This document is a solicitation for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract to provide asbestos project monitoring and air sample analysis services for Public Works Division projects at Watervliet Arsenal in New York. The contract will cover the costs of tools, materials, supplies, equipment, labor, temporary utilities, facilities, and supervision required to monitor asbestos abatement work. Delivery orders will be issued under the IDIQ as needed, with the contract having a minimum guarantee of $2,000 and a maximum value of $225,000 over the 3-year ordering period. The contract will be awarded to the lowest priced small business offer that provides required New York State asbestos certifications. The solicitation requires electronic bid submission and provides details on the Statement of Work, including air sampling requirements, project monitoring responsibilities, and closeout procedures. Offers are due by June 19, 2024.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

( No Col lect Cal ls )

W911PT24Q0083 04-Jun-2024

b. TELEPHONE NUMBER

5182664607

8. OFFER DUE DATE/LOCAL TIME

04:00 PM 19 Jun 2024

5. SOLICITATION NUM BER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

( SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t . Use Only)

23.

CODE 10. TH IS ACQUISI TION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911PT9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAM E

CHRISTOPHER BATTISTE

2. CONTRACT NO. 3 . AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLI CI TATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52. 212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRI ATION DATA

1. REQUISITION NUMBER

20.

ADDI TIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52. 212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDI NG ANY ADDITI ONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO I TEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THI S DOCUMENT AND RETURN

% FOR:SET ASI DE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ARMY CONTRACTING COMMAND-WARREN (WVA)

ATTN: CCTA-HDW /BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4050

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W911PT 16. ADMINISTERED BY

12. DI SCOUNT TERMS11. DELIVERY FOR FOB DESTI NA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLIC ITATION

RFQ IFB RFPX

ARMY CONTRACTING COMM AND- WARREN ( WVA)

SERVICES TEAM

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189- 4050

TEL: 518-266-4535 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$19,000,000

NAICS:

541620

X

OFFER DATED

29. AW ARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWI SE IDENTIFI ED ABOVE AND ON ANY

COPI ES TO ISSUI NG OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN- OWNED

SM ALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF69

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEI VED INSPECTED

32b. SIGNATURE OF AUTHORI ZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATI VE

32e. MAILI NG ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORI ZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FI NALPARTIALCOMPLETE

36. PAY MENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHI P NUMBER

PARTI AL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAY MENT

41b. SIGNATURE AND TITLE OF CERTIFYI NG OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC 'D (YY/ MM/DD) 42d. TOTAL CONTAI NERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911PT24Q0083

Section SF 30 - BLOCK 14 CONTINUATION PAGE

LOCAL NARRATIVES

.__ NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS

(a) IMPORTANT DELIVERY/QUALITY REQUIREMENTS:

(1) ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE

REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE

ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.

(2) ON A TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE

DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO

COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION

OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND

DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).

(3) PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS

IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING

PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.

(4) PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR

CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.

NOTICE: Throughout this document we may use the terms “we” and “you”, the term “we” means the government of the United States of America, and the term “you” means the contractor.

(b) WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:

“Watervliet Arsenal Information for Contractors” document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address:

http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available.”

POC - CONTRACT SPECIALIST/BUYER: Christopher Battiste

TELEPHONE NUMBER: 518-266-4607

E-MAIL ADDRESS: christopher.k.battiste.civ@army.mil

CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:

Please provide the following information for your company.

VENDOR NAME: ___________

VENDOR POC: ___________

POC PHONE: ___________

E-MAIL ADDRESS (see note below): ___________

UNIQUE ENTITY ID ___________

CAGE CODE (if known) ___________

TAX ID NUMBER ___________

VENDOR FAX NUMBER ___________

NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you.

If we experience difficulties with e-mail, it will be data faxed.

(c) AWCF BULK FUND __X__ DOES ____ DOES NOT APPLY

(d) POSTERS:

(1) Contracts for Material, Supplies, Articles and Equipment Exceeding $15,000/Service Contract Labor Standards. Orders subject to these Acts require contractors to post WH Publication 1313, “Employee Rights on Government Contracts”.

(2) Construction Orders. Orders for construction require contractors to post WH Publication 1321, “Employee Rights under the Davis Bacon” and the Office of Federal Contract Compliance poster on “Equal Employment Opportunity is the Law.”

(3) These posters can be accessed electronically at http://www.dol.gov .

(4) Hard copies of the posters will be made available upon request to the contracting officer.

(e) PAYMENTS:

Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the “my invoice” system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.

(f) RELEASE OF INFORMATION:

The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor’s responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.usapa.army.mil/pdffiles/r360_1.pdf

C._1_ Submission of Recordable Injuries and Illness Cases (Dec 2012) (ACC-Warren (WVA)) Watervliet Arsenal is pursuing OSHA Voluntary Protection Program (VPP) recognition. The VPP impacts all contractors whose employees cumulatively work more than 1000 hours per quarter within a calendar year at Watervliet Arsenal (herein referred to as “applicable contractors”).

