W911PT25P0132 - Award - Northline.pdf

PDF 1010 KB Posted

Attached to
Repairing Transformer at the Watervliet Arsenal, Watervliet NY
Solicitation number
W911PT25P0132
Issued by

About this file

This document is a federal contract award (DD Form 1155) issued by the Army Contracting Command-WVA to Northline Utilities LLC for replacing bus bars in the Main Substation Transformer 2 at Watervliet Arsenal. The contract (W911PT25P0132) is valued at $55,700.00, dated June 30, 2025, with net 30 days payment terms and delivery to the destination. The project involves providing labor, materials, tools, parts, and equipment to replace bus bars in accordance with Project #25PW028, with the technical point of contact being Michael Chase.

The contract specifies that the work will be performed under Wage Determination General Decision Number NY20250002, and the contractor is identified as a small business. The procurement is for a fixed-price (FFP) service with a project magnitude between $25,000 and $100,000. The work is to be completed within 60 calendar days after receiving the notice to proceed, and the contractor must adhere to specific requirements including safety protocols, environmental compliance, and on-site work restrictions at the Watervliet Arsenal facility.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6 . ISSUE D BY COD E

W911PT25P0132

1 . CO N TRA CT/P U RCH . O RD E R/

A G RE E M E N T N O .

W 911PT

2 . D E L IVE RY O RD E R/ CA L L N O .

52P A GE 1 O F

5 . P RIO RITY

COD E

8 . DE L IVE RY FOB

DE ST IN AT IONX

OT HE R

(See Sch edule if o t h er)

OR D ER FOR SUPPLIES OR SER VICES

3 . D A TE O F O RD E R/CA L L

2025 Jun 30

4 . RE Q ./ P U RCH . RE Q U E ST N O .

W16H 1F505000N P

SEE IT EM 6

AR MY C ON TR AC TIN G C OMMAN D -W VA

ATTN : C C TA-H D W /BLD G 10

1 BU F F IN GTON STR EET

W ATER VLIET N Y 12189-4050

7 . ADM IN IST E RED BY (if o th er th an 6 )

( YYYYM M M D D )

1 0 . D E L IVE R TO FO B P O IN T BY (D ate)

( YYYYM M M D D )

N OR TH LIN E U TILITIES LLC

C H R IS SH OF F

15 SC H OOL LN

AU SABLE F OR KS N Y 12912-4352

CO DE 4HL669 . CONT RACT O R FACILIT Y 4H L66

SEE SCHEDULE

1 2 . D ISCO U N T TE RM S

N et 30 D ays

M A RK IF BU SIN E SS IS1 1 .

SM A L L

SM A L L

D ISA D VA N TA G E D

W O M E N -O W N E D

1 3 . M AIL INVOICES T O T HE A DDRE SS IN BL OCK

See Item 15

25 . T OT A L $55,700.00

AR MY C ON TR AC TIN G C OMMAN D -W VA

SER VIC ES TEAM

ATTN : C C TA-H D W /BLD G 10

1 BU F F IN GTON STR EET

W ATER VLIET N Y 12189-4050

1 7 . A CCOUN T IN G AN D AP P RO P RIAT ION D AT A/ L OCA L USE

COD E

1 8 . IT E M NO. 1 9 . SCHE DU LE OF SU P P L IE S/ SE RVICES

* If q u a n t i ty a ccep ted b y th e G o vern m en t i s s a m e a s q u a n t i t y a ccep ted b elo w q u a n t i ty o r d ered a n d en ci rcl e.

DEL IVERY/16 .

1 4 . SHIP T O

Se e Sche dule

W 911PT H Q0303

MAR K ALL

P AC KA G ES AN D

P AP ERS W ITH

IDENTIFIC ATIO N

NU MB ERS IN

B LO C KS 1 AN D 2 .

2 3 . A M OUN T

15 . P A YM E NT W IL L BE M A DE BY CODE

D F AS - C OLU MBU S

D F AS-R OC K ISLAN D /J AIQBAC

ATTN : R OC K ISLAN D

PO BOX 182316

C OLU MBU S OH 43218-2316

Th i s d el iv ery o rd er/cal l i s i s su ed o n an o th er G o v ern men t ag en cy o r in acco rd an ce w i th an d su b j ect to t erms an d co n d i t io n s o f ab o v e n u mb ered co n t ract .

T YP E CAL L

OF P U RCHASE X

ORD E R

SEE SCHEDULE

24. UNITED STATES OF AMERICA

TEL: 5182664738

EMAIL: joseph.s.pokrentowski.civ@army.mil

CONTRACTING / ORDERING OFFICER

q u a n t i t y o rd er ed , in d ica t e b y X . If d i f fer en t , en ter a ctu a l

BY: JOSEPH POKRENTOWSKI

If t h is bo x is m ark ed, sup p lier m ust sign Accep t ance an d ret urn t h e fo llo wing n um ber o f co p ies:

NA M E OF CONT RACT OR SIGN AT URE T YP E D NAM E A ND T IT L E

( YYYYM M M D D )

DA T E SIGNED

ACCE P T ANCE . T HE CO NT RACT O R HE RE BY A CCE P T S T H E OFFE R RE P RE SE N T E D BY T H E NUM BE RE D P URCH ASE ORD E R AS IT M AY P RE VIOU SL Y H AVE BE E N OR IS NOW M O DIFIE D , SUBJE CT T O A LL OF T H E T E RM S

AN D CON DIT ION S SET FORT H , A ND A GREE S T O P E RFORM T HE SA M E .

