than FAT will not commence until the Government has determined that the contractor has successfully built and delivered FAT units. The Contractor shall fabricate LRIP IECU production units as specified in Section B and conform to the TDPs.

C.2.5.1. The Contractor shall delivery each system in a weather proof wood crate IAW MIL-C-104.

C.2.5.1.1. The Crate shall allow for the stacking four completed systems high without compression damage.

C.2.5.1.2. The Crate shall be forklift accessible on all sides.

C.2.5.1.3. The Crate shall be marked IAW MIL-STD-129.

C.2.6. LRIP Production Status Reports: The Contractor shall provide Production Status Reports IAW CDRL A013, Production Status Reports for all LRIP units.

C.3. FULL RATE PRODUCTION PHASE

C.3.1. Full Rate Production (FRP) Phase: The contractor shall manufacture production units IAW the IECU TDP and as specified in Section B. The following sections further describe the work to be completed in the FRP Phase of this contract if and only if IECU units are ordered.

C.3.1.1. Production Test/Inspection Plans and Procedures. The Contractor shall develop and submit a production test plan and procedures for each IECU variant CDRL A014. The plan must include an inspection and test to substantiate product conformance to drawings and contract requirements and to all inspections and tests required by the resultant contract. The test plan and procedures shall describe sample, in-process, and end items tests to be performed as required to ensure quality and performance. Test procedures shall include applicable test reference, required equipment to perform the test, location of the test, step by step instructions for the test, data to be recorded, and pass/fail criteria. The production test plan shall be delivered in accordance with CDRL A014, IS, and PD.

C.3.1.1.1. A FRP test report IAW CDRL A015 detailing how the FRP test plan was executed and any:

discrepancies, changes to planned process or procedures, planned improvements, and or efficiencies that were identified.

C.3.1.2. The Contractor shall pack one hard copy Technical Manual (TM) and one Compact Disk (CD) of the Electronic Technical Manual (ETM) containing operators and maintenance instructions in a waterproof bag placed inside the crate with each end item delivered under this contract. The TM will be a Government Furnished Item

(GFI).

C.3.1.3. The Contractor shall delivery each IECU individual in a weather proof wood crate IAW CDRL A007.

C.3.1.3.1. The Crate shall allow stacking of four completed systems high without compression damage.

C.3.1.3.2. The Crate shall be forklift accessible on all sides.

C.3.1.3.3. The Crate shall be marked IAW MIL-STD-129.

C.3.2. Production Status Reports: The Contractor shall provide Production Status Reports in accordance with CDRL A016, Production Status Reports for all FRP units.

C.3.3. Full-Rate-Production (FRP) Test: The Contractor shall conduct Quality Conformance (QC) tests shown in Table 3. All production units shall be subjected to these QC tests. All test results shall be made available upon request by the Procurement Contracting Officer (PCO), or Government technical representative.

Table 3: Quality Conformance Tests

FRP Tests Purchase Description

Requirement Paragraphs

X Examination 4.2

3.1, 3.3.6, 3.5.4, 3.5.5, 3.5.6, 3.5.7, 3.11.1, 3.11.3, 3.11.4, 3.11.5, 3.11.6, 3.12, 3.13, 3.14, 3.15, 3.16, 3.17, 3.18

X Controls 4.3.4 3.4

X Refrigerant System Pressure 4.3.5 3.5.3

X Run-in 4.3.15 3.3

C.3.3.1. Test failures shall be reported, via e-mail, to the Government IAW CDRL A003.Technical Report – Study/Services, Failure Analysis.

C.3.3.2. The Government reserves the right to randomly select units from the production line and independently test these units for conformance to the requirements of the TDP, PD, and IS.

C.3.4. Configuration Management: The TDP is the Configuration Baseline (CB) for each variant.

C.3.4.1. The Contractor shall establish and maintain an in-house documented procedure which assures all of the Contractor’s activities have access to and use of the contractually specified CB, approved changes and departures, and affectivity data. The Contractor shall be able to determine when and what changes were implemented to which units. The documented procedures and the data in use shall be available for Government review and use. The Contractor shall implement and maintain an internal configuration management program for the IECU throughout the life of the contract. EIA649, ‘National Consensus Standard for Configuration Management’, may be used as a guide for the Contractor’s configuration management program. Copies of this document may be purchased at http://www.sae.org/.

