DD1423 - W911QX24Q0192 DRAFT_Redacted.pdf

PDF 462 KB Posted

Attached to
SMALL BUSINESS SET-ASIDE FOR Building 4503 Furniture Upgrades and installation
Solicitation number
W911QX-24-Q-0192
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) that outlines the data items required for a federal contract opportunity related to furniture upgrades at Building 4503 at Aberdeen Proving Ground.

The key details are:

  • The contract opportunity number is W911QX-24-Q-0192, and it is a small business set-aside solicitation for furniture upgrades and installation.
  • The CDRLs specify requirements for conceptual design drawings, as-built drawings, an OPSEC SOP/Plan, a Quality Control Plan, an Accident Prevention Plan, Activity Hazard Analyses, and a Schedule of Construction.
  • Deliverables are due at various timeframes, ranging from 30 days prior to work starting to 30 days after contract completion.
  • Distribution of deliverables is limited to U.S. Government agencies due to operations security.
  • The contract is for CLIN 0004, which is the data requirements for the overall contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template last updated 10/21/2021

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: Engineering Data

D. SYSTEM/ITEM

B4503 Furniture Upgrades, APG

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Conceptual Design Drawings

3. SUBTITLE

Shop Drawings and Submittals

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81001C

5. CONTRACT REFERENCE

TBD

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

XX

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

ASREQ

12. DATE OF FIRST

SUBMISSION See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft Final

Reg Repro

16. REMARKS

BLK 4: Each submission shall be delivered electronically in a media selected by the government ROM and DVD-Rat time of delivery. Media types which can be accepted include File Transfer Protocol (FTP), CD-ROM and DVD-ROM.

BLK 9: Distribution is limited to US Government Agencies due to operations security.

BLK 12: Submission is due 30 calendar days prior to work is scheduled to begin or the materials are scheduled to be fabricated.

BLK 14: Reproducible copies shall be electronic transmission.

The government shall have 30 calendar days for review and acceptance/rejection of initial submission and 15 calendar days for review and acceptance/rejection of subsequent submissions.

All submittals and shop drawings shall be sent to:

TBD

TBD 0 1 0

15. TOTAL

G. PREPARED BY

H. DATE

4/25/2024

I. APPROVED BY

J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: Engineering Data

D. SYSTEM/ITEM

B4503 Furniture Upgrades, APG

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Conceptual Design Drawings

3. SUBTITLE

As-built Drawings

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81001C

5. CONTRACT REFERENCE

TBD

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

XX

FINAL

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft Final

Reg Repro

16. REMARKS

BLK 4: Each submission shall be delivered electronically in a media selected by the government at time of delivery. Media types which can be accepted include: File Transfer Protocol (FTP), CDROM and DVD-ROM.

BLK 9: Distribution is limited to US Government Agencies due to operations security.

BLK 12: Submission is due no later than 30 calendar days from the date of contract completion.

BLK 14: Reproducible copies shall be electronic transmission.

All as-built drawings shall be sent to:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: Engineering Data

D. SYSTEM/ITEM

B4503 Furniture Upgrades, APG

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Training Data Products

3. SUBTITLE

OPSEC SOP/Plan

4. AUTHORITY (Data Acquisition Document No.)

MIL-PRF-29612B

5. CONTRACT REFERENCE

TBD

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

XX

ONE/R

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft Final

Reg Repro

16. REMARKS

BLK 4: Each submission shall be delivered electronically in a media selected by the government at time of delivery. Media types which can be accepted include: File Transfer Protocol (FTP), CD-ROM and DVD-ROM.

BLK 9: Distribution is limited to US Government Agencies due to operations security.

BLK 12: Submission of initial SOP/Plan is due no later than 90 calendar days after contract award; submission of final SOP/Plan is due no later than 120 calendar days after contract award.

BLK 14: Reproducible copies shall be electronic transmission.

The government shall have 15 calendar days for review and acceptance/rejection of initial submission and 15 days for review and acceptance/rejection of subsequent submissions.