2025 May 14Referen ce y o u r q u o te d at ed

Fu rn ish t h e fo l lo w in g o n terms sp ecifi ed h erein . REF :

2 0 . QU ANT IT Y

ORD E RE D/

ACCEP T E D*

2 1 . U NIT 2 2 . U NIT P RICE

D IFFE RE N CE S

26 .

IN SP ECT E D RE CEIVE D ACCE P T E D, AN D CO NFORM S T O T H E

CON T RACT E XCE P T AS NOT E D

2 7 a. QUA NT IT Y IN COL U M N 2 0 H AS BEE N

( YYYYM M M D D )

c. DA T E d. P RINT E D NAM E A ND T IT L E O F A UT H ORIZ E D

GOVE RNM E N T RE P RE SE NT AT IVE

b. SIGNAT URE O F A UT HORIZE D GOVE RNM E N T RE P RE SE NT AT IVE

e. M AIL ING AD DRESS O F A UT H ORIZ E D GOVERN M E NT RE P RE SE N T AT IVE

36. I ce r tify th is account is corr e ct and pr ope r for paym e nt.

g. E -M AIL ADD RE SSf. T E LE P H ONE N UM BE R

a. DA T E

( YYYYM M M D D )

b. SIGNAT URE AN D T IT L E OF CE RT IFYING O FFICE R

2 8 . SHIP NO . 2 9 . DO VO UCH E R NO. 30 .

IN IT IA L S

3 2 . P A ID BY 33 . AM OU NT VE RIFIE D

CORRE CT FOR

35 . BIL L OF L ADING NO.

34 . CH E CK NU M BER

3 7 . RE CE IVE D AT 3 8 . RE CE IVE D BY

( YYYYM M M D D )

3 1 . P A YM E NT

COM P LE T E

P ART IAL

FINA L

P ART IAL

FINA L

DD Form 1155, DEC 2001 P RE VIOUS E DIT ION IS OBSOL E T E.

3 9 . DAT E RE CE IVE D 4 0 . T O T AL

CON T AINE RS

4 1 . S/R A CCOU NT NO. 4 2 . S/R VO UCHE R N O.

AD D R ESS

AN D

N AME

Section SF 30 - BLOCK 14 CONTINUATION PAGE

LOCAL NARRATIVES

A.__ NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS

(a) IMPORTANT DELIVERY/QUALITY REQUIREMENTS:

(1) ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE

REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE

ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.

(2) ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE

DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO

COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION

OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND

DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).

(3) PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS

IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING

PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.

(4) PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR

CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.

NOTICE: Throughout this document we may use the terms “we” and “you”, the term “we” means the government of the United States of America, and the term “you” means the contractor.

(b) WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:

“Watervliet Arsenal Information for Contractors” document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address:

http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available.”

POC - CONTRACT SPECIALIST/BUYER: Christopher Battiste

TELEPHONE NUMBER: 518-266-4607

E-MAIL ADDRESS: christopher.k.battiste.civ@army.mil

CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:

Please provide the following information for your company.

VENDOR NAME: Northline Utilities LLC VENDOR POC: Michael J Grey

POC PHONE: 518-647-8198

E-MAIL ADDRESS (see note below): mgrey@northlinellc.com

UEI NUMBER: FT3DXCLDAHU5

CAGE CODE (if known) 4HL66 TAX ID NUMBER On File

NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you.

If we experience difficulties with e-mail, it will be data faxed.

(c) AWCF BULK FUND __X__ DOES ____ DOES NOT APPLY

(d) POSTERS:

(1) Contracts for Material, Supplies, Articles and Equipment Exceeding $15,000/Service Contract Labor Standards. Orders subject to these Acts require contractors to post WH Publication 1313, “Employee Rights on Government Contracts”.

(2) Construction Orders. Orders for construction require contractors to post WH Publication 1321, “Employee Rights under the Davis Bacon” and the Office of Federal Contract Compliance poster on “Equal Employment Opportunity is the Law.”

(3) These posters can be accessed electronically at http://www.dol.gov .

(4) Hard copies of the posters will be made available upon request to the contracting officer.

(e) PAYMENTS:

Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the “my invoice” system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.

(f) RELEASE OF INFORMATION:

The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor’s responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.usapa.army.mil/pdffiles/r360_1.pdf

C._1_ Submission of Recordable Injuries and Illness Cases (Dec 2012) (ACC-Warren (WVA)) Watervliet Arsenal is pursuing OSHA Voluntary Protection Program (VPP) recognition. The VPP impacts all contractors whose employees cumulatively work more than 1000 hours per quarter within a calendar year at Watervliet Arsenal (herein referred to as “applicable contractors”).

It is the contractor’s responsibility to ensure its employees and managers are in full compliance with OSHA requirements and have a general understanding of VPP. Detailed information on VPP is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html . All contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of Watervliet Arsenal.

Applicable contractors are required to annually submit to Watervliet Arsenal, ATTN: TAWV-XO-S/Safety Office, Bldg. 10, 1 Buffington Street, Watervliet, NY 12189-4000 or email: usarmy.watervliet.tacom.list.wate-safety@mail.mil the following documents (covering the previous calendar year quarters) by 15 January:

- Total Case Incidence Rate (TCIR) - the number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.

- Days Away, Restricted, and/or Transfer Case Incident Rate (DART) - Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.

- OSHA Form 300A

Applicable contractors may submit the above immediately following the completion of a quarter, if desired.

