Attachment 2 - ARL TF 20240801.pdf

PDF 199 KB Posted

Attached to
Sources Sought for the fabrication of quantity 100 aluminum 120-millimeter (mm) sabots.
Solicitation number
W911QX-24-Q-0301
Issued by

About this file

This document is a Sources Sought notice for the fabrication of 100 aluminum 120-millimeter sabots. The Government requires the fabrication of the sabots in accordance with the provided specifications, including the use of 7075-T6 aluminum in either a three or four-petal configuration. The Contractor shall deliver the first lot of 20 sabots within 60 days of contract award, with the Government performing an inspection prior to delivery. The remaining 80 sabots shall be delivered within 120 days of contract award, with multiple lot deliveries acceptable. An inspection report must be included with each delivery, and shipping to Aberdeen Proving Ground, MD is required. The Government will provide solidworks files or neutral format files for the sabot design, as well as the penetrators for inspection.

View the file

Other files

File Type Posted
Attachment 1 - ARL TF 20240701.pdf PDF
Drawing - 28084184_a.pdf PDF
Sources Sought.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINISH

MATERIAL

INTERPRET GEOMETRIC

Assembly

UNLESS OTHERWISE SPECIFIED:

ARL-TF-20240801

DO NOT SCALE DRAWING SCALE: 1:2 WEIGHT: SHEET 1 OF 1

DWG. NO.

B

SIZE

TITLE:

NAME DATE

COMMENTS:

Q.A.

MFG APPR.

ENG APPR.

CHECKED

REV

DRAWN

B

B

A

A

NEXT ASSY

CUI

Sabot / Penetrator

TOLERANCING PER:

APPLICATION

USED ON

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL

ANGULAR: MACH BEND

TWO PLACE DECIMAL

THREE PLACE DECIMAL

CUI

Part 28084184 Part ARL-TF-20240701

Note 1 Note 1

A Note 1

B

Notes:

1. With hose clamps tightened in positions A and B, for the region indicated, the maxiumum gap between any two sabot petals is 0.005".

2. With hose clamps tightened in positions A and B, the penetrator must be free to spin. Maximum axial displacement of the penetrator is 0.010".

Controlled by: US Army Controlled by: DEVCOM ARL CUI Category: CTI Distribution statement: D: DOD and DOD contractors POC: Brett Sorensen

File details come from the government source that posted it. Updated .