Amendment W911PT25Q00020001.pdf
PDF 372 KB Posted
- Solicitation number
- W911PT25Q0002
About this file
This document is an amendment to solicitation W911PT25Q0002 for Aboveground/Underground Storage Tank Services at the Watervliet Arsenal, Watervliet NY. The amendment removes the requirement for testing of containment sumps and catch basins for option years 1 and 2 (CLINs 0002 and 0003). The key pricing details required include routine labor rate, service call rate, overtime rate, cost plus percentage for parts, hourly rates for underground storage tanks cathodic protection system testing, inspection/testing of automatic line leak detector and annual line tightness testing, and maintaining/repairing tank systems and alarms/monitoring systems. The performance period is a 3-year base contract with 2 one-year option periods. The applicable service contract labor standards wage determination is WD 15-4143. The Contracting Officer Point of Contact is Heather Kosnick.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911PT25Q0002.pdf | ||
| Statement of Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W16H1F421500ET
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to remove the requirement for QTY 6 - Complete tesing of containment sumps and catch basins per 40 CFR Part
280.35 for options years 1 & 2 (CLIN 0002 & 0003). See attached Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Oct-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911PT25Q0002
X 9B. DATED (SEE ITEM 11)
10-Oct-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Oct-2024
CODE
ARMY CONTRACTING COMMAND-WVA
ATTN: CCTA-HDW/BLDG 10
1 BUFFINGTON STREET
WATERVLIET NY 12189-4050
W911PT 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911PT25Q0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The CLIN extended description has changed from:
Contractor to Provide a 3 Year (Base + 2 Option Years) Repair/Maintenance of Tanks and Testing/Inspection for Aboveground and Underground Storage Tank (Service Contract); as Required by State and Federal Regulations per attached Statement of Work.PROVIDE THE FOLLOWING PRICE INFORMATION:*ROUTINE LABOR RATE:
$______________ PER HOUR (Include all travel,overhead and profit in pricing). *SERVICE CALL:
$_______________ PER HOUR (48hr response) (Include alltravel, overhead and profit in pricing).*OVERTIME:
$_______________ PER HOUR (Include all travel, overhead andprofit in pricing).*Provide a cost plus percentage for parts $_________________Qty 6 - Complete tesing of containment sumps and catch basins per 40 CFR Part 280.35: $_______________ per hour (include all travel, overhead and profit in pricing; base year requirement only).Qty 6 - Underground Storage Tanks yearly cathodic protection system testing*Cathodic Testing:
$_______________ per hour (include all travel, overhead and profit in pricing).Qty 1 - yearly requirement is the inspection/testing of automatic line leak detector and annual line tightness testing for the diesel UST, Tank WVA-28 at building #116: $_______________ per hour (include all travel, overhead and profit in pricing).Qty 26 -maintain/repair tank systems and repair/replace alarms and monitoring systems as needed for all storage tanks at WVA; $_______________ per hour (include all travel, overhead and profit in pricing)Service Contract Labor Standards WD 15-4143 latest Revision Applies and is incorporated.Watervliet POC is Heather Kosnick
To:
Contractor to Provide a 3 Year (Base + 2 Option Years) Repair/Maintenance of Tanks and Testing/Inspection for Aboveground and Underground Storage Tank (Service Contract); as Required by State and Federal Regulations per attached Statement of Work.PROVIDE THE FOLLOWING PRICE INFORMATION:*ROUTINE LABOR RATE:
$______________ PER HOUR (Include all travel,overhead and profit in pricing). *SERVICE CALL:
$_______________ PER HOUR (48hr response) (Include alltravel, overhead and profit in pricing).*OVERTIME:
$_______________ PER HOUR (Include all travel, overhead andprofit in pricing).*Provide a cost plus percentage for parts $_________________Qty 6 - Underground Storage Tanks yearly cathodic protection system testing*Cathodic Testing: $_______________ per hour (include all travel, overhead and profit in pricing).Qty 1 -yearly requirement is the inspection/testing of automatic line leak detector and annual line tightness testing for the diesel UST, Tank WVA-28 at building #116: $_______________ per hour (include all travel, overhead and profit in pricing).Qty 26 - maintain/repair tank systems and repair/replace alarms and monitoring systems as needed for all storage tanks at WVA; $_______________ per hour (include all travel, overhead and profit in pricing)Service Contract Labor Standards WD 15-4143 latest Revision Applies and is incorporated.Watervliet POC is Heather Kosnick
CLIN 0003
The CLIN extended description has changed from:
Contractor to Provide a 3 Year (Base + 2 Option Years) Repair/Maintenance of Tanks and Testing/Inspection for
W911PT25Q0002
Aboveground and Underground Storage Tank (Service Contract); as Required by State and Federal Regulations per attached Statement of Work.PROVIDE THE FOLLOWING PRICE INFORMATION:*ROUTINE LABOR RATE:
$______________ PER HOUR (Include all travel,overhead and profit in pricing). *SERVICE CALL:
$_______________ PER HOUR (48hr response) (Include alltravel, overhead and profit in pricing).*OVERTIME:
$_______________ PER HOUR (Include all travel, overhead andprofit in pricing).*Provide a cost plus percentage for parts $_________________Qty 6 - Complete tesing of containment sumps and catch basins per 40 CFR Part 280.35: $_______________ per hour (include all travel, overhead and profit in pricing; base year requirement only).Qty 6 - Underground Storage Tanks yearly cathodic protection system testing*Cathodic Testing:
$_______________ per hour (include all travel, overhead and profit in pricing).Qty 1 - yearly requirement is the inspection/testing of automatic line leak detector and annual line tightness testing for the diesel UST, Tank WVA-28 at building #116: $_______________ per hour (include all travel, overhead and profit in pricing).Qty 26 -maintain/repair tank systems and repair/replace alarms and monitoring systems as needed for all storage tanks at WVA; $_______________ per hour (include all travel, overhead and profit in pricing)Service Contract Labor Standards WD 15-4143 latest Revision Applies and is incorporated.Watervliet POC is Heather Kosnick
To:
Contractor to Provide a 3 Year (Base + 2 Option Years) Repair/Maintenance of Tanks and Testing/Inspection for Aboveground and Underground Storage Tank (Service Contract); as Required by State and Federal Regulations per attached Statement of Work.PROVIDE THE FOLLOWING PRICE INFORMATION:*ROUTINE LABOR RATE:
$______________ PER HOUR (Include all travel,overhead and profit in pricing). *SERVICE CALL:
$_______________ PER HOUR (48hr response) (Include alltravel, overhead and profit in pricing).*OVERTIME:
$_______________ PER HOUR (Include all travel, overhead andprofit in pricing).*Provide a cost plus percentage for parts $_________________Qty 6 - Underground Storage Tanks yearly cathodic protection system testing*Cathodic Testing: $_______________ per hour (include all travel, overhead and profit in pricing).Qty 1 -yearly requirement is the inspection/testing of automatic line leak detector and annual line tightness testing for the diesel UST, Tank WVA-28 at building #116: $_______________ per hour (include all travel, overhead and profit in pricing).Qty 26 - maintain/repair tank systems and repair/replace alarms and monitoring systems as needed for all storage tanks at WVA; $_______________ per hour (include all travel, overhead and profit in pricing)Service Contract Labor Standards WD 15-4143 latest Revision Applies and is incorporated.Watervliet POC is Heather Kosnick
(End of Summary of Changes)
File details come from the government source that posted it. Updated .