It is the contractor’s responsibility to ensure its employees and managers are in full compliance with OSHA requirements and have a general understanding of VPP. Detailed information on VPP is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html . All contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of Watervliet Arsenal.

Applicable contractors are required to annually submit to Watervliet Arsenal, ATTN: TAWV-XO-S/Safety Office, Bldg. 10, 1 Buffington Street, Watervliet, NY 12189-4000 or email: usarmy.watervliet.tacom.list.wate-safety@mail.mil the following documents (covering the previous calendar year quarters) by 15 January:

- Total Case Incidence Rate (TCIR) - the number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.

- Days Away, Restricted, and/or Transfer Case Incident Rate (DART) - Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.

- OSHA Form 300A

Applicable contractors may submit the above immediately following the completion of a quarter, if desired.

H._1_ SERVICES/CONSTRUCTION REQUIREMENTS

(a) SCHEDULE UNIT OF MEASURE NOTE: When "LOT" is stated as a unit of measure it is the equivalent to

"JOB".

(b) WORK PERFORMED ON-SITE AT WATERVLIET ARSENAL:

The contractor agrees that each employee working at Watervliet Arsenal will sign the “Contractor Personnel Agreement on Non-Disclosure of Watervliet Arsenal Technology below. Signatures must be received by the Contract Administrator before work may begin and any resultant delay won’t be considered an excusable delay to contract performance as defined in the contract clause “Default”. Additional copies of this Non-Disclosure Statement can be found on the Internet at http://www.wva.army.mil/Documents/Contracting/nondis.pdf

(d) CONTRACTOR PERSONNEL AGREEMENT ON NON-DISCLOSURE

OF WATERVLIET ARSENAL TECHNOLOGY

(1) The Undersigned, as an employee of _________________________ (Name of Firm) agrees to the following terms and conditions.

(2) Any knowledge gained, as a result of my being permitted on Watervliet Arsenal’s premises, concerning cannon production technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside of _________________________ (Name of firm) and/or the United States of America (this prohibition includes, but is not limited to, the company’s domestic and foreign subsidiaries, affiliates, etc.), nor will such technology be used to manufacture or assist another in the manufacture of cannon (as described below) or other defense items being manufactured or developed at Watervliet Arsenal, without the written prior approval of Watervliet Arsenal.

(3) Definitions:

(a) CANNON: is defined as any and all components/parts of a complete assembly consisting of a tube, breech mechanism, tube attachments, muzzle appendages, firing mechanisms, and all integral components.

It may also be a component of a weapons system of 40mm Bore or over such as tank guns, towed and self-propelled howitzers, naval guns, mortars and recoilless guns.

(b) CANNON PRODUCTION TECHNOLOGY: is defined as the technical data package and manufacturing technology.

(1) TECHNICAL DATA PACKAGE: cannon engineering drawings, specifications and standards.

(2) MANUFACTURING TECHNOLOGY: technical knowledge, documentation, assistance and equipment and machines used and/or useful in the manufacturing of cannon.

(c) TECHNICAL KNOWLEDGE: the know how collected, trade secrets, production experience and special skills necessary for the production of cannon and the technical information and inventions necessary for the manufacture of cannon and relating to the manufacture of cannon.

(d) TECHNICAL DOCUMENTATION: manufacturing technical data comprised of drawings, specifications, schemes, composition, descriptions, methods of calculations, instructions and other information necessary for the manufacture of cannon.

(e) TECHNICAL ASSISTANCE: all assistance required to make practical and economical use of the technology required to manufacture cannon, such as delivery of documentation, training of personnel, instructions, consultations and acquainting of specialists with the most economical method of using this technology in the manufacture of cannon.

(f) EQUIPMENT AND MACHINES: production machines, machine accessories, apparatuses, spare parts and tooling used for cannon manufacture.

TYPED OR PRINTED NAME, SIGNATURE DATE

TYPED OR PRINTED NAME, SIGNATURE DATE

TYPED OR PRINTED NAME, SIGNATURE DATE

(e) JOB SITE AVAILABILITY:

The work site will be available for performance during normal business hours:

Monday through Thursday Business Hours: 7:00 a.m. EST to 4:00 p.m. EST

Friday Business Hours: Every other Friday from 7:00 a.m. EST to 3:00 p.m. EST

Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2024 to be closed is January 12, 2024.

Based on the above, service contractors should call contract/purchase order administrator in advance if service is scheduled for a Friday to determine if the Arsenal will be open for business.

When a federal holiday is normally observed on Friday, the Arsenal may be closed on the preceding Thursday. In this case, contact the contract/purchase order administrator in advance if scheduling service to determine if the Arsenal will be open for business.

Work at other than the above hours won’t be allowed unless the contractor makes an application at least 48 hours in advance and gets written contracting officer approval. No guarantee is made that the job site will be made available other than as stated above.

(f) CONTROL OF FOREIGN VISITORS TO WATERVLIET ARSENAL:

Offerors are advised that any employee or representative of their company who is not a U.S. citizen, (or is representing a foreign company) and is a U.S. citizen), planning on visiting the Watervliet Arsenal for the purpose of attending: bid conferences, bid openings, site visits, engineering services, or any other visit related to this solicitation will be escorted at all times by an arsenal representative while on the installation grounds.

Therefore, offerors must notify the Contracting Officer in advance (a minimum of two [2] weeks) of any proposed visit by a non-U.S. citizen or U.S. citizen representing a foreign firm, to assure proper clearance for entry into the arsenal. Failure to comply, or disclose a foreign national visitor, may subject the Contractor to the penalties set forth in 18 U.S.C.A. Section 1001, Chapter 14.

Due to manpower constraints, Watervliet Arsenal is often unable to provide escort services during contract performance. Therefore, if the resulting contract requires performance on Watervliet Arsenal property, employees, individuals or subcontractors representing the successful offeror who are not U.S. citizens may not, depending on staffing levels and the availability of escorts, be allowed access to the Arsenal for purpose of contract performance.

Be further advised that the inability of the Arsenal to provide escorts resulting in denial of access to Watervliet Arsenal of the aforementioned personnel will not be considered an excusable delay to contract performance as defined in the contract clause “Default” contained in the contract. Therefore, offerors should consider the above contingencies during offer preparation.

(h) CONTRACTOR IDENTIFICATION:

Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence, and when working in situations where their actions could be construed as official government acts.

A.__ Electronic Contracting Electronic Bids/Proposals/Commercial Offers Required in Response to this Solicitation (June 2020) ACC-WVA

(a) All Army Contracting Command – Watervliet Arsenal (WVA) solicitations will be publicized on the SAM.gov website (https://sam.gov /). Any additional attachments, including Technical Data Packages, when available electronically, will be separate attachments or links embedded in the solicitation.

(b) Bids/Proposals must be submitted in electronic media. When submitting your bid/proposal electronically, the bid/proposal and any supplemental information (such as spreadsheets, backup data, technical information), can be submitted using any of the following electronic formats:

(1) Microsoft* Office Products (Watervliet can read Microsoft* Office 2007 and lower); Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.

(2) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.

(3) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic bid/offer and be accessible offline.

(4) Other electronic formats are not acceptable.

(c) Please select only one medium by which to transmit each bid/proposal.

(d) Timely receipt of offers/proposals:

(1) Your attention is called to the solicitation closing date and time on the solicitation is local time for the Army Contracting Command – Watervliet Arsenal (WVA). Lateness rules for electronic submissions for bids are outlined in FAR 52.214-7, “Late Submissions, Modifications, and Withdrawal of Bids,” for proposals in FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition” or FAR 52.212-1, “Instructions to Offerors-Commercial Items.” Pay particular attention to the applicable clause as it relates to the timing of submissions.

(2) NOTE: There is no “expected” or “target” length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned to submit their proposals allowing adequate time for submission.

(3) Solicitations may remain posted on the SAM.gov website after the solicitation closes. Even though the system may allow you to submit a proposal after the closing date/time, your proposal will be considered late and may not be considered for award.

(e) Security Note: If you choose to password-protect access to your bid/offer, you must provide the password to Watervliet Arsenal at least ten days prior to the opening/closing date. Contact the buyer identified in “Watervliet

Arsenal Information/Requirements”. Passwords used only for the purpose of write protecting files need not be provided.

(f) Electronic bids/proposals must include, as minimum:

(1) E-mailed bids/proposals must include a signed SF 33 cover sheet, SF 1449 or SF 1442 (whichever is applicable) that can be scanned. If scanned, attach it to your e-mail offer (or first e-mail message if you are sending multiple e-mails due to length).

(2) All applicable fill-in provisions. For solicitations issued on an SF 33 or SF 1442, this would include Sections A, B, F, and K. For solicitations issued on an SF 1449, you must review the solicitation to ascertain where all of the required fill-ins are located since commercial acquisitions do not have designated sections.

(3) A statement of agreement to all the terms, conditions, and provisions of the solicitation.

(4) Any other information required by the solicitation.

(g) Please see FAR 14.406 for a description of the steps the Government shall take with regard to unreadable electronic bids received via the media described in paragraphs (b) above. See FAR 15.207(c) for a description of steps the government shall take with regard to unreadable proposals.

(h) Bidders/Offerors shall make every effort to ensure that their bid/proposal is virus-free. Bids/proposals (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as “unreadable” per paragraph (h) above. Use of any formats other than those listed above may result in the file being quarantined and will be considered by Watervliet Arsenal to be “unreadable” files.

