About this file

This is a Performance Work Statement (PWS) for preventative maintenance and repair services on a Stratasys J850 3-Dimensional (3D) printer owned and operated by the Army Research Laboratory's Polymer Additive Manufacturing facility at Aberdeen Proving Ground, Maryland.

The contractor shall provide technical support, replacement parts, preventative maintenance kits, unlimited phone support, and software/firmware updates over a base 12-month period plus four optional 12-month periods for a total of five years. Preventative maintenance service visits are required once every 12 months or 3,500 print hours, whichever comes first. The contractor must supply all qualified trained personnel, tools, and parts required to accomplish the task and follow all installation and facility access procedures. Maintenance reports detailing all work accomplished must be delivered within five business days after each site visit. The period of performance is 60 months total, structured as one base Contract Line-Item Number (CLIN) with a one-year PoP and four optional one-year CLINs. Performance will occur at the U.S. Army Research Laboratory, Aberdeen Proving Ground, Maryland 21005-5069. The contractor must comply with AT-OPSEC requirements, personal identity verification standards, and adjudication procedures for facility access. The PWS was signed by Contracting Officer Zachary Dowling on November 10, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .