This is a Request for Quotation (RFQ) for nuts manufactured per Drawing 11580005, Revision C, for 81mm M177 Mortar components to be supplied to Watervliet Arsenal. The solicitation includes two contract line items (CLINs): CLIN 0001 requires delivery of three nuts for first article testing within 60 calendar days from contract award, followed by 58 production nuts within 30 calendar days of first article approval; CLIN 0002 provides an alternative if first article testing is waived, with all 61 nuts due within 120 calendar days of award. The pricing arrangement is firm fixed price with FOB destination to Watervliet Arsenal, 1 Buffington Street, Watervliet, NY 12189-4050. Quotations must be submitted electronically to coby.r.brickner.civ@army.mil as complete responses to be considered responsive, with the contract specialist available at 518-266-4505.
The solicitation requires compliance with critical manufacturing and quality specifications, including use of wrought steels conforming to AISI standards (excluding merchant quality, leaded, resulfurized, or cast materials). Contractors must deliver certified test reports showing all chemical and mechanical tests per drawing and specification requirements, inspection records for first article samples using WVA Form 702-61-R-E, and production component inspection records with each shipment. The government reserves inspection and acceptance rights at Watervliet Arsenal, with latent material defect provisions allowing post-acceptance rejection within reasonable timeframes. All deliveries require advance appointment scheduling through the Carrier Appointment System. Contractors must possess or obtain DD Form 2345 certification for access to export-controlled technical data, comply with security and access requirements including potential Common Access Card (CAC) issuance, and acknowledge restrictions on disclosure of Watervliet Arsenal cannon production technology. This is not a small business set-aside. Payment will be made via electronic funds transfer through the Wide Area Workflow (WAWF) system with standard prompt payment terms.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
c. CITY
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
Section A - Solicitation/Contract Form
Nut Per DWG for the Watervliet ArsenalInstrument Name:
Product Service Code : 1015
LOCAL NARRATIVE A
REQUEST FOR QUOTE RESPONSES
ALL RESPONSES MUST BE ELECTRONIC. YOU MUST SUBMIT YOUR QUOTE RESPONSES
USING THE FOLLOWING METHODS:
(a) Email to: coby.r.brickner.civ@army.mil
(b) Request for Quotes must be filled out completely and sent in its entirety to be considered responsive.
DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via FedBizOpps) an offeror must have a current DD 2345, "Militarily Critical Technical Data Agreement" certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, go to http://www.dlis.dla.mil /jcp/, click on documents, and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow access to export controlled TDPs once certification is confirmed. Upon receipt of certification, an offeror may request the TDP in accordance with the instructions stated in the solicitation's Section C.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
W911PT26QA115
Disclosure of Unit Price Information
This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices of the awardee in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such release prior to submission of initial proposals.
*** END OF NARRATIVE ***
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
LOCAL NARRATIVE B
NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS
(a) IMPORTANT DELIVERY/QUALITY REQUIREMENTS:
(1) ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE
REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE
ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.
(2) ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE
DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO
COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION
OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO
EXTEND DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).
(3) PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS
IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING
PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.
(4) PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR
CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.
NOTICE: Throughout this document we may use the terms "we" and "you", the term "we" means the government of the United States of America, and the term "you" means the contractor.
(b) WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS: "Watervliet Arsenal Information for Contractors" document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address: http://www.wva.
army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available."
POC - CONTRACT SPECIALIST/BUYER: Coby Brickner
TELEPHONE NUMBER: 518-266-4505
E-MAIL ADDRESS: coby.r.brickner.civ@army.mil
CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:
Please provide the following information for your company.
VENDOR NAME: _________________________
VENDOR POC: __________________________
POC PHONE: ____________________________
E-MAIL ADDRESS (see note below): __________________________
UNIQUE ENTITY ID: _______________________
CAGE CODE (if known) __________________
TAX ID NUMBER ________________________
VENDOR FAX NUMBER ________________
NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you.
If we experience difficulties with e-mail, it will be data faxed.
(d) POSTERS:
(1) Contracts for Material, Supplies, Articles and Equipment Exceeding $15,000/Service Contract Labor Standards. Orders subject to these Acts require contractors to post WH Publication 1313, "Employee Rights on Government Contracts".
