W911QX24R0013 Salient Characteristics.doc
DOC document 99 KB Posted
- Solicitation number
- W911QX24R0013
About this file
This document is a Salient Characteristics Commercial Availability Certification for a federal contract opportunity. The government is seeking to procure quantity four (4) Metal Inert Gas (MIG) Welders, quantity one (1) Tungsten Inert Gas (TIG) Welder, and quantity two (2) Truck Mounted Welders, along with monthly preventative maintenance and repair services. The welders must meet detailed technical specifications, including capabilities, features, accessories, and training requirements. The contractor shall also provide on-site visits for maintenance, repairs, and training within specified timeframes. Delivery is required within two (2) weeks After Receipt of Order (ARO). This sources sought notice is for market research purposes to identify qualified sources, including small businesses, to potentially compete for the future solicitation, W911QX24R0013. Responses are due by 28 March 2024 and should address the extent to which the specifications can be met, business size and socioeconomic status, and relevant past experience.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911QX24R0013 Sources Sought.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salient Characteristics
Commercial Availability Certification:
I have evaluated the commercial marketplace and determined that all of the salient characteristics documented below are available in products/services offered in the commercial marketplace.
Signature (typed name): Charlie Kranz, FCDD-RLA-SA Technical Point of Contact (TPOC)
The Government requires quantity four (4) Metal Inert Gas (MIG) Welders, quantity one (1) Tungsten Inert Gas (TIG) Welder quantity two (2) Truck Mounted Welders, monthly preventative maintenance, and repair services on the machines.
Quantity (qty) four (4) Metal Inert Gas (MIG) Welders in accordance with the following specifications:
· The contractor shall include TransPuls Synergic (TPS) 500i push pull standard.
· Shall have synergic functionality with an available database of 1500 synergic lines to support different materials.
· Shall be Metal Inert Gas (MIG) welders.
· Shall be a fully integrated system.
· Shall include job storage up to 1000 jobs per system.
· Shall include updatable technology for enhanced performance.
· Shall include system tests to a 20,000 hour service life.
· Shall include a maximum welding current of 500 amps (A).
· Shall have a welding current of 500 amps (A) at 40 percent.
· Shall have a welding current of 430 amps (A) at 60 percent.
· Shall have a welding current of 360 amps (A) at 100 percent.
· Shall have an open circuit voltage of 71 volts (v).
· Shall have 50-60 hertz (Hz) frequency.
· Shall have 3x 400 Volt main voltage.
· Shall include a wheeled cart for portability.
· The contractor shall include Metal Inert Gas (MIG) gun with Light Emitting Diode (LED) display.
· The contractor shall include Metal Inert Gas (MIG) Hose Pak 320i Water-cooled Pull Metal Inert Gas (MIG) System /F-style Service connector, SC/Job master/5.8M/ Light Emitting Diode (LED).
· The contractor shall include Metal Inert Gas (MIG) Torch Body 500i Water-cooled Torch Body.
· The contractor shall include Metal Inert Gas (MIG) Torch Water-cooled 500I Push Torch.
· The contractor shall include Pulse Multi Control (PMC) Welding Program.
· The contractor shall include Low Splatter Control (LSC) Welding Program.
· The contractor shall include Option I Special Synergic Line Software.
· The contractor shall have a feeder operator panel.
· The contractor shall have a feeder display cover.
· The contractor shall have a feeder caster wheel assembly.
· The contractor shall have Optional Transport Unit Dual Cylinder Cart.
· The contractor shall include quantity (qty) 500 contact tips size .045 inch
· The contractor shall include quantity (qty) 25 clamping piece size .045 inch red.
· The contractor shall include quantity (qty) 20 feeder rolls .045 inch red.
· The contractor shall include quantity (qty) 125 nozzles standard 3/4 inch size.
· The contractor shall include quantity (qty) 5 splatter guards.
· The contractor shall include quantity (qty) 25 nozzles standard 5/8 inch size.
· The contractor shall include quantity (qty) 25 insulator packs.
· The contractor shall include 3 on-site instructional training days for operation, maintenance, and safety.
· The contractor shall include an initial 6-hour on-site training visit and a training review after 90 days.
· The contractor shall include 4 hour on-site visit to review training and address end user needs at 60 days and 6 months.
· The contractor shall nclude five-year warranty on each welder and all associated parts.
· The contractor shall include monthly principle period of maintenance (PPM) service and periodic monthly maintenance on all four machines; to include labor, tools, and supplies.
· The contractor shall include repair services on all four machines to include labor, tools, supplies and replacement parts as needed.
· The contractor shall include the following parts as needed; lubricants, oils, grease, belts, fuses, switches, lamps, and those items associated with preventative maintenance and standard remedial/emergency repair items.
· The contractor shall include on-site visits for principle period of maintenance (PPM), periodic monthly maintenance, and repair services, located at Aberdeen Proving Ground, MD.
· The contractor shall include on-site visits within 24 hours of notification that remedial and emergency maintenance and repairs is required.
· The unit shall have active error monitoring and 24/7 factory support.
· The contractor shall include freight, rigging and shipping charges.
· The contractor shall include machine installation.
· Delivery to 6375 Johnson Road, building 321, Aberdeen Proving Ground 21005 no later than two (2) weeks After Receipt of Order (ARO).
Quantity (qty) one (1) Tungsten Inert Gas (TIG) Welder in accordance with the following specifications:
· Shall be a Tungsten Inert Gas (TIG) Welder.
· Shall have a display screen.
· Shall have 50-60 hertz (Hz) frequency.
· Shall have 3x 400 Volt main voltage.
· Shall have a + or mins 15 percent voltage tolerance
· Shall have a welding current of 500 amps (A) at 40 percent.
· Shall have a welding current of 430 amps (A) at 60 percent.
· Shall have a welding current of 360 amps (A) at 100 percent.
· Shall be generator compatible.
· Shall be multivoltage from 200-600 volts (V).
· Shall have a maximum welding current of 500 amps (A).
· Shall have an open circuit voltage of 96 volts (V).
· The contractor shall have a power cable.
· The contractor shall have a M4 primary power Plug.
· Shall include a wheeled cart for portability.
· Shall be a fully integrated system.
· Shall include job storage up to 1000 jobs per system.
· Shall include updatable technology for enhanced performance.
· Shall include system tests to a 20,000 hour service life.
· The contractor shall include 3 on-site instructional training days for operation, maintenance, and safety.
· The contractor shall include an initial 6-hour on-site training visit and a training review after 90 days.
· The contractor shall include 4 hour on-site visit to review training and address end user needs at 60 days and 6 months.
· The contractor shall nclude five-year warranty on each welder and all associated parts.
· The contractor shall include monthly principle period of maintenance (PPM) service and periodic monthly maintenance on all four machines; to include labor, tools, and supplies.
· The contractor shall include repair services on all four machines to include labor, tools, supplies and replacement parts as needed.
· The contractor shall include the following parts as needed; lubricants, oils, grease, belts, fuses, switches, lamps, and those items associated with preventative maintenance and standard remedial/emergency repair items.
· The contractor shall include on-site visits for principle period of maintenance (PPM), periodic monthly maintenance, and repair services, located at Aberdeen Proving Ground, MD.
· The contractor shall include on-site visits within 24 hours of notification that remedial and emergency maintenance and repairs is required.
· The unit shall have active error monitoring and 24/7 factory support.
· The contractor shall include freight, rigging and shipping charges.
· The contractor shall include machine installation.
· Delivery to 6375 Johnson Road, building 321, Aberdeen Proving Ground 21005 no later than two (2) weeks After Receipt of Order (ARO).
Quantity (qty) two (2) Truck Mounted Welders in accordance with the following specifications:
· Shall be portable truck mounted units.
· Shall be a fully integrated system.
· Shall include job storage up to 1000 jobs per system.
· Shall be heavy duty models.
· Shall include an industrial rotary air compressor.
· Shall have compressor working pressure of 100 pounds per square inch gauge (psig).
· Shall have an electronic display.
· Shall include system tests to a 20,000 hour service life.
· Shall have amperage of 20 amps to 600 amps.
· Shall have an engine weld speed of 1800 revolutions per minute (RPM).
· Shall have an induction engine block heater with 129 volts and glow plugs.
· Shall have thermal overload protection.
· Shall have a horsepower of 65.7.
· Shall have a welding current of 500 amps (A) at 40 volts and 100 percent.
· Shall have a welding current of 575 amps (A) at 43 volts and 100 percent.
· Shall have a welding current of 600 amps (A) at 44 volts and 60 percent.
· Shall have single phase continuous auxillary power of 12000 watts.
· Shall have single phase peak auxillary power of 15000 watts.
· Shall have three phase continuous auxillary power of 20000 watts.
· Shall have three phase peak auxillary power of 27000 watts.
· Shall have a weld sound rating of 78.9 decibles.
· Shall have constant current (cc) weld output.
· Shall have constant voltage (cv) weld output.
· Shall include updatable technology for enhanced performance.
· Shall have a maximum open circuit voltage of 92 volts of direct current (vdc).
· The contractor shall include wireless interface control and ArcReach.
· The contractor shall include 3 hours on-site instructional training days for operation, maintenance, and safety.
· The contractor shall include on-site oil change, within 60 days of start-up.
· The contractor shall include 4 hour on-site visit for run-in and start up for all new diesel equipment.
· The contractor shall include five-year warranty on each welder and all associated parts.
· The contractor shall include monthly principle period of maintenance (PPM) service and periodic monthly maintenance on the two machines; to include labor, tools, and supplies.
· The contractor shall include repair services on the two machines to include labor, tools, supplies and replacement parts as needed.
· The contractor shall include the following parts as needed; lubricants, oils, grease, belts, fuses, switches, lamps, and those items associated with preventative maintenance and standard remedial/emergency repair items.
· The contractor shall include on-site visits for principle period of maintenance (PPM), periodic monthly maintenance, and repair services, located at Aberdeen Proving Ground, MD.
· The contractor shall include on-site visits within 24 hours of notification that remedial and emergency maintenance and repairs is required.
· The unit shall have active error monitoring and 24/7 factory support.
· The contractor shall include freight, rigging and shipping charges.
· The contractor shall include machine installation and assembly.
· The contractor shall include an onsite run-in method procedure test during installation (verified and accepted on site by COR) following correct procedures.
· Delivery to 6375 Johnson Road, building 321, Aberdeen Proving Ground 21005 no later than two (2) weeks After Receipt of Order (ARO).
Contracting Officer:
Template last updated 07/28/2016
File details come from the government source that posted it. Updated .