H._1_ SERVICES/CONSTRUCTION REQUIREMENTS

(a) SCHEDULE UNIT OF MEASURE NOTE: When "LOT" is stated as a unit of measure it is the equivalent to

"JOB".

(b) WORK PERFORMED ON-SITE AT WATERVLIET ARSENAL:

The contractor agrees that each employee working at Watervliet Arsenal will sign the “Contractor Personnel Agreement on Non-Disclosure of Watervliet Arsenal Technology below. Signatures must be received by the Contract Administrator before work may begin and any resultant delay won’t be considered an excusable delay to contract performance as defined in the contract clause “Default”. Additional copies of this Non-Disclosure Statement can be found on the Internet at http://www.wva.army.mil/Documents/Contracting/nondis.pdf

(d) CONTRACTOR PERSONNEL AGREEMENT ON NON-DISCLOSURE

OF WATERVLIET ARSENAL TECHNOLOGY

(1) The Undersigned, as an employee of _________________________ (Name of Firm) agrees to the following terms and conditions.

(2) Any knowledge gained, as a result of my being permitted on Watervliet Arsenal’s premises, concerning cannon production technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside of _________________________ (Name of firm) and/or the United States of America (this prohibition includes, but is not limited to, the company’s domestic and foreign subsidiaries, affiliates, etc.), nor will such technology be used to manufacture or assist another in the manufacture of cannon (as described below) or other defense items being manufactured or developed at Watervliet Arsenal, without the written prior approval of Watervliet Arsenal.

(3) Definitions:

(a) CANNON: is defined as any and all components/parts of a complete assembly consisting of a tube, breech mechanism, tube attachments, muzzle appendages, firing mechanisms, and all integral components.

It may also be a component of a weapons system of 40mm Bore or over such as tank guns, towed and self-propelled howitzers, naval guns, mortars and recoilless guns.

(b) CANNON PRODUCTION TECHNOLOGY: is defined as the technical data package and manufacturing technology.

(1) TECHNICAL DATA PACKAGE: cannon engineering drawings, specifications and standards.

(2) MANUFACTURING TECHNOLOGY: technical knowledge, documentation, assistance and equipment and machines used and/or useful in the manufacturing of cannon.

(c) TECHNICAL KNOWLEDGE: the know how collected, trade secrets, production experience and special skills necessary for the production of cannon and the technical information and inventions necessary for the manufacture of cannon and relating to the manufacture of cannon.

(d) TECHNICAL DOCUMENTATION: manufacturing technical data comprised of drawings, specifications, schemes, composition, descriptions, methods of calculations, instructions and other information necessary for the manufacture of cannon.

(e) TECHNICAL ASSISTANCE: all assistance required to make practical and economical use of the technology required to manufacture cannon, such as delivery of documentation, training of personnel, instructions, consultations and acquainting of specialists with the most economical method of using this technology in the manufacture of cannon.

(f) EQUIPMENT AND MACHINES: production machines, machine accessories, apparatuses, spare parts and tooling used for cannon manufacture.

TYPED OR PRINTED NAME, SIGNATURE DATE

TYPED OR PRINTED NAME, SIGNATURE DATE

TYPED OR PRINTED NAME, SIGNATURE DATE

(e) JOB SITE AVAILABILITY:

The work site will be available for performance during normal business hours:

Monday through Thursday Business Hours: 7:00 a.m. EST to 4:00 p.m. EST

Friday Business Hours: Every other Friday from 7:00 a.m. EST to 3:00 p.m. EST

Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2025 to be closed is January 10, 2025.

Based on the above, service contractors should call contract/purchase order administrator in advance if service is scheduled for a Friday to determine if the Arsenal will be open for business.

When a federal holiday is normally observed on Friday, the Arsenal may be closed on the preceding Thursday. In this case, contact the contract/purchase order administrator in advance if scheduling service to determine if the Arsenal will be open for business.

Work at other than the above hours won’t be allowed unless the contractor makes an application at least 48 hours in advance and gets written contracting officer approval. No guarantee is made that the job site will be made available other than as stated above.

(f) CONTROL OF FOREIGN VISITORS TO WATERVLIET ARSENAL:

Offerors are advised that any employee or representative of their company who is not a U.S. citizen, (or is representing a foreign company) and is a U.S. citizen), planning on visiting the Watervliet Arsenal for the purpose of attending: bid conferences, bid openings, site visits, engineering services, or any other visit related to this solicitation will be escorted at all times by an arsenal representative while on the installation grounds.

Therefore, offerors must notify the Contracting Officer in advance (a minimum of two [2] weeks) of any proposed visit by a non-U.S. citizen or U.S. citizen representing a foreign firm, to assure proper clearance for entry into the arsenal. Failure to comply, or disclose a foreign national visitor, may subject the Contractor to the penalties set forth in 18 U.S.C.A. Section 1001, Chapter 14.

Due to manpower constraints, Watervliet Arsenal is often unable to provide escort services during contract performance. Therefore, if the resulting contract requires performance on Watervliet Arsenal property, employees, individuals or subcontractors representing the successful offeror who are not U.S. citizens may not, depending on staffing levels and the availability of escorts, be allowed access to the Arsenal for purpose of contract performance.

Be further advised that the inability of the Arsenal to provide escorts resulting in denial of access to Watervliet Arsenal of the aforementioned personnel will not be considered an excusable delay to contract performance as defined in the contract clause “Default” contained in the contract. Therefore, offerors should consider the above contingencies during offer preparation.

(h) CONTRACTOR IDENTIFICATION:

Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence, and when working in situations where their actions could be construed as official government acts.