(2) Construction Orders. Orders for construction require contractors to post WH Publication 1321, "Employee Rights under the Davis Bacon" and the Office of Federal Contract Compliance poster on "Equal Employment Opportunity is the Law."
(3) These posters can be accessed electronically at http://www.dol.gov .
(4) Hard copies of the posters will be made available upon request to the contracting officer.
(e) PAYMENTS: Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the "my invoice" system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.
(f) RELEASE OF INFORMATION:
The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor's responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.
usapa.army.mil/pdffiles/r360_1.pdf
*** END OF NARRATIVE ***
Item Supplies/Service Quanti ty
Unit Unit Price Amount
0001 NUT PER DWG 11580005
Manufacturer's CAGE: 19206
Manufacturer's Part Number:
11580005
CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W16H1F608500M9
Product Service Code: 1015
North American Industry Classification System (NAICS):
332710
Defense Priorities Allocation System (DPAS) Priority Rating: DO- A5
Drawing Number: 11580005
Bill to Party: W16H1F
Claimant Program Code: A5
Pricing Arrangement: Firm Fixed Price
61 Each
Additional Descriptive Data:
FIRST ARTICLE REQUIRED - NUT PER DWG # 11580005. REV C, FOR 81mm M177
MORTAR.
To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST 2,3,12 (DD FORM 1423) which is attached hereto as EXHIBIT A. Along with General Data Drawings ATTACHMENT A.
** INSPECTION REQUIRED**
WBS: EH25UWV640EHM71
0002 NUT PER DWG 11580005
Manufacturer's CAGE: 19206
Manufacturer's Part Number:
11580005
CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W16H1F608500M9
Product Service Code: 1015
North American Industry Classification System (NAICS):
332710
Defense Priorities Allocation System (DPAS) Priority Rating: DO- A5
Drawing Number: 11580005
Bill to Party: W16H1F
Claimant Program Code: A5
61 Each
Pricing Arrangement: Firm Fixed Price
Additional Descriptive Data:
FIRST ARTICLE WAIVED - NUT PER DWG # 11580005. REV C, FOR 81mm M177
MORTAR.
To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST 2,3,12 (DD FORM 1423) which is attached hereto as EXHIBIT A. Along with General Data Drawings ATTACHMENT A.
** INSPECTION REQUIRED**
WBS: EH25UWV640EHM71
Section C - Description/Specifications/Statement of Work
LOCAL NARRATIVE C
ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
(a) The contractor and all associated subcontractors' employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 "Personal Identity Verification of Contractor Personnel") as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
(b) For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely;
(2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures;
or
(3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management.
(c) For contractors that do not require CAC, but require access to a DoD facility or installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCICIII) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures elsewhere in Section C; Non-disclosure Statement; for OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.
SCOPE OF WORK/TYPES OF STEEL
Wrought steels selected must conform to a standard AISI grade or designation. Merchant quality, leaded, resulfurized, rephosphorized or any combination thereof, are NOT acceptable steels.
Unless otherwise specified castings are also NOT acceptable. A list of suggested steels based on the drawing call-outs has been provided for informational purposes in paragraph 6.5 of the general cannon specification MIL-C-13931. Material or product specifications may be obtained from Metals & Alloys in the Unified Numbering System, a joint publication of the Society for Testing and Materials or the Metals Handbook, Volume 1, Properties and Selection: Irons and Steels.