C.3.4.2. The Contractor shall make no changes or departures from the CB except for changes or departures which are submitted IAW CDRL A002, Configuration Control Documents (CCDs), and are approved by the Government and which are incorporated into the contract by the PCO. Except as described in this paragraph, all configuration changes shall be documented by the Contractor and be approved in writing by the Government prior to incorporation. In exigent circumstances, to allow for continuation of ongoing testing, the Government may at its discretion provisionally approve on a temporary basis a CB change. In this event, the Contractor shall within seven working days of any provisional CB change submit a corresponding CCD. The Government at its own discretion may revoke any provisional CB changes approved in this manner.

C.3.4.3. The Contractor shall prepare an ECP that includes both the engineering change and the supporting documentation by which the change is described and proposed. An ECP describes changes to the Configuration Item (CI) and Integrated Logistics Support (ILS) documentation that are affected by the proposed change. The ECP shall contain the information listed in sections C.3.4.3.1. through C.3.4.3.15.

C.3.4.3.1. Date Prepared C.3.4.3.2. ECP Number C.3.4.3.3. Justification and Priority Code C.3.4.3.4. System Designation (i.e. Cage Code, nomenclature, model, P/N) C.3.4.3.5. Name of Part (or Lowest Assembly) Affected C.3.4.3.6. Baselines Affected C.3.4.3.7. Title of Change C.3.4.3.8. Description of Change C.3.4.3.9. Need for Change C.3.4.3.10. Effect on Interfaces (i.e. Integrated Logistics Support (ILS), Interchangeability and Interoperability) C.3.4.3.11. Total Costs/Savings C.3.4.3.12. Retrofit Information (if applicable) C.3.4.3.13. Technical data describing the change to include any changes or additions to the drawings and Engineering Data for Provisioning (EDFP).

C.3.4.3.14. Applicable testing performed and evaluation of the test results.

C.3.4.3.15. Applicable updates to TM and training

C.3.4.4. The Contractor shall submit one Notice of Revision (NOR) for each change that must be made to technical documentation following the approval of an ECP.

C.3.4.5. The Contractor shall submit Specification Change Notice (SCN) to delineate the exact change(s) in the IECU PD that will be distributed to users when the ECP is approved.

C.3.4.6. The Contractor shall submit a Request for Deviation (RFD) that describes a requested departure from configuration documentation for a specific number of units or period. The Contractor shall identify the impact of the RFD on performance, operational readiness, and logistics support of the affected CI(s).

C.3.4.7. The Contractor shall submit a Request for Waiver (RFW) that describes a requested departure from configuration documentation for a specific number of units that have already been manufactured. The Contractor shall identify the impact of the RFW on performance, operational readiness, and logistics support of the affected CI(s).

C.3.4.8. The Contractor shall submit a plan IAW CDRL A017 detailing how logistic data products will be managed if the change is approved.

C.3.5. CDD Decision Notification: The PCO, or their designee, will notify the Contractor via e-mail the final decision of CDDs within three days of the decision. The purpose of this notification is to alleviate any undue delay in contract progress that may be caused by a processing time for contract modification/amendment.

C.3.6. Contract Modification: The PCO will follow-up the above e-mail notification by a contract modification/amendment.

C.3.7. Item Unique Identification (IUID) Standards and Requirements (For additional information see Section D.3)

C.3.7.1. Requirements for Item Unique Identification (IUID). The contractor shall mark all contract deliverables in accordance with (IAW) CDRL A009, IUID Marking Diagram/Instructions, and the following guidelines. These requirements apply to all piece parts, subassemblies, assemblies, modules, units, groups, sets, systems, etc., that comprise the equipment on order.

C.3.7.1.1. IUID Marking. The contractor shall provide IUID, or DOD recognized unique identification equivalent, for all items delivered with an acquisition cost of $5,000 or more. In addition, the contractor shall apply IUID markings to all other items the government has identified in this contract as requiring IUID markings. IUID markings shall be IAW MIL-STD-130.

C.3.7.1.1.1. Commercial Markings. All other items shall have commercial markings.

C.3.7.1.1.2. Permanency and Legibility. The IUID marking and identification plates, tags, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, or groups shall be as permanent as the normal life expectancy of the item and be capable of withstanding the environmental test and cleaning procedures specified for the item. Legibility shall be as required for ready readability per MIL-STD-130.

C.3.7.1.1.3. Deleterious Effect. Marking of items shall be accomplished in a manner that will not adversely affect the life and utility of the item. Marking materials creating hazardous conditions shall not be used.

C.3.7.1.2. IUID Coding. IUID markings and readability requirements shall comply with MIL-STD-130.

C.3.7.1.2.1. The human readable characters and the machine readable IUID symbology will be marked on the hardware. If there is not enough space to include both, the machine readable IUID shall take precedence.

C.3.7.1.2.2. If the technical data has not specified the marking location, markings shall be located such that they are visible during item use, provided that sufficient space is available.

C.3.7.1.2.3. Serial Numbers. The contractor shall meet the requirements of MIL-STD-130 to establish the IUID.

The contractor shall insure that the IUID is unique for that item from all other items.

C.3.7.1.2.3.1. The contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or other Government representative at any time during the life of this contract.

C.3.7.1.3. Correction of Noncompliant Equipment and Technical Data. If this contract contains configuration control requirements, the contractor shall initiate the appropriate configuration control document to correct all affected drawings/specifications which conflict with or omit the marking requirements stipulated above.

C.3.8. Shipping: The contractor shall ship CLIN 0031 IECUs as required for LRIP and FRP phases of this effort.

Shipping of complete systems to storage locations, fielding sites, and other locations as required. The contractor shall submit proposed shipping cost per shipment to the government for approval prior to shipping. The total evaluated price (TEP) will not include shipping CLIN 0031.

C.3.9. Contractor Support of Fielding: The contactor shall provide support at their expense to correct issues due to manufacturing or shortages with each IECU variant at the time of fielding. Support will be in the form of providing replacement components, and at the Governments discretion, installing those components, for items found defective or missing during government deprocessing.

C.3.10. Initial Spares Parts List: The Contractor shall deliver CLIN 0032 to the Government a kit of initial spares for all items on the Spare Parts List (See Attachment 0003). The quantity of each required spare part shall be sufficient to maintain 100 of each variant of the IECU for two years. All items shall be delivered IAW with IECU TDP and

MIL-STD-129.

C.4. PACKAGING AND WARRANTY

C.4.1. Preservation, Packing, and Marking: Shipment shall be in accordance with Section “D” of the Contract.

C.4.2. Packaging Developmental Data Report: The Contractor shall prepare Packaging Developmental Data Report (PDDR) as defined in this SOW and CDRL A008, Packaging Development Data Report. The PDDR shall be performed to the level of a LSA-026. The required Data Product Dictionary (DPD) elements are defined in Appendix B of MIL-PRF-49506. The Contractor shall update the Contractor’s logistics data base to reflect necessary changes in support requirements identified during system or System Support Package (SSP) testing, logistics reviews, and Contractor’s validation of logistics data base documentation.

C.4.3. Items requiring Packaging Developmental Data: For the end item, all components of the end item, all support items (i.e., spare and repair parts), special test equipment and Government approved Engineering Change Proposal (ECP) changes, the Government requires the Contractor to screen the Provisioning Source, Maintenance, and Recoverability (SMR) code and provide packaging development data for those items that are unique to this system which have a Source Code of “P.” A PDDR shall be provided in accordance with CDRL A008, Packaging Developmental Data Report.

C.4.4. Warranty C.4.4.1. The Contractor shall provide a commercial type warranty covering workmanship and materials for all items furnished IAW this contract or any modification thereof. The warranty shall be for a minimum of one year in duration. The warranty period begins upon Government acceptance.

C.4.4.2. The Contractor shall update Warranty Technical Instructions as necessary. Warranty Technical Instructions shall describe the actions to be taken by the user in order to exercise the warranty and obtain repaired/replaced equipment. These Warranty Technical Instructions shall be incorporated into the ETMs. A separate Warranty Technical Bulletin (WTB) is not required.

C.4.4.3. Upon arrival at the Contractor’s repair facility, both Contractor and Government representatives will determine if the failed item is covered under the warranty. The Contractor shall meet a 30 day turnaround time for evaluation and repair. This time shall begin from the date of receipt by the Contractor and include shipment from the contractor’s facility to the final destination. The Contractor shall be responsible for CONUS transportation costs from the customer to the Contractor’s facility and return to the customer.

C.4.4.4. Warranty markings shall be applied to end item, intermediate and shipping containers. The markings shall be in a conspicuous location to give notice that the item(s) are subject to warranty coverage. These markings shall indicate the time period or condition of the warranty (e.g., days/months, hours of operation, etc.).

