DD1423 - W911QX24Q0082 (DRAFT).pdf

PDF 164 KB Posted

Attached to
SMALL BUSINESS SET-ASIDE FOR QTY. one (1) Four Square Gear (FSG) Rig
Solicitation number
W911QX-24-Q-0082
Issued by

About this file

This document contains a draft Contract Data Requirements List (CDRL) for a federal contract opportunity to procure a Four Square Gear (FSG) Rig.

The CDRL outlines six contract line items requiring kickoff meeting documentation, preliminary and final design review documentation, a factory acceptance testing report, an installation and commissioning report, and final as-built design documentation. Delivery of the FSG Rig is required no later than 42 weeks after contract award to the Army Research Laboratory in Aberdeen Proving Ground, Maryland. The Rig must meet specified technical requirements including gear dimensions, maximum torque and speed capabilities, temperature control, and data acquisition. Offer responses are due by March 21, 2024 to the Army Contracting Command for consideration as a small business set-aside procurement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template last updated 10/21/2021

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MISC

D. SYSTEM/ITEM

FSG Rig

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Kickoff meeting documentation

3. SUBTITLE

Kickoff Meeting

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81356a

5. CONTRACT REFERENCE

CLIN 0001

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

AREQ

12. DATE OF FIRST

SUBMISSION See BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION See BLK 16

Draft Final

Reg Repro

16. REMARKS

BLOCK 12: The Contractor shall make available to the Technical Point of Contact (TPOC) the kickoff meeting documentation 1 week After Contract Award (ACA).

BLOCK 13: SUBSEQUENT SUBMISSIONS ARE DUE WHEN REQUESTED.

BLOCK 14a: ADDRESSSE –

POINT OF CONTACT: TBD

EMAIL ADDRESS: TBD

BLOCK 14.b: SUBMIT ELECTRONIC COPIES BY EMAIL

TBD 1

15. TOTAL

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MISC

D. SYSTEM/ITEM

FSG Rig

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Preliminary Design Review Documentation

3. SUBTITLE

Preliminary Design Review

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81356a

5. CONTRACT REFERENCE

CLIN 0002

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

LT

AREQ

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION See BLK 16

Draft Final

Reg Repro

16. REMARKS

BLOCK 12: The Contractor shall make available to the Technical Point of Contact (TPOC) The Preliminary Design Review documentation.

BLOCK 13: SUBSEQUENT SUBMISSIONS ARE DUE WHEN REQUESTED.

BLOCK 14a: ADDRESSSE –

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MISC

D. SYSTEM/ITEM

FSG Rig

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Final Design Review documentation

3. SUBTITLE

Final Design Review documentation

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81356a

5. CONTRACT REFERENCE

CLIN 0003

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

LT

AREQ

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION See BLK 16

Draft Final

Reg Repro

16. REMARKS

BLOCK 12: The Contractor shall make available to the Technical Point of Contact (TPOC) The Final Design Review documentation.

BLOCK 13: SUBSEQUENT SUBMISSIONS ARE DUE WHEN REQUESTED.

BLOCK 14a: ADDRESSSE –

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MISC

D. SYSTEM/ITEM

FSG Rig

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Factory Acceptance Testing with ARL personnel onsite report

3. SUBTITLE

Factory testing and acceptance report

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81356a

5. CONTRACT REFERENCE

CLIN 0004

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

LT

AREQ

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION See BLK 16

Draft Final

Reg Repro

16. REMARKS

BLOCK 12: The Contractor shall make available to the Technical Point of Contact (TPOC) The Factory Acceptance Testing with ARL personnel onsite report.

BLOCK 13: SUBSEQUENT SUBMISSIONS ARE DUE WHEN REQUESTED.

BLOCK 14a: ADDRESSSE –

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MISC

D. SYSTEM/ITEM

FSG Rig

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Installation, training, and commissioning of the FSG at APG with delivery of operator’s manual and standard operating procedures.

3. SUBTITLE

Delivery of operating procedures

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81356a

5. CONTRACT REFERENCE

CLIN 0005

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

LT

AREQ

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION See BLK 16

Draft Final

Reg Repro

16. REMARKS

BLOCK 12: The Contractor shall make available to the Technical Point of Contact (TPOC) The Installation, training, and commissioning of the FSG at APG with delivery of operator’s manual and standard operating procedures No later than 40 weeks after contract award.

BLOCK 13: SUBSEQUENT SUBMISSIONS ARE DUE WHEN REQUESTED.

BLOCK 14a: ADDRESSSE –

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MISC

D. SYSTEM/ITEM

FSG Rig

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

As-built design documentation and final component cut-sheets

3. SUBTITLE

Final component cut-sheets

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81356a

5. CONTRACT REFERENCE

CLIN 0006

6. REQUIRING OFFICE

TBD

7. DD 250 REQ

LT

AREQ

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION See BLK 16

Draft Final

Reg Repro

16. REMARKS

BLOCK 12: The Contractor shall make available to the Technical Point of Contact (TPOC) The As-built design documentation and final component cut-sheets no later than 40 weeks ACA.

BLOCK 13: SUBSEQUENT SUBMISSIONS ARE DUE WHEN REQUESTED.

BLOCK 14a: ADDRESSSE –

X Contract Specialist

One of the two below digital signatures should be completed as well:

Contracting Officer (KO)

Data Management Officer (DMO) [Except SBIR I]

EXHIBIT A – ATTACHMENT 1

ARMY RESEARCH LABORATORY

Report Title Goes Here Any Subtitles Go Here

By Some Author and Another Author

Month XXXX

Prepared by

Whatever Technology Corporation 0000 Research Drive

Anywhere, ST 20006-1000

Under contract

W911QX-XX-C-XXXX

DISTRIBUTION STATEMENT GOES HERE

EXHIBIT A – ATTACHMENT 2

The findings in this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents.

Citation of manufacturer's or trade names does not constitute an official endorsement or approval of the use thereof.

DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual, Chapter 5, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

File details come from the government source that posted it. Updated .