H.__ Army Contract Writing System (ACWS) Transition Information for Contractors - Orders

a. The Army Contracting Enterprise (ACE) is in the process of deploying new solicitation and contract writing software to Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software suite will soon replace most existing Army contract writing systems, including the system used to create and release this Order.

b. During this transition period, Contractors are hereby advised:

1. The Contracting Office may use any combination of contract writing systems to generate distributable copies of this order during its period of performance, as well as any subsequent modifications. As a result:

i. Subsequent documents you receive may appear noticeably different than the original order or previous contractual documents from the same Contracting Office.

ii. A change between contract writing systems may cause important information concerning order terms and conditions to take on different formatting or appear in different parts of later documents issued.

iii. Contractors shall ensure Customer Relationship Management (CRM) systems and personnel interacting with this order are prepared to identify and respond appropriately to differences between document versions.

2. The Government does not intend to use the shift between contract writing systems to effect any changes to order terms and conditions. Therefore:

i. Contractors should view changes to terms or conditions between document versions as system-generated and potentially erroneous unless accompanied by narrative(s) designating such changes as deliberate and desired.

ii. Contractors shall inform the Contracting Officer listed on the first page of the most recent document issued for guidance regarding any suspected or observed inadvertent or system-generated changes (e.g. noticing something missing in a new conformed copy).

iii. The Government will correct any inadvertent or system-generated changes, additions, or omissions discovered by either party, via bilateral modification, at no cost to the Contractor.

iv. The terms and conditions contained in the latest document reflecting deliberate action by the Contracting Officer (e.g. the last conformed copy of the order not affected by the observed issue) will take precedence until these problems are corrected.

3. In the unlikely event award information is corrupted or mutilated during system migration and replacement or re-issuance of this order is necessary for continued contract administration, the Contracting Officer will:

i. Issue a continuation contract/order in accordance with DFARS 204.1601(c) and DFARS PGI 204.1601(c), carrying over all terms and conditions from the last-known version of this order accurately reflecting mutual agreement of the parties.

ii. Incorporate the last-known version of this order accurately reflecting mutual agreement of the parties as an attachment to the replacement or continuation contract/order for future reference.

iii. Ensure any such reissuance or continuance is properly reported to preserve the integrity of Contractor performance measurement data, if any (e.g. FAPIIS, CPARS).

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

FOR

XPWX - Replace Bus Bars in Main Substation Transformer 2

AT

Watervliet Arsenal

Watervliet Arsenal, High Switchyard

Project #: 25PW028 Installation Management, Public Works Division

Facilities Engineering (TAWV-IMP-F) 20Feb25

Rev.0

PART 1 GENERAL

1.01 Overview.

A. As part of the Watervliet Arsenal electrical infrastructure improvement, the below has been identified for replacement.

1. Replace Secondary Bus of the 20MVA Transformer T2 of the Main Substation.

1.02 Scope.

A. This Statement of Work (SOW) defines the effort required to remove the existing bus connection between the transformer and the 15kV switchgear, along with any insulating blocks or bracketing accessories. Cable will be installed as a replacement for the removed bus bars. Cable shall be properly terminated, insulated and supported. Cables and connections shall be properly tested. Cable to be supplied by the government.

1.03 Existing Conditions.

A. The Main substation consists of two incoming 115kV lines, with two 1200A 115kV breakers with a tie connection.

B. Each side of the tie is connected to a 20MVA 115kV-13.2KV transformer, T1 and T2.

C. The connection between the secondary side of the transformer and the 15kV switchgear is through three sets of insulated bus bars that are supported by white insulating blocks. These bus bars are run in an overhead enclosure.

1.04 General Requirements.

A. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publically available at:

http://www.wva.army.mil/Documents/Contracting/WAIC.pdf

B. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for the complete execution of the requirements within the contract documents and requirements of this SOW. All necessary storage shall be provided by the Contractor. The government is NOT responsible for providing temporary or secure storage of Contractor’s materials, tools or equipment. Cable to be supplied by the government.

C. The contractor shall, prior to submitting a proposal, review (i) all contract documents, and (ii) the project work site, and shall provide written notice to Contracting Specialist detailing any discrepancies that are found between the contract documents and the project work site.

D. The contractor shall notify the Contracting Specialist a minimum of two (2) business days before the contractor starts work. The contractor shall notify the COR a minimum of ten (10) business days the shut-down of a utility or building service is needed or before a required witness point. Any outage requiring an interruption to manufacturing needs WVA Operations pre-approval prior to execution & may require adjustment of Contractor’s planned schedule. Operations interruptions may require up to sixty (60) days of schedule adjustment and should therefore be identified as early as possible. A detailed schedule shall only be required if the duration of the work to be performed is longer than a week.

E. The contactor shall clean all work areas, at the end of each work day, to remove all tools, equipment, debris, materials, and all waste from the work site.

F. The Contractor shall supply all safety barriers, cones, tape, signage, fencing, etc. to secure the work area. A Contractor’s representative shall ensure all safety equipment is replaced & secure from the elements, and verify that the COR or COR’s representative is satisfied with the placement prior to leaving the site at the end of each work day.

1.05 Contractor Qualifications.

A. Contractor shall submit their qualifications and relevant experience that pertain and cover the required work within the scope of this installation.

B. Workers who install, splice, terminate or test the cables shall have not fewer than five years of experience working with cables equivalent to those being supplied. Submit a list of workers who will splice and terminate the service entrance cables with documented relevant experience.

1.06 On-Site Permits (If Necessary)

A. Hot Work and Confined Space:

1. Obtain permit for welding, burning, use of flame, or entry into confined space from WVA Fire Department by calling (518)266-5990 each day the permit is to be used. Contractor shall also notify WVA Department when the work is discontinued or finished each day.

2. The contractor is responsible for having a correctly sized fire extinguisher that is up to date on inspections, on hand during the performance of their work.

B. Contractor is responsible to verify existing utility locations within area of work & maintaining any necessary marking(s) after the initial clearance permit is received. Damage caused by not maintaining markings shall be at the Contractor’s expense.

1.07 Safety Requirements.

A. General.

1. The contractor shall be responsible for complying with all DOD, Army, Federal, and State health and safety requirements which are applicable to this project, and shall use all means and precautions available to ensure the safety of the occupants and protection to the existing buildings and structures.

B. Contractor Safety Plan.

1. The contractor shall submit a safety plan which is specific to the work activity being performed under the scope of this project for Government review and approval.

C. Hazardous Materials.

1. The contractor shall inspect the project work site prior to starting work, and shall request a copy of the asbestos inspection records to verify the location and description of known asbestos-containing materials. The contractor shall sign the “Asbestos Notification Acknowledgement Record” and submit this form to the Project COR prior to starting project work.

2. If any asbestos-containing materials or other environmental hazards (ex. Oil filled cable or PCB materials) are unexpectedly discovered or encountered in the work area during construction, work will immediately be stopped & the Project COR will be immediately notified. Work will not continue until the COR can make an abatement determination & notifies the contractor in writing that work can be resumed.

3. Contractors are responsible for creating a Hazard Assessment and Signage Program (HASP) that will be coordinated with the environmental safety office for approval. Contractor’s HASP shall include provisions for soil & ground water testing and removal. Contractor shall not mobilize without a government approved HASP.

D. Lockout/Tagout Procedures.

1. The contractor is required to provide the proper control of hazardous energy (lockout/tagout) per OSHA 29 CFR 1910.147. All lockout/tagouts shall be coordinated with the WVA maintenance shop & the project COR.

2. The project COR shall be notified and approve all proposed lockout/tagouts prior to the contractor or sub-contractor commencing associated work.

3. The project COR shall be notified immediately prior to clearing any lockout/tagouts.

4. The Contractor shall sign and submit a “Lockout/Tagout (LOTO) Notification

Acknowledgement Record” prior to working on or de-energizing any electrical equipment.

E. PPE Requirements.

1. The contractor shall provide & comply with all OSHA specified equipment and gear that is required when working with medium (13.2 kV) and low (480V) voltage sources.

F. Contractor Safety Plan.

1. The contractor shall submit a safety plan which is specific to the work activity being performed under the scope of this project for Government review and approval.

1.08 Hours of Operation.

A. Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on select Fridays (the arsenal is closed every-other Friday). Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.

B. No work shall be conducted without pre-approval & coordination through the CONTRACTING OFFICER’s REPRESENTATIVE (COR). The Contractor and sub-contractor’s personnel shall notify the COR upon arrival at or exit from the Arsenal on a daily basis. If the Contractor’s personnel are working on-site in multiple locations, the COR shall be notified when workers are re-locating between sites. Any unscheduled/non-coordinated visits may be turned away at the Contractor’s expense & the government shall not be liable for impact to the Contractor’s overall project schedule.

1.09 Period of Performance.

A. The contractor shall be required to (i) commence work under this contract within 7 calendar days after the date the contractor receives notice to proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use not later than [60] calendar days after notice to proceed was given. The time stated for completion shall include any required fill & resurfacing of excavated duct banks and final cleanup of the premises.

1.10 Equipment Identification.

A. The contractor shall create and affix a label to all large equipment, dumpsters, and other mobilized property, which is weather-resistant (laminated, or within a see-thru label hanger), securely affixed to the equipment or visible through a window, and which clearly displays the General Contractor’s:

1. Company name

2. POC name (first, last)

3. POC phone number

4. Project Number (see title page of SOW)

1.11 Waste Dumpster (If Necessary).

A. The contractor shall place any waste dumpsters in a manner that does not interfere with thru-traffic.

B. Waste dumpsters shall be placed with a minimum of 33’ clearance from any building. The final location shall be coordinated with, and approved by the COR before any dumpsters are mobilized.

C. The contractor shall cover all waste dumpsters when not in use, and before the end of each work shift.

The cover shall be weather-tight.

D. The Contractor shall be required to retain and submit copies of all Bills of Lading and Weight Slips associated with the disposal of construction and demolition C&D debris from dumpsters when used.

1.12 Project Specifications.

A. The Contractor shall complete the Items of Work in accordance with the following associated Government Project Specification(s), attached to this SOW;

DIVISION 02 – Existing conditions

1. 02 41 00 DEMOLITION

DIVISION 26 – Electrical

2. 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

3. 26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

4. 26 05 13.00 40 MEDIUM-VOLTAGE CABLES

5. 26 05 19.10 10 INSULATED WIRE AND CABLE

6. 26 05 71.00 40 LV OVERCURRENT PROTECTIVE DEVICES

7. 26 08 00 APPARATUS INSPECTION AND TESTING

8. 26 11 16 SECONDARY UNIT SUBSTATIONS

9. 26 24 16.00 40 PANELBOARDS

10. 26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

1.13 Applicable Codes & References.

A. The following codes & standards are applicable to this Statement of Work (SOW) and are part thereof;

1. NEMA WC 70 – Power Cable Rated 2000V or Less

2. NEMA WC 74 – 5-46kV Shielded Power Cable for Use in the Transmission & Distribution of

Electrical Energy

3. NEMA 250 – Enclosures for Electrical Equipment (1000V max)

4. NETA ATS – Standard for Acceptance Testing Specifications for Electrical Power Equipment

& Systems

5. NFPA 70 – National Electric Code (NEC)

6. ANSI C12.1 – Electric Meters Code for Electric Metering

7. ANSI C37.50 – Switchgear-LV AC Power Circuit Breakers Used in Enclosures-Test

Procedures

8. IEEE 80 – Guide for Safety in AC Substation Grounding

9. IEEE 81 – Guide for Measuring Earth Resistivity, Ground Impedance & Earth Surface

Potentials of a Grounding System.

10. IEEE C2 - National Electric Safety Code

11. IEEE C37.13 – Standard for LV AC Power Circuit Breakers Used in Enclosures

12. IEEE C37.20.3 – Standard for Metal Enclosed Interrupter Switchgear

13. IEEE C37.23 – Standard for Metal Enclosed Bus

14. IEEE C37.90 – Standard for Relays & Relay Systems Associated w-Electrical Power

Apparatus

15. IEEE C37.90.1 – Standard for Surge Withstand Capability Tests for Relays & Relay Systems associated with Electric Power Apparatus

16. IEEE C37.121 – Standard for Switchgear-Unit Substations-Requirements

17. IEEE C57.12.01 – Requirements for Dry-Type Distribution Transformers

18. IEEE C57.12.91 – Std Test Code for Dry-Type Distribution Transformers

19. IEEE C57.13 – Requirements for Instrument Transformers

20. UL 467 – UL Standard for Safety Grounding and Bonding Equipment

21. UL 1072 – MV Power Cables

22. ACI 318-Building Code Requirements for Reinforced Concrete

B. The following WVA references are applicable to this Statement of Work (SOW) and are part thereof;

1. Watervliet Arsenal Instructions for Contractors (WAIC)

2. AMC Environmental Requirements Supplement

1.14 Submittals.

A. The contractor shall include a list of exceptions/clarifications with his bid proposal. This list shall be itemized by contract clause/paragraph and clearly identify each item the contractor takes exception to or wishes to expand upon. Vendor catalog information sheets shall be provided for major equipment supplied. To include, but not limited to, switchgear, cable, panels, LV transformers, conduits, pullboxes, hangars, trays & fuses.

B. The contractor shall e-mail all submittals to the Contracting Specialist for review and approval. All submittals require government approval unless otherwise explicitly stated.

C. The contractor shall reference APPENDIX A “Consolidated List of Submittals” for a complete list of required submittals. Submittals required after Notice to Proceed (NTP) shall be identified & listed in Contractor’s overall project schedule.

D. The above listed documents shall be initially submitted to the government “For Approval”. The CONTRACTING OFFICER’s REPRESENTATIVE (COR) shall then review the documents only for general conformance to the specifications and will provide written comments to the Contractor electronically. The Contractor remains responsible to ensure compliance with code and this specification, regardless of Purchaser’s comments.

E. Approved submittals shall only allow the contractor to proceed with the manufacture & installation and shall not be construed to mean that the contractor has satisfied all requirements of these specifications.

F. It is the contractor’s responsibility to be aware of all applicable codes & standards. Any rework resulting from contractor’s non-compliance with applicable codes or standards shall be at the Contractor’s expense.

G. It is the Contractor’s responsibility to ensure all submittals are issued in a timely fashion and that comments and approvals are received from the COR in time to comply with the Contractor’s planned installation schedules. In general, the Contractor should plan for two (2) weeks turn-around on approvals. Any delayed submittal reviews/approvals which may impact the overall project schedule shall be identified to the KO & COR immediately (in writing). Any subsequent relief from the contract schedule/period of performance can only be granted by the CONTRACTING OFFICER (KO), and must be requested & received in writing.

H. Where a variation/deviation from the Contract Documents exists, the contractor’s submittal clearly identify to the government any proposed changes. The associated submittal shall include a cover letter providing a list of each variation that the submittal may have from the requirements of the contract documents. In addition the Contractor shall provide specific notation on each shop drawing, sample, catalog cut, data sheet, installation manual, etc. submitted for review and approval, of each such variation. Any variation/deviation shall be resolved with the COR prior to proceeding with equipment manufacture or installation.

I. COR comments do not represent authorization to proceed on any item which has commercial implications to the contract. Contractor shall notify the CONTRACTING OFFICER (KO) with copy to COR to resolve any open commercial issues prior to release for manufacture. Release to manufacture without KO’s written approval or in place Change Order shall be at the Contractor’s own risk.

J. Contractor shall supply all Bills of Lading, Dump Slips for C&D Debris and Recycled Materials to the Environmental Office.

PART 2 PRODUCTS

2.01 General.

A. Products listed below shall be used. Any proposed substitutions shall be specifically identified and submitted with Contractor's initial bid proposal, and shall include the manufacturer's description and catalog data sheets for evaluation by the government. The government shall approve all requested substitutions in writing. Under no circumstances shall the contractor assume approval without written consent.

B. All work shall be in strict accordance with product manufacturer’s instructions and specifications, including but not limited to manufacturer guidance for storage, staging, application, installation, and disposal of the product.

C. Unless otherwise stated, all materials for this project shall be new. All products shall not contain any asbestos, mercury, chromium/lead paint, Class I Freon, and Polychlorinated Biphenyls (PCB), and shall state such on the manufacturer’s original packaging.