C.5. Training C.5.1. Training Material and Aids: The Contractor shall be responsible for developing and updating training material, if needed, hosting training conferences, and providing Instructor and Key Personnel Training (IKPT) for selected Government personnel, Training Aids Devices Simulation and Simulators (TADSS) training IAW CDRLs A018, A019, A020, A021. The Contractor shall provide training of selected personnel on the installation and use of the TADSS devices. The Point of Contact for each site shall be provided by the Government. The training must effectively train the trainers to install and operate the TADSS devices. The training will include demonstration of installed TADSS devices.

C.5.2.Training Conferences: The Contractor shall conduct Training Conference (TC) in preparation for the IKPT.

The Contractor and Government by mutual agreement shall establish the dates, location, and agenda of this TC. The TC shall include, in addition to the review of 100% of all the training materials, an inspection of the designated training facilities. The Contractor shall convene the TC at the Contractor’s facility.

C.5.2.1. Either the Government or the Contractor may call additional TCs on an as needed basis. The Contractor shall coordinate scheduling of additional TCs with the COR.

C.5.2.2. The Contractor shall conduct Operator and Maintainer courses for Instructor and Key Personnel Training (IKPT) as required IAW CDRL A024. Courses shall be taught IAW with training material developed in C.5.1.. The Government will coordinate with the Contractor on date, time, and location for each training event.

C.5.2.3. Training shall be conducted at the Contractor’s facilities or as directed by the Government. Government representatives will review and inspect training materials, facilities, classes and schedules.

C.5.2.4. The Contractor shall furnish all supplies, tools, and equipment necessary to conduct the training courses.

The exception will be those items provided to the Contractor as Government Furnished Equipment (GFE). GFE will include (if requested by the Contractor) the standard tool kit, and a refrigerant recovery machine.

C.5.2.5. The Contractor shall service and maintain the IECUs during the training course presentation and provide refurbish the equipment as necessary to return it to a like new serviceable condition upon completion of the training courses. Such refurbishment, if required, shall be accomplished by the Contractor at no additional expense to the Government.

C.5.2.6. The Contractor shall establish detailed procedures to assure the safety of all individuals concerned when conducting training that would involve hazardous operations. Safety procedures will include relevant notices, cautions, notes and warnings extracted from preliminary publications, handbooks and any other such information sources pertinent to operation and maintenance of the equipment. All such information will be covered in detail in the appropriate lesson plan and trainee guide.

C.5.2.7. The Government reserves the right to record any or all training photographically or electronically, for instructional use of review. Such materiel becomes the sole property of the Government and no additional copyright of individual release will be required.

C.5.2.8. Corrosion Prevention and Control will be stressed in all instructional materiel developed. Instruction will provide personnel with knowledge of the cause of corrosion, ability to detect and recognize corrosion, and expertise to select preventive measures.

C.5.2.9. Each instructor selected by the contractor to teach the courses shall have a complete knowledge of components. In addition, each instructor shall provide satisfactory documentation and demonstrate proof of his ability to impart information to others in a classroom situation.

C.5.3. Interactive Multimedia Instruction (IMI) DVD: The contractor shall develop and produce operator and maintainer Training videos on DVD and Interactive Multimedia Instruction (IMI) on DVD for each variant of the IECU in accordance with CDRLs 018, 019 and 020.

C.5.3.1. The Contractor shall deliver operator and maintainer IMI DVDs to the government IAW CDRLs A022 and A023.

C.6. MEETINGS AND REVIEWS

C.6.1. Post Award Conference: The Contractor shall coordinate, schedule, and conduct a Post Award Conference with the Government within 21 calendar days of Contract award. The purpose of the Conference shall be discussion of project orientation, transfer of background information, to provide a mutual understanding of the technical requirements/contractual requirements and the Quality Assurance provisions of the Contract. The Government can address any questions or issues with regards to technical matters. The Contractor shall describe to the Government the management of all aspects of the program. The Contractor shall ensure that all personnel and subcontractors that are required for an adequate discussion of the contract effort are in attendance. Scheduling of the Post Award Conference shall not change the delivery schedule of the contract. The Contractor shall be prepared to:

C.6.1.1. Conduct a review of the system production requirements to ensure that they have been completely and properly identified and that there is a mutual understanding of the system production requirements between the Government and the…