CONTRACT DATA REQUIREMENT LIST - DD Form 1423
Form Approval OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002
B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A001
2. TITLE OF DATA ITEM: Certification/Data Report
3. SUBTITLE: Certified Test Report (CTR), Minor Forgings/Castings & Material (CN2)
4. AUTHORITY: DI-MISC-80678
5. CONTRACT REFERENCE: QAP-APPX-WVA and applicable drawing or material specification
6. REQUIRING OFFICE: TAWV-CQD-E
7. DD250 REQUIRED: No
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: B Test and Evaluation
10. FREQUENCY: With Each Submission
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With Each Shipment
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-CQD-E Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.3, 10.4 of referenced DID (Block 4). Submit a CTR showing the results of all chemical and mechanical tests required by the drawing and/or specification. See QAP-APPX-WVA paragraph 4.6 for the requirement. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY: J Cannon
H. DATE: 3 Mar 2025
I. APPROVED BY: William Potter, TAWV-CQD-E
J. DATE: 03 Mar 2025
CONTRACT DATA REQUIREMENT LIST - DD Form 1423
Form Approval OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A002
2. TITLE OF DATA ITEM: Test/Inspection Report
3. SUBTITLE: Inspection Records - First Article Sample WVA FORM 702-61-R-E, 16 March 2016 702-CQD-E 61 8 Jan 2025(CN 3)
4. AUTHORITY: DI-NDTI-80809B
5. CONTRACT REFERENCE: First Article Clause
6. REQUIRING OFFICE: TAWV-CQD-C CQD-E
7. DD250 REQUIRED: *See Block 16
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: B Test and Evaluation
10. FREQUENCY: ONE/P
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Article
13. DATE OF SUBSEQUENT SUBMISSIONS: With First Article
14. DISTRIBUTION:
A. ADDRESSEES: As specified in contract or purchase order
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.2 of referenced DID (Block 4). Submit WVA Form 702-61-R- E showing results of inspections. Also submit DD Form 1222. Computerized versions of these forms may be used with prior approval of the procuring office. See QAP-APPX-WVA paragraph 10 for requirements. * Inspection/acceptance requirements specified in the contract. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY: J Cannon
H. DATE: 3 Mar 2025
I. APPROVED BY: William Potter, TAWV-CQD-E
J. DATE: 3 March 2025
CONTRACT DATA REQUIREMENT LIST - DD Form 1423
Form Approval OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 and 0002
B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A003
2. TITLE OF DATA ITEM: Test/Inspection Report
3. SUBTITLE: Inspection Records, Production Components (CN12)
4. AUTHORITY: DI-NDTI-80809B
5. CONTRACT REFERENCE: QAP-APPX-WVA
6. REQUIRING OFFICE: TAWV-CQD-E
7. DD250 REQUIRED: No
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: B Test and Evaluation
10. FREQUENCY: With Each Submission
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Shipment
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-CQD-E Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.2 through 10.2.8 of referenced DID (Block 4).
Submit all records for production components. See QAP-APPX-WVA paragraph 4.2 and 4.5 for the requirement.
Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
G. PREPARED BY: J. Cannon
H. DATE: March 3, 2025
I. APPROVED BY: William Potter, TAWV-CQD-E
J. DATE: March 3, 2025
*** END OF NARRATIVE ***
Requirements
NUT
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE/FIRST ARTICLE CLAUSE REQUIREMENTS
52.0000-4901 PLACE OF INSPECTION AND ACCEPTANCE
Government inspection/acceptance will be made by the authorized Government Representative located at: Inspection Acceptance
[X ] Watervliet Arsenal [ X] Watervliet Arsenal
[ ] Contractor's Plant [ ] Contractor's Plant
GENERAL REQUIREMENTS FOR QUALITY ASSURANCE (DEC 2001) (ACC-WRN(WVA))
Contractor requirements and inspection provisions are required in accordance with QAP- APPENDIX-BL and item QAP (s), if applicable.
(END OF CLAUSE)
LATENT MATERIAL DEFECT (Oct 1993) (ACC-WRN(WVA))
When the contractor certifies that the material delivered under this order conforms to the material specified herein, the Government may within a reasonable time from receipt of material, and notwithstanding previous acceptance, perform a physical/chemical analysis of the material to assure conformance to specification requirement. Failure of the material to meet the physical /chemical requirements will be a cause for rejection as a Latent Material Defect and will necessitate replacement of the material at the contractor's expense when so directed by the Contracting Officer.
(END OF CLAUSE)
52.209-4 Alt I -- First Article Approval -- Government Testing (Sep 1989)
(a) The Contractor shall deliver THREE NUTS,11580005, shall be furnished for 100% inspection of all requirements, to assure compliance with QAP(s), specification(s) and drawing(s).
If a first article requirement is specified on any QAP that is listed in PART I, the first article for that component shall be preformed as specified on that QAP.unit(s) of Lot/Item CLIN 0001 within 60 calendar days from the date of this contract to the Government at:
WATERVLIET ARSENAL
VENDOR QUALITY & GAGE CALIBRATION WORK GROUP
BLDG #35E, ATTN: TAWV-ODQ-M
WATERVLIET, NY 12189-4050
for first article tests. The shipping documentation shall contain this contract number and the Lot /Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within __30___ calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government.