D. All construction materials shall meet the applicable requirements of the DoD Green Procurement Program, specifically recycled content products, environmentally preferable products and services, biobased products, energy-and water-efficient products, alternate fuel vehicles and alternative fuels, products using renewable energy, and alternatives to hazardous or toxic chemicals as found at <http://www.acq.osd.mil/dpap/cpic/cp/docs/USA001967-08-DPAP.pdf>.

2.02 Products.

A. MV Cable Termination Kits:

1. 15kV Class, 3M, Heat Shrink, QT-III, 7620-T Series (Red)

2. Color Coded buses, phase conductors and bushings

B. 13.2kV AC Cable (To be provided by WVA):

1. 15kV, 500MCM, Shielded, Copper, 133% EPR Insulation (AC Power Cable)

C. Grounding Wire

1. AWG #4/0 Station Ground Conductor

D. Cable Tags (If Necessary):

1. Phenolic type – black background with white lettering

2. Black Nylon Tie-wraps

E. Paint Color(If Necessary):

1. Exterior Color - ANSI 61

2. Interior Color – ANSI 61

PART 3 EXECUTION - ITEMS OF WORK

3.01 General.

A. The Contractor shall complete the following Work Tasks in accordance with the project scope, government specifications and local WVA specifications attached herein for performance of the Work. The project drawings and specifications do not indicate each component, item, fastener, or similar incidental item necessary for the performance of the Work. The Contractor shall provide, furnish, and install all necessary and appropriate components, items, fasteners, or similar incidental items as necessary and required to provide a complete and useable electrical substation that meets the criteria and intent outlined in this Statement of Work.

B. Contractor shall adhere to all of the specifications listed in section 1.14 & 1.15 of this Statement of Work.

C. Contractor is responsible for verifying utility locations within work area. Contractor shall submit work permit via WVA COR to initially mark expected utilities along intended construction path.

Thereafter, contractor is responsible for maintaining all markings throughout construction. If Contractor further requires utility to be confirmed by sounding equipment, then Contractor shall provide any necessary personnel or tools to do so. All sounding equipment shall be verified as calibrated prior to use.

D. Make cable entry/exit adjustments (cable, conduit, raceways, etc.) as required to reconnect cables.

E. Label, megger & test all power terminations. Test equipment and all associated metering & protections.

F. Contractor shall provide start-up and commissioning of new products following all manufacturer’s installation recommendations & utilizing factory trained technicians.

G. The following Work Tasks shall further clarify and constrain the project specifications.

3.02 Replacement

A. Contractor shall secure / cordon off work areas and identify cables.

1. Contractor is responsible for verifying utility locations. Contractor shall submit work permit via WVA COR to initially mark expected utilities along intended construction path.

Thereafter, contractor is responsible for maintaining all markings throughout construction.

Marked utilities shall also be confirmed by Contractor’s own survey using appropriate sounding equipment. All sounding equipment shall be verified as calibrated prior to use.

Unexpected utilities or underground cable that are in the area of work shall be immediately notified to the COR.

2. Suspected hazardous substances must be contained. COR shall be immediately notified if any sheen or visible oils are discovered in manholes to make an assessment prior to continuing work.

3. Where required, Government personnel will perform switching operations to ensure that power is taken out of each working manhole. This includes de-energizing and energizing. The Contractor shall not perform switching operations.

4. COR or COR’s designated representative shall be notified prior to and witness the phase checking of cables. Confirm electrical phasing at Main Substation prior to removing cables, and notify the Project COR that phasing is as expected, or that discrepancies have been found.

The use of a 15KV phase meter to check energized lines is required. Use of appropriate safety blankets and PPE is required while working on 15kV cables.

B. Contractor shall install cable.

1. The bus bars leading into the substations shall be replaced with 15kV 500MCM cable, 3 per phase.

2. Cable shall be installed within the existing bus bar enclosure, be neatly placed and supported.

Spacers or approved equivalent using insulated material shall be used to hold the cables in place, keep consistent separation and prevent cable from sitting directly on enclosure.

3. Furnish and install 15kV Power Cable, using techniques as described by the manufacturer of the cable, ensuring that the maximum pulling tension and sidewall pressure is not exceeded.

Install new 4/0 bare annealed, stranded, copper grounding conductor with MV cable runs and connect to existing grounding system with crimp and bolted connections. Install grounding bushings on MV rigid conduit as required.

a. Contractor shall provide one continuous run of cable between terminations of replacement. Ensure that manufacturer’s recommend pulling tension and side wall pressure are not exceeded.

b. The contractor shall VLF Cable Test each splice. Cable not spliced by the end of the workday shall be fitted with Raychem #ESC-6/A or equivalent heat shrink end sealing cap to ensure no water infiltration.

c. Terminate new 15kV cables with appropriate 3M/Raychem Heat Shrink termination kits & Phoenix type reusable shrouds. Color tape each phase of cable, connecting bus nearest bus insulator. Heat shrink termination kits are unnecessary if braided connections are used.

d. Field Tests: The Contractor shall perform additional Visual, Mechanical and Electrical field acceptance checks and tests as specified in UFGS 33 71 02 for MV cables.

e. Provide heat shrink splice kits which are the product of a single manufacturer. Ensure the power cable splice meets the requirements of IEEE 404 for a 15 kV rating and must be rated by the manufacturer for use on 15 kV class cable systems. Ensure splices are rated for continuous operation at 221 degrees F, with an emergency overload temperature rating of 284 degrees F. Ensure the kit is capable of splicing cables with copper conductors or accommodate a conductor size transition. Provide splices specifically designed for the cable and grounding provisions.