All documentation shall be sent to:

TBD 1 0 1

15. TOTAL 1 0 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: Engineering Data

D. SYSTEM/ITEM

B4503 Furniture Upgrades, APG

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Guidelines for Quality Plans – Quality Management

3. SUBTITLE

Quality Control Plan

4. AUTHORITY (Data Acquisition Document No.)

ISO10005

5. CONTRACT REFERENCE

TBD

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

XX

ONE/R

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft Final

Reg Repro

16. REMARKS

BLK 4: Each submission shall be delivered electronically in a media selected by the government at time of delivery. Media types which can be accepted include: File Transfer Protocol (FTP), CD- ROM and DVD-ROM.

BLK 9: Distribution is limited to US Government Agencies due to operations security.

BLK 12: Submission of initial plan is due no later than 30 calendar days after notice to proceed; submission of revised plan is due no later than 15 calendar days after receipt of government comments.

BLK 14: Reproducible copies shall be electronic transmission.

The government shall have 15 calendar days for review and acceptance/rejection of initial submission and 15 days for review and acceptance/rejection of subsequent submissions.

All documentation shall be sent to:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: Engineering Data

D. SYSTEM/ITEM

B4503 Furniture Upgrades, APG

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Contractor’s Safety Plan

3. SUBTITLE

Accident Prevention Plan

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-82080

5. CONTRACT REFERENCE

TBD

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

XX

ONE/R

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft Final

Reg Repro

16. REMARKS

BLK 4: Each submission shall be delivered electronically in a media selected by the government at time of delivery. Media types which can be accepted include: File Transfer Protocol (FTP), CD-ROM and DVD-ROM.

BLK 9: Distribution is limited to US Government Agencies due to operations security.

BLK 12: Submission of initial plan is due no later than 30 calendar days after notice to proceed; submission of revised plan is due no later than 15 calendar days after receipt of government comments.

BLK 14: Reproducible copies shall be electronic transmission.

The government shall have 15 days for review and acceptance/rejection of initial submission and 15 days for review and acceptance/rejection of subsequent submissions.

All documentation shall be sent to:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: Engineering Data

D. SYSTEM/ITEM

B4503 Furniture Upgrades, APG

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

System Safety Hazard Analysis Report

3. SUBTITLE

Activity Hazard Analysis

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80101

5. CONTRACT REFERENCE

TBD

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

XX

ASREQ

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft Final

Reg Repro

16. REMARKS

BLK 4: Each submission shall be delivered electronically in a media selected by the government ROM and DVD-Rat time of delivery. Media types which can be accepted include: File Transfer Protocol (FTP), CD-ROM and DVD-ROM.

BLK 9: Distribution is limited to US Government Agencies due to operations security.

BLK 12: Submission is due 15 calendar days prior to the start of each activity task or definable feature of work.

BLK 14: Reproducible copies shall be electronic transmission.

All documentation shall be sent to:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0004

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: Engineering Data

D. SYSTEM/ITEM

B4503 Furniture Upgrades, APG

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Key Events Schedule

3. SUBTITLE

Schedule of Construction

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81791

5. CONTRACT REFERENCE

TBD

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

XX

ONE/R

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft Final

Reg Repro

16. REMARKS

BLK 4: Each submission shall be delivered electronically in a media selected by the government at time of delivery. Media types which can be accepted include: File Transfer Protocol (FTP), CD-ROM and DVD-ROM.

BLK 9: Distribution is limited to US Government Agencies due to operations security.

BLK 12: Initial submission is due no later than 15 calendar days after contract award;

revised submission is due no later than 45 calendar days after contract award.

BLK 14: Reproducible copies shall be electronic transmission.

The government shall have 15 calendar days for review and acceptance/rejection of initial submission and 15 days for review and acceptance/rejection of subsequent submissions.

All documentation shall be sent to:

EXHIBIT A – ATTACHMENT 1

ARMY RESEARCH LABORATORY

Report Title Goes Here Any Subtitles Go Here

By Some Author and Another Author

Month XXXX

Prepared by

Whatever Technology Corporation 0000 Research Drive

Anywhere, ST 20006-1000

Under contract

W911QX-XX-C-XXXX

DISTRIBUTION STATEMENT GOES HERE

EXHIBIT A – ATTACHMENT 2

The findings in this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents.

Citation of manufacturer's or trade names does not constitute an official endorsement or approval of the use thereof.

DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual, Chapter 5, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

File details come from the government source that posted it. Updated .