The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor --
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror /Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(j) The Contractor shall produce both the first article and the production quantity at the same facility.
*** END OF NARRATIVE ***
Overall Contract Inspection/Acceptance Locations
0001 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept per 11580005
DoDAAC: W911PT CountryCode: USA
W6QK ACC WVA
ACC WATERVLIET ARSENAL, 1 BUFFINGTON ST
WATERVLIET, NY 12189-4050
UNITED STATES
0002 Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept per 11580005
DoDAAC: W911PT CountryCode: USA
W6QK ACC WVA
ACC WATERVLIET ARSENAL, 1 BUFFINGTON ST
WATERVLIET, NY 12189-4050
UNITED STATES
Section F - Deliveries or Performance
LOCAL NARRATIVE F
DELIVERY INFORMATION
Effective March 1, 2020, all commercial carriers must request an appointment for delivery to Watervliet Arsenal through the Carrier Appointment System (CAS). Carriers can register for CAS at https://eta.sddc.army.mil/. In the event that a carrier is either unable to register for CAS, or if CAS is down, carriers must call the transportation desk at 518- 266-5858 to schedule an appointment
Note(s):
Late/early arrivals may be rescheduled to the next available appointment date. This will not apply to small package carriers such as FEDEX, UPS, or DHL.
(b) Notice: Normal delivery hours for receipt of supplies at Watervliet Arsenal are as follows:
Monday through Thursday Business Hours: 6:30 A.M. EST to 3:30 P.M. EST Friday Business Hours: Every other Friday from 6:30 A.M. EST to 2:00 P.M. EST Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2026 to be closed is January 9, 2026.
BASED ON THE ABOVE, CONTRACTORS SHOULD CALL THE CONTRACT/PURCHASE
ORDER ADMINISTRATOR IN ADVANCE IF DELIVERY IS SCHEDULED FOR A FRIDAY TO
FIND OUT IF THE ARSENAL WILL BE OPEN FOR BUSINESS.
Also, when a federal holiday is normally observed on a Friday, the Arsenal may be closed on the preceding Thursday. In these instances, please contact the contract/purchase order administrator in advance of delivery if Thursday delivery is anticipated to determine if the arsenal will be open for business.
THE ABOVE INFORMATION SHOULD BE NOTED WHEN SCHEDULING DELIVERIES AS
WATERVLIET ARSENAL WILL NOT BE LIABLE FOR ANY STORAGE, DEMURRAGE OR
SHIPPER LABOR COSTS INCURRED AS A RESULT OF CONTRACTOR ATTEMPTED
DELIVERIES ARRIVING DURING NONBUSINESS HOURS.
ITEM DESCRIPTION:
The material delivered hereon must be tagged or otherwise identified by placing the purchase order /contract number on the packing slip or it will be returned at the contractor's expense. If more than one item is involved, material must be segregated by item and must be tagged or otherwise identified by item number. National stock number, when applicable, must be shown on all vendor's documents, such as Bill of Lading, Notice of Shipment, delivery or packing slip, etc.
*** END OF NARRATIVE ***
0001 Delivery Schedule From date of lead time event to delivery 90 Calendar Days
Date of Award Receipt 3 Each Delivery Schedule From date of lead time event to delivery 30 Calendar Days
Date of First Article Test Approval 58 Each
61 EachQuantity
Address and POC Ship To DoDAAC: W16H1F CountryCode: USA
W0K9 OSC WVA-STOCK RECORD ACCT
1 BUFFINGTON ST BLDG 35, WATERVLIET NY 12189-4050 WATERVLIET, NY
12189-4050 UNITED STATES
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
0002 Delivery Schedule From date of lead time event to delivery
120 Calendar Days
Date of Award Receipt 61 EachQuantity
Address and POC Ship To DoDAAC: W16H1F CountryCode: USA
W0K9 OSC WVA-STOCK RECORD ACCT
1 BUFFINGTON ST BLDG 35, WATERVLIET NY 12189-4050 WATERVLIET, NY
12189-4050 UNITED STATES
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.242-17 Government Delay of Work. 1984-04
52.247-34 F.o.b. Destination. 1991-01
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
DFARS Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process Electronic invoicing.
vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF WAWF training.
Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web WAWF methods of document submission.
entry, Electronic Data Interchange, or File Transfer Protocol.