4. Enclosure Sealing: When installation and testing is complete, cable raceways shall be sealed with an approved sealing compound on the ends within a building or electrical enclosure.

Compound will be suitable for protecting energized live parts and preventing the ingress of rodents, insects, moisture or gases. Ensure sealing on seams of enclosure are suitable to prevent the ingress of moisture, or water.

5. COR or COR’s designated representative shall be notified prior to and witness the phase checking of cables: Re-attach terminations to switchgear only after re-verifying correct electrical phasing at the Main Substation. Notify the Project COR that phasing is as expected, or that discrepancies have been found. After obtaining witness approval, re-attach cable. The use of a 15KV phase meter to check energized lines is required.

6. Any spliced conductors shall include color tape.

C. Contractor shall have MV cable installations tested per specification 26 05 13 & UFGS 33 71 02.

Acceptance Test Report(s) shall be provided to COR for each cable. Notice for testing shall be given in advance to allow project COR and Government Personnel to witness test.

D. Contractor shall turn over all excess new material to Government. Deliver material to Building 120 loading dock or other on site location directed by COR. Government shall reserve option to claim any original material/equipment before disposal by contractor. Contractor will deliver salvaged material to on site location specified by COR.

E. Cleanup. The Contractor shall cleanup project area at the end of each work day, and at the end of project work. At the end of the project, contractor shall clean up and remove all debris, materials, tools and equipment generated or used on the project. COR shall be notified when complete and inspect for compliance prior to close-out of project. Contractor will redress any items deemed non-compliant by the COR.

3.03 Demolition.

A. Prior to commencing work, Contractor will submit lockout request. Government personnel shall isolate, de-energize and physically lock out the loop power supplying the substation prior to Contractor beginning work. Contractor shall verify all safety grounding and provide own lockout tags in addition to the government tags in order to ensure government does not clear tags without Contractor’s consent.

B. Contractor shall remove the bus between the secondary side of the transformer and the 15kV switchgear from the enclosure along with the insulating blocks, supports, brackets and terminations.

C. The contractor shall remove and discard the existing hardware, including but not limited to, the bus bar, insulating blocks, brackets and supports.

D. Contractor shall properly dispose of the removed electrical equipment in accordance with the manufacturers, environmental and electrical codes.

3.04 Commissioning & Tests

A. The contractor shall verify all electrical connections are made securely and correctly, verifying all connections with DMM or other test equipment. Once verified, the 13.2 kV power source can be restored.

B. Contractor shall provide start-up and commissioning of new products using manufacturer’s recommendations.

C. The contractor shall mechanically & electrically set up and test the entire system once reenergized, verifying all connections are correct, over-limits are set and no faults exist.

D. A copy of all commissioning tests and results shall be recorded & provided to the COR for review.

E. Once complete, the contractor shall restore power to each load, while also verifying switchgear operation is correct.

F. Contractor shall ensure that COR or COR’s representative are present to witness final electrical testing & reconnecting of all loads.

PART 4 CLOSEOUT REQUIREMENTS

4.01 Cleanup of Work Site.

A. The contactor shall clean all work areas and remove all tools, equipment, debris, materials, and all waste from the premises.

B. The contractor shall remove all debris from any remote holding locations, to include any excavation and concrete equipment chute cleanout debris.

C. The contractor shall remove their equipment from Watervliet Arsenal premises within five (5) working days after completion of project work.

4.02 Final Repairs and Restoration to Work Site. (If Necessary) A. The contractor is responsible to restore any surfaces affected by construction to their original condition. This shall include repair of any building surfaces, walkways, road surfaces, equipment or miscellaneous items which were damaged during the execution of this SOW. Items that cannot be repaired to restore original function or aesthetics shall be replaced in kind by the Contractor at no additional charge to the Government.

B. Grass, trees, and other vegetation affected by project work shall be restored to same or better condition as existed prior to the start of project work. The Contractor shall prepare the affected areas to eliminate uneven areas and low spots. Remove foreign materials, weeds, and damaged soil. The Contractor shall scratch the area to a depth of three (3) inches where topsoil is to be placed. Spread topsoil to a uniform, compacted depth of less than five (5) inches over areas to be reseeded. Rake until smooth. The Contractor shall seed, fertilize, and water the area to establish grass.

4.03 Witness Points.

A. Contractor will interrupt installation/construction to allow for the following COR witness points and inspections as part of these close out requirements;

1. Utility Tagouts

2. Cable splice inspections (all)

3. Cable Termination Inspection (prior to closing switchgear)

4. Power cable labelling & marking (prior to closing switchgear)

5. Relay Testing (all)

6. Meter Testing (all)

B. Witness points shall be clearly identified in the contractor’s master project schedule. All witness points shall be inspected prior to final closing, sealing, or buttoning-up of associated trenches, manholes or equipment.

C. Contractor shall coordinate with & obtain pre-approval for all witness points from the COR.

Contractor shall provide a minimum of 72hrs prior confirmation and notice (3x business days).

D. All witness points shall be completed prior to removing tagouts & re-energizing.

4.04 Punchlist.

A. Final 10% of entire contract will be held back pending COR approval of all witness points, commissioning, punchlist completion & Maintenance manuals. These document deliverables shall reflect the actual As-installed configuration of equipment, to include all modifications made during construction and installation.

B. Above 10% retainage…

This is the start of the file's text. The full file is on GovTribe.