About this file

This modification amends a solicitation for inspection, maintenance, and repair services for cranes and lifting devices at Watervliet Arsenal. The solicitation seeks these services for an initial base year and two option years and involves approximately 2,065 cranes, jibs, pedestals, gantries, and underhung monorails. Inspections will include annual certifications and monthly checks spread over a twelve month period and located across 20 buildings at the facility. Offerors must be small businesses and proposals are due by November 21st, 2022. The awarded firm will provide inspections, maintenance, and minor repairs for material handling equipment on site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16H1F224401GK

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is issued for the correction of formatting on tables.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Nov-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911PT23Q0004

X 9B. DATED (SEE ITEM 11)

07-Nov-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Nov-2022

CODE

ARMY CONTRACTING COMMAND-WARREN (WVA)

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

W911PT 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X

W911PT23Q0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

LINE ITEM 0001 PRICE SHEET

Price for Inspections (Base Year):

Item Quantity Price per Unit Up to 1 Ton JIB w/ Hoist 49 Up to 1 Ton JIB Pedestal w/ Hoist 38 2 Ton JIB Pedestal w/ Hoist 2 2 ton Gantry w/ Hoist 4 1 ton Single Girder underhung monorail w/ Hoist

Up to 2 Ton crane 70 3 Ton Crane 3 5 Ton Crane 16 10 Ton Crane 47 30 Ton Crane 15

60 – 200 Ton Cranes 4 Wire Rope Slings 600 Lifting Spreader Beams 8 Chain Sling 50 Metal Mesh Sling 1 Synthetic Web Sling 900 Synthetic and Natural Fiber Rope Sling

Fall Protection Harness 50 Lanyard – Non-retractable 89 Lanyard – Retractable 25 Price to destroy fiber sling or other nylon device

Price to destroy metal sling 10

TOTAL PRICE FOR BASE YEAR

Price for Inspections (Option Year 1):

Up to 1 Ton JIB Pedestal w/ Hoist 38 2 Ton JIB Pedestal w/ Hoist 2 2 ton Gantry w/ Hoist 4 1 ton Single Girder underhung monorail w/ Hoist

Up to 2 Ton crane 70 3 Ton Crane 3 5 Ton Crane 16 10 Ton Crane 47 30 Ton Crane 15

60 – 200 Ton Cranes 4 Wire Rope Slings 600 Lifting Spreader Beams 8