Note (Macros): The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an email message or an email attachment may cause the email bid/offer to be quarantined. In that event paragraph (g) above applies.

*Registered trademark

C.__ REQUEST FOR QUOTE RESPONSES

ALL RESPONSES MUST BE ELECTRONIC. YOU MUST SUBMIT YOUR QUOTE RESPONSES USING

THE FOLLOWING METHODS:

(a) Email to: christopher.k.battiste.civ@army.mil

(b) Request for Quotes must be filled out completely and sent in its entirety to be considered responsive.

A.__ ALL OR NONE-COMMERCIAL ITEM ACQUISITION

(a) This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS. Paragraph (h) is modified to say that the proposal or quote must offer to provide the total quantity of the items in this solicitation.

(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

FOR

Asbestos Abatement Project Monitoring IDIQ

AT

Watervliet Arsenal

Project #: 24PW025 Installation Management, Public Works Division

Facilities Engineering (TAWV-IMP-F)

PART 1 GENERAL

1.1 SUMMARY OF WORK

1.1.1 Project Description

a. The Watervliet Arsenal facilities contain asbestos containing materials (ACM). Work that disturbs ACM must be accomplished in accordance with relevant federal, state, and local laws, rules, regulations, and guidance. One requirement of these mandatory laws, rules and regulations is to have a certified Project Monitor on-site during all asbestos abatement work. The Watervliet Arsenal has chosen to comply with this requirement by using contractor personnel as asbestos abatement Project Monitors.

As the asbestos abatement Project Monitor, the contractor will represent the Watervliet Arsenal to ensure each asbestos abatement project is accomplished in accordance with its asbestos abatement work plan, and with the guidance provided within the scope of this SOW, along with all federal, state, and local laws, rules, regulations, and guidance.

A separate delivery order will be provided for each asbestos monitoring project, and quotes will be requested prior to placing a delivery order.

1.1.2 Location of Work

a. The work can occur at various locations on the Watervliet Arsenal where there is an abatement project. The exact location will be shown by the Contracting Office Representative (COR).

1.1.3 Period of Performance

a. The contractor shall be required to (i) commence work under this contract within 7 calendar days after the date the contractor receives notice to proceed, (ii) prosecute the work diligently, and (iii) the duration of the contract shall be three (3) calendar years.

1.1.4 Hours of Operation

a. Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on Fridays. Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.

1.2 SUBMITTALS

1.2.1 General Submittal Requirements

a. The contractor shall provide submittal documents via e-mail to the Contracting Officer for review and approval. Provide all physical (non-document) submittals (including but not limited to material swatches, samples, etc.) directly to the Contracting Officer for review and approval. All submittals require government approval unless otherwise explicitly stated.

b. The contractor shall reference APPENDIX A “Consolidated List of Submittals” for the complete list of required submittals.

1.2.2 Contractor Safety Plan

a. The contractor shall submit a safety plan that is specific to the work activity being performed under the scope of this project for Government review and approval.

1.2.3 Lockout / Tagout (LOTO) Acknowledgement

a. The Contractor shall sign and submit a “Lockout/Tagout (LOTO) Notification Acknowledgement Record” prior to working on or de-energizing any electrical equipment.

1.2.4 Asbestos Notification Acknowledgement Record

a. The contractor shall sign the “Asbestos Notification Acknowledgement Record” and submit this form to the Project COR prior to starting project work.

1.2.5 Project Schedule

a. The contractor shall create a project schedule and submit for Government review and approval.

b. The project schedule shall detail the phases of work and the overall timeline for the execution of the work. The contractor shall include delivery dates, appropriate milestones, and shall clearly detail any requirements for work performed outside of regular hours of operation.

1.3 GENERAL REQUIREMENTS

1.3.1 Watervliet Arsenal Information for Contractors (WAIC)

a. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publically available at:

<http://www.wva.army.mil/Documents/Contracting/WAIC.pdf>

1.3.2 General Requirements

a. The asbestos project-monitoring contractor shall be independent of, and not affiliated with, the asbestos abatement contractor.

b. Each project will have its own Asbestos Abatement Work Plan (AAWP) that will be implemented by an asbestos abatement contractor. It is expected that all phases of asbestos abatement work will be performed in accordance with the AAWP by the asbestos abatement contractor, and it shall be the responsibility of the asbestos project monitor, under the scope of this SOW, to ensure the abatement contractor is performing the work properly and in accordance with the associated AAWP.

c. The AAWP, the requirements of this SOW, and the expected level of effort and performance of the asbestos abatement monitor contractor shall be in full accordance with the following regulations, guidance, and applicable documents as follows:

i. Occupational Safety and Health Administration (OSHA) Title 29 Code of Federal regulations (CFR) Part 1910.1001 - Asbestos, General Industry Standard.

ii. OSHA Title 29 CFR Part 1926.1101 – Asbestos, Construction Standard.

iii. United States Environmental Protection Agency (US EPA) Title 40 CFR Part 763 -

Worker Protection Rule, Asbestos-In-Schools Rule, Asbestos Hazard Emergency Response Act (AHERA), AHERA- Model Accreditation Plan, and Asbestos Ban and Phase Down Rule.

iv. US EPA Tile 40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants (NESHAP).

v. OSHA Title 29 CFR Part 1910.134 - Respiratory Protection Standard.

vi. Other sections of OSHA Title 29 CFR 1910 (Occupational Safety and Health) and

OSHA Title 29 CFR 1926 (Safety and Health Regulations for Construction) that are applicable to this project.

vii. New York State Department of Labor Title 12 New York Code Rules, and Regulations (NYCRR) Industrial Code Rule 56 - Asbestos.

viii. Applicable Army regulations and Watervliet Arsenal policy memos.

d. All contractors are responsible for complying with DOD, Army, Federal, and State Health and

Safety requirements. The contractor shall notify the Project COR a minimum of two (2) business days before the contractor starts or re-starts work, and a minimum of seven (7) business days before the shut-down of a utility or building service. All work shall be in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor is required to read and understand this document prior to submitting the project proposal. These instructions are publically available at <http://www.wva.army.mil/Documents/Contracting/WAIC.pdf>. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for a complete and appropriate execution of the contract documents and requirements of this SOW.

Use all means and precautions necessary to insure the safety of the occupants and protection to the existing buildings and structures.

e. When entering a regulated work area, all asbestos project monitoring workers and all authorized visitors shall wear, at a minimum, the following personal protective equipment (PPE): coveralls, head coverings, foot coverings, safety glasses, gloves, and a half-face respirator with High Efficiency Particulate Air (HEPA) filter capable of trapping 99.97% of asbestos fibers greater than

0.3 microns.

1.3.3 Award Criteria

a. The contract will be awarded to the lowest project price provided by a small business who also provides a current New York State (NYS) Department of Labor (DOL) Asbestos Handler

Certificate. Contractor shall have an employee designated to work with WVA who holds at minimum a current:

i. NYS DOL Asbestos Handler Certificate.

ii. NYS DOL Asbestos Project Air Sampling Technician Certificate.

iii. NYS DOL Inspector Certificate

iv. NYS DOL Project Monitor Certificate

v. Dept. of Health Certificate of Asbestos Safety Training

vi. Medical Clearance Report

vii. Health & Safety Report/FIT test

viii. NYS Asbestos Certification

b. The contractor shall have the designated employee available to report to WVA within 24 hours after notice is given for emergency purposes.

1.3.4 Licensing, Notification and Documentation

a. All contractor employees engaged in this asbestos project-monitoring project shall possess a valid training certificate issued from the New York State (NYS) Department of Health (DOH-2832) and a valid Asbestos Certificate (Hard Card) as a Project Monitor and Inspector issued by the NYS Commissioner of Labor per Title 12 New York Code, Rules and Regulations (NYCRR) Part 56.

Contractor employees shall carry the asbestos certificate at all times while working on each and every project.

b. Contractor personnel whose duties are to perform and/or collect air samples in this asbestos project monitoring project shall possess a valid training certificate issued from the NYS Department of Health (DOH-2832) and a valid Asbestos Certificate (Hard Card) as an Asbestos Project Air Sampling Technician issued by the NYS Commissioner of Labor per Title 12 New York Code, Rules and Regulations (NYCRR) Part 56. Contractor employees shall carry the certificate at all times while working on each and every project.

c. The contractor shall submit for analysis air-monitoring samples to a laboratory that is independent of and not affiliated with the asbestos project-monitoring contractor and is independent of and not affiliated with the asbestos abatement contractor. The laboratory shall be accredited by the American Industrial Hygiene Association (AIHA) or by the NYS Department of Health for the selected methodology of sampling and analysis of asbestos.

d. The contractor shall ensure that all employees engaged in this asbestos abatement-monitoring project are physically able to perform the work and use the required health and safety equipment.

This determination shall be made under the supervision of a physician.

e. The contractor shall ensure that all employees engaged in this asbestos abatement monitoring project pass an appropriate respirator fit test with the same make, model, style and size of respirator that will be used during the project and receive respirator training.

f. The contractor shall provide the following documentation to the Watervliet Arsenal (WVA) Contracting Officer prior to award of each delivery order under this contract

i. Copies of the employee’s training certificates and asbestos certificates (see paragraphs “A” and “B” above).

ii. Copy of the laboratories’ accreditation certificate for air sampling asbestos analysis (see paragraph “C” above).

iii. Copies of the contractor's physician written opinion per paragraph "m" of OSHA 29 CFR 1926.1101 for each employee. This opinion shall include but not limited to any recommended limitations on the use of personal protective equipment such as respirators. If no limitations are recommended, the opinion shall state that there are no limitations on the use of personal protective equipment such as respirators. Note that the written opinion must not reveal specific findings or diagnoses unrelated to occupational exposure to asbestos (see paragraph “D” above).

iv. Copies of contractor's respirator fit test results per paragraph "f" of OSHA 29 CFR

1910.134 for each employee. The test results shall, at minimum, indicate the following:

type of fit test method, whether or not the employee passed or failed the test, as well as, the make, model, style and size of the respirator (see paragraph “E” above).

1.3.5 Performance Requirements

a. Quality Assurance Surveillance Plan (QASP). The QASP is the management tool for documenting site surveillance conducted on contractors, contractor performance evaluation, and reporting of contractor performance. The Contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standard area achieved. The Government will use the QASP when evaluating Contractor performance, attached.

b. Performance Assessment Plan.

JOB ELEMENT STANDARD REMEDY

Air Sampling/Personal Air Sampling

IAW 12NYCRR56 Late – Deduct $25 per occurrence Not performed - Deduct $250 per occurrence

Site Inspection IAW 12NYCRR56 Deduct $250 per occurrence not performed

Report any discrepancies to contracting officer

IAW SOW (3.1.1 a) Deduct $250 per occurrence not performed

Final Clearance & Report IAW 12NYCRR56 and SOW (3.1.2 b)

Deduct $250 per occurrence not performed

i. The Contracting Officer’s Representative (COR) will track contractor performance to the standards and monitor the timeliness of submissions. Discrepancies will be reported to the Contracting Officer for contractual remedy. Contractor will be notified by the Contracting Officer when remedies will be assessed and deductions will be taken from the contract invoice

1.3.6 Submittals

a. Three (3) copies of each submittal shall be delivered to the Contracting Officer for the

Determination of Acceptance. The Project COR will provide a Determination of Acceptance of a submittal within fourteen (14) days from the date it was physically delivered. One (1) copy will be returned to the contractor. Following is a consolidated list of submittals. Submit the following:

i. Employees’ training certificates.

ii. Employees’ asbestos certificates.

iii. Laboratories’ accreditation certificate for air sampling asbestos analysis.

iv. Employees’ physician written opinion.

v. Employees’ respirator fit test results.

vi. Material Safety Data Sheets for each hazardous material used.

vii. Personal and General air-sampling results.

viii. Asbestos abatement contractor discrepancy notifications (if necessary).

ix. Project satisfactorily completed determination.

x. Monitoring project final report.

1.3.7 Utility Outage Requests and Utility Connection Requests

a. Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect existing systems, coordinate schedule with COR. Schedule utility outages and connections to minimize disruptions to the Government. No additional payment will be provided for utility outages and connections required to be performed outside the regular work hours.

b. The contractor shall notify the Contracting Specialist a minimum of two (2) business days before the contractor starts work. The contractor shall notify the COR a minimum of seven (7) business days before the shut-down of a utility or building service.

1.3.8 Safety Requirements

a. The contractor is required to provide the proper control of hazardous energy (lockout/tagout) per

OSHA 29 CFR 1910.147.

b. The contractor shall inspect the project work site prior to starting work, and shall request a copy of the asbestos building inspection records to verify the location and description of known asbestos-containing materials.

1.4 ON-SITE PERMITS

1.4.1 Excavation (Dig Permit)

a. The clearance of buried utilities will be performed by the Government in advance of the Contractor performing subsurface work, unless otherwise explicitly stated.

b. The Contractor shall obtain a copy of the completed Utility Clearance Permit (WVA Form 420-2-E) from the COR prior to performing subsurface work. Verify existing utility locations indicated on contract drawings, within area of work.

1.4.2 Hot Work and Confined Space

a. Obtain permit for welding, burning, use of flame, or entry into confined space from WVA Fire

Department by calling (518)266-5990 each day the permit is to be used.

1.5 APPLICABLE DOCUMENTS

1.5.1 References

a. The following references accompany this Statement of Work and are a part thereof.

i. Watervliet Arsenal Instructions for Contractors (WAIC).

ii. NFPA 70 – National Electric Code (NEC).

1.6 CONTRACTOR EQUIPMENT

1.6.1 Equipment Identification

a. The contractor shall create and affix a label to all large equipment, dumpsters, and other mobilized property, which is weather-resistant (laminated, or within a see-thru label hanger), securely affixed to the equipment or visible through a window, and which clearly displays the General Contractor’s:

i. Company Name, POC Name (first, last), POC phone number, Project Number.

1.6.2 Waste Dumpster

a. The contractor shall place any waste dumpsters in a manner that does not interfere with thru-traffic.

b. Place waste dumpsters with a minimum of 33’ clearance from any building. The final location shall be coordinated with, and approved by the COR before any dumpsters are mobilized.

c. Cover all waste dumpsters when not in use, and before the end of each work shift. The cover shall be weather-tight.

d. The Contractor shall submit all Bills of Lading and Weight Slips associated with the disposal of all construction and demolition (C&D) debris to the Contracting Officer on a monthly basis. The contractor shall provide this information within ten (10) days of disposal of the waste.

PART 2 PRODUCTS

2.1 GENERAL

All work shall be in strict accordance with product manufacturer’s instructions and specifications, including but not limited to manufacturer guidance for storage, staging, application, installation, and disposal of the product.

2.1.1 Hazardous Materials

a. The contractor shall submit Safety Data Sheets (SDS) for all hazardous materials to be used.

2.1.2 Asbestos, Mercury, Lead, PCB

a. Unless otherwise stated, all materials for this project shall be new. All products shall not contain any asbestos, mercury, chromium/lead paint, Class I Freon, and Polychlorinated Biphenyls (PCB), and shall state such on the manufacturer’s original packaging.

2.1.3 DoD Green Procurement Program

a. All construction materials shall meet the applicable requirements of the DoD Green Procurement

Program, specifically recycled content products, environmentally preferable products and services, biobased products, energy-and water-efficient products, alternate fuel vehicles and alternative fuels, products using renewable energy, and alternatives to hazardous or toxic chemicals as found at <http://www.acq.osd.mil/dpap/cpic/cp/docs/USA001967-08-DPAP.pdf>.

2.1.4 Paint

a. To meet the Affirmative Procurement Program (Federal Government’s Buy Recycled Requirements) all paint used in the project shall adhere to the below listed requirements of the Comprehensive Procurement Guideline for recovered materials. This applies only to interior latex paint, only if available at the time of the project.

i. Reprocessed Latex Paint (White, Off-White, Pastel Colors) shall contain 20% Post consumer content.

ii. Reprocessed Latex Paint (Grey, Brown Earth tones, and Other Dark Colors) shall contain 50-99% Post consumer content.

iii. Consolidated Latex Paint shall contain 100% Post consumer content.

PART 3 EXECUTION

3.1 ITEMS OF WORK

3.1.1 General

a. The contractor is required to review the asbestos abatement work plan for each project, to include all its attachments, visit the project site, and obtain and/or verify all measurements and project data/information required to perform this asbestos project monitoring work prior to submitting a quote. In addition, the contractor is required to review all Project Monitoring contract documents, and provide written notice to the Contracting Officer of any discrepancies that are found.

3.1.2 Air Sampling

a. All personal breathing zone air sampling/monitoring shall be performed IAW Title 12 NYCRR Part

56. The asbestos abatement contractor will perform personal breathing zone air sampling on all his/her contractor personnel and provide the personal breathing zone air samples to the Project Monitor. The Project Monitor shall collect the personal breathing zone air samples, have them analyzed, and report the results directly to the WVA Contracting Officer with copies provided to the abatement contractor. Submit the samples to the accredited laboratory for analysis and provide written results of the analysis to the WVA COR within 72 hours of sample collection. The Project Monitor shall ensure proper chain of custody records for all sampling performed. OSHA required personal breathing zone air sampling for all employees is required during all active phases of abatement activity to assess compliance with both the 8-hour time weighted average (TWA) and 30 minute short-term exposure limits.

b. The Project Monitor shall perform all required background air sampling (prior to start of project), pre-abatement air sampling (area preparation), abatement air sampling (work in progress), and post-abatement (clearance) air sampling. The general air sampling shall be performed IAW Title 12 NYCRR Part 56. Sample analysis shall be performed using Phase Contrast Microscopy (PCM) using NIOSH 7400 methodology. If Transmission Electron Microscopy (TEM) is required, i.e., where the use of PCM has resulted in fiber counts that exceed the air clearance levels acceptable under Title 12 NYCRR Part 56, TEM may be utilized to obtain a more accurate asbestos fiber count as directed by the Contracting Officer or COR. Where such election is made, both the PCM and TEM results must be made available to the WVA COR. The analysis shall be performed in accordance with the procedures described in 40 CFR Part 763, Appendix A to Subpart E. The Project Monitor shall collect the general air sampling samples, have them analyzed by the accredited laboratory, and shall verbally report the results directly to the WVA Contracting Officer as soon as the results are available, typically less than 24 hours after the sample was submitted to the laboratory. Final written reports are due to the WVA COR within 72 hours of sample collection, with copies provided to the abatement contractor. The Project Monitor shall ensure proper chain of custody records for all sampling performed.

c. In the event that air monitoring results show an airborne fiber concentration which exceeds 0.01 fibers/cubic centimeter (f/cc) or the background level, whichever is greater, the Project Monitor will inform the asbestos abatement contractor and shall notify the WVA COR, to include recommended corrective actions. The notification to the WVA COR shall occur at the same time the sampling results are provided (i.e.: within 24 hours of sample collection). The Watervliet Arsenal will direct the abatement contractor to implement corrective actions. The Project Monitor shall immediately notify the WVA COR if the abatement contractor does not immediately implement the corrective actions.

3.1.3 Requirements and Authority.

a. The Project Monitor shall closely coordinate work schedules directly with the asbestos abatement contractor in order to be on-site whenever the asbestos abatement contractor is performing asbestos abatement work, including project mobilization and demobilization. The Project Monitor shall be present whenever the asbestos abatement performs abatement work activity.

b. The Project Monitor represents the Watervliet Arsenal on-site and has the authority to stop work in the event of safety hazard that would possibly cause immediate injury to personnel, damage to the facility, and/or in the event of an uncontrolled asbestos fiber release. The Project Monitor shall also monitor the asbestos abatement contractor for standard (non-asbestos abatement) construction safety requirements inside the abatement work zone. The Project Monitor shall inform the WVA COR and Contracting Officer immediately in the event that work stoppage is directed.

c. The Project Monitor shall monitor the asbestos abatement contractor to assure any asbestos abatement work is performed in accordance with the asbestos abatement work plan and applicable OSHA, EPA, NYS and Watervliet Arsenal laws, rules, regulations and guidance. Immediately inform, but do not direct, the abatement contractor of any discrepancies in meeting the asbestos abatement work plan or the other applicable guidance requirements. Then, immediately notify the WVA COR of the discrepancy and the WVA COR will work with the Watervliet Arsenal Contracting Officer to direct the abatement contractor to correct the discrepancy. Note: these possible discrepancies include both operational procedures and the required documentation of the asbestos abatement contractor.

d. The Project Monitor shall remain in daily contact with the WVA COR in order to keep the Watervliet Arsenal advised of the progress of the asbestos abatement and to receive instructions as necessary. Attend all meetings between the Watervliet Arsenal and the asbestos abatement project contractor to include pre-construction, construction/progress and post-construction. Provide Project Monitor related information and recommendations at these meetings.

e. The Project Monitor shall prepare and maintain a daily log of all on-site asbestos abatement activities to include number of workers, description and quantity of work performed, hours worked, weather conditions, visitors to the site, unusual events, inspections performed, air samples taken, air sample analysis results received, photograph documentation (if taken) and any other appropriate and pertinent information. Provide the original version of these logs to the Watervliet Arsenal with the project’s final report. The Project Monitor shall keep a copy of the daily logs that shall be maintained as required by state and federal regulations.

f. The asbestos abatement project shall be deemed satisfactorily completed when the requirements of the project’s asbestos abatement work plan has been met and, when clearance air sampling is part of the work plan’s requirements, the post-abatement air sampling results are below 0.01 fibers of asbestos per cubic centimeter, or the background level, whichever is greater. The asbestos abatement contractor shall notify the Watervliet Arsenal Contracting Officer’s Representative (COR) and the Project Monitor for a post-abatement inspection. The Project Monitor shall inspect the abatement work area and either concur or non-concur that the abatement contractor has met the requirements of the asbestos abatement work plan.

i. If the Project Monitor approves that the asbestos has been properly abated then a Watervliet Arsenal representative and the Project Monitor shall inspect the abatement work area for asbestos containing materials.

1. If the Watervliet Arsenal concurs with the Project Monitor’s approval the Watervliet Arsenal will notify the asbestos abatement contractor has met the requirements of the asbestos abatement work plan. The Project Monitor shall provide the CO with a written and signed statement that the abatement contractor has met the requirements of the asbestos abatement work plan, to include clearance air sampling if part of the abatement requirements.

2. If the Watervliet Arsenal non-concurs with the Project Monitor’s approval the CO, with the assistance of the COR, will direct the abatement contractor to perform corrective actions.

ii. If the Project Monitor disapproves that the asbestos has been properly abated, and/or that the requirements of the asbestos abatement work plan have not been met, then the

Project Monitor shall inform the abatement contractor and the COR of the disapproval, the reason for disapproval, and the recommended corrective actions. The CO, with the assistance of the COR, will direct the abatement contractor to perform corrective actions.

3.1.4 Supplemental Bulk Sampling

a. When already on-site for the performance of Air Sampling and Project Monitoring duties under the requirements of this SOW, the Project Monitor shall also be available to provide bulk sampling services to WVA. Bulk sampling services shall include:

i. Responding to a request for sampling of a specific material, and coordinating the request with the project COR.

ii. Responding to a request for sampling of a specific material, and coordinating the request with the project COR.

iii. Collecting samples and verifying the collected samples are from the specified locations.

iv. Labeling the…