(f) The Contractor shall use the following information when WAWF payment instructions.
submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following Document type.
document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Invoice and Receiving Report Combo
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
N/A
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Document routing.
Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC
HQ0303
Issue By DoDAAC
W911PT
Admin DoDAAC
W911PT
Inspect By DoDAAC W16H1F
Ship To Code W16H1F
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) The Contractor shall ensure a payment request includes Payment request.
documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the Receiving report.
requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Coby Brickner, 518-266-4505, coby.r.brickner.civ@army.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
LOCAL NARRATIVE H
CRITICAL MILITARY TECHNOLOGY
The documents, drawings (microfilms) listed herein contain critical military technology that is owned by the United States Government, Watervliet Arsenal. These documents, drawings (microfilm) are not to be used for any purpose other than the purpose for which they are furnished, nor shall they be distributed or reproduced for any purpose, nor any part of their contents revealed in any manner, to persons other than the individuals or organizations specified to receive it, or their employees, without written consent of the Watervliet Arsenal.
LIST OF DOCUMENTS/DRAWING NO.
11580005, REV C
DISCLOSURE OF WATERVLIET ARSENAL TECHNOLOGY
In accordance with, Title 10 of the U.S. Code Section 4542, no Cannon Production Technology as defined herein, may be furnished to any foreign source or representative thereof. Therefore, solicitations and subsequent contracts for this requirement will be confined only to United States, Puerto Rico, and Canada which are considered part of the United States Industrial Base. Cannon Production Technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside the offeror's /contractor's firm and/or the United States of America (the latter prohibition includes, but is not limited to, disclosure to the offeror's/contractor's foreign subsidiaries, affiliates, etc.) nor will such technology be used to manufacture cannon (as defined below) or other defense items being manufactured or developed at Watervliet Arsenal, in response to requests from anyone other than Watervliet Arsenal, without prior written approval of Watervliet Arsenal (WVA). The offeror /contractor is hereby notified that any breach by him/her of the above provision may legally be pursued by the Government as a breach of implied contract (with respect to an offeror) or breach in contract (with respect to the firm awarded the contract). The offeror/contractor is hereby also placed on written notice that any damages the Government chooses to pursue for such breach may include any consequential damages for which the offeror/contractor would be liable. In addition, injunctive relief may be pursued in the event of violation of the above provision. If prior approval of Watervliet Arsenal has been obtained, as required by the above provision, any subcontract is involved, the contractor shall insert the substance of this provision (that is, the first three full paragraphs above) in such subcontract. Failure of the contractor to include this provision in any subcontract may be pursued by the Government as a breach of contract by the contractor whereby he/she may be liable for any damage, to include consequential damages, caused Watervliet Arsenal due to unauthorized release or use of the data by the subcontractor.
Additionally, any drawings, specifications, or other technical data furnished with this solicitation need not be returned to the Watervliet Arsenal, but should be disposed of by the offeror, however care must be taken to assure disposal of the data is made in a manner which will comply with the terms of this provision.
DEFINITIONS
1. CANNON: is defined as a complete assembly consisting of a tube, breech mechanism, firing mechanism, and all integral components. It may include tube attachments and muzzle appendages. It is a component of a weapon system of 40mm Bore or over such as tank guns, towed and self-propelled howitzers, naval guns, mortars, and recoilless guns.
2. CANNON PRODUCTION TECHNOLOGY: is defined as the technical data package and manufacturing technology.
a. TECHNICAL DATA PACKAGE: cannon engineering drawings, specifications and standards.
b. MANUFACTURING TECHNOLOGY: is technical knowledge, documentation, assistance, and equipment and machines used and useful in the manufacture of cannon.
(1) TECHNICAL KNOWLEDGE: is the know-how collected, trade secrets, production experience and special skills necessary for the production of cannon and is the technical information and inventions necessary for the manufacture of cannon and relating to the manufacture of cannon.
(2) TECHNICAL DOCUMENTATION: is manufacturing technical data; comprising drawings, specifications, schemes, composition, descriptions, methods of calculations, instructions, and other information necessary and sufficient for the manufacture of cannon.
(3) TECHNICAL ASSISTANCE: is all assistance required to make practical and economical use of the technology required to manufacture cannon, such as delivery of documentation, training of personnel, instructions, consultations and acquainting of specialists with the most economical method of using this technology in the manufacture of cannon.
(4) EQUIPMENT AND MACHINES: are production machines, machine accessories, apparatuses, spare parts and tooling, complete and in such quantity and quality as to secure the proper operation of a plant for cannon manufacture.
*** END OF NARRATIVE ***
Section I - Contract Clauses
LOCAL NARRATIVE I
PROMPT PAYMENT NOTICE TO FAR 52.232-25
(a)(5)(i) For the purposes of this clause referenced elsewhere herein, Government acceptance shall be deemed to have occurred constructively on the day after the contractor delivered the 30th supplies or performed the services.
*** END OF NARRATIVE ***
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.204-9 Personal Identity Verification of Contractor Personnel.
2011-01
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (Deviation 2026-O0038)
2026-02
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)
2026-02
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.211-5 Material Requirements.
(Deviation 2026-O0038)
2026-02
52.211-15 Defense Priority and Allocation Requirements.
2008-04
52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026- O0038)
2026-02
52.222-19 Child Labor-Cooperation with Authorities and Remedies.
(Deviation 2026-O0038)
2026-03
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment.
(Deviation 2026-O0038)
2026-02
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.222-90 Addressing DEI Discrimination by Federal Contractors.
(Deviation 2026-O0040, Revision 1)
2026-04
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.232-1 Payments. 1984-04
52.232-8 Discounts for Prompt Payment. 2002-02
52.232-11 Extras. 1984-04
52.232-33 Payment by Electronic Funds Transfer-System for Award Management.
2018-10
52.233-1 Disputes. (Deviation 2026- O0038)
2026-02
52.243-1 Changes-Fixed-Price. (Deviation 2026-O0038)
2026-02
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-04
52.253-1 Computer Generated Forms.
2026-02
DFARS Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7000 Disclosure of Information. 2016-10
252.204-7003 Control of Government Personnel Work Product.
1992-04
252.223-7008 Prohibition of Hexavalent Chromium.
2023-01
252.225-7001 Buy American and Balance of Payments Program.
2024-02
252.225-7002 Qualifying Country Sources as Subcontractors.
2022-03
252.232-7010 Levies on Contract Payments. 2006-12
252.243-7001 Pricing of Contract Modifications. 1991-12
252.244-7000 Subcontracts for Commercial Products or Commercial Services.
2023-11
252.247-7023 Transportation of Supplies by Sea.
2024-10
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017)
(a) Definitions. As used in this clause-
Internal confidentiality agreement or statement means a confidentiality agreement or any other written statement that the contractor requires any of its employees or subcontractors to sign regarding nondisclosure of contractor information, except that it does not include confidentiality agreements arising out of civil litigation or confidentiality agreements that contractor employees or subcontractors sign at the behest of a Federal agency.
Subcontract means any contract as defined in subpart 2.1 entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.
Subcontractor means any supplier, distributor, vendor, or firm (including a consultant) that furnishes supplies or services to or for a prime contractor or another subcontractor.
(b) The Contractor shall not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information (e.g., agency Office of the Inspector General).
(c) The Contractor shall notify current employees and subcontractors that prohibitions and restrictions of any preexisting internal confidentiality agreements or statements covered by this clause, to the extent that such prohibitions and restrictions are inconsistent with the prohibitions of this clause, are no longer in effect.
(d) The prohibition in paragraph (b) of this clause does not contravene requirements applicable to Standard Form 312 (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.
(e) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015, (Pub. L. 113-235), and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions) use of funds appropriated (or otherwise made available) is prohibited, if the Government determines that the Contractor is not in compliance with the provisions of this clause.
(f) The Contractor shall include the substance of this clause, including this paragraph (f), in subcontracts under such contracts.
(End of clause)
52.204-19 Incorporation by Reference of Representations and Certifications.
2014-12
Incorporation by Reference of Representations and Certifications (Dec 2014)
The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
52.213-4 Terms and Conditions-Simplified Acquisitions (Noncommercial).
Terms and Conditions-Simplified Acquisitions (Noncommercial) (Feb 2026) (Deviation 2026-
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights-
(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall-
(1) Notify the Contracting Officer in writing as soon as possible;
(2) Remedy the delay as quickly as possible; and
(3) Notify the Contracting Officer when the occurrence is over.
(c) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(d) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(e) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
52.219-28 Postaward Small Business Program Rerepresentation.
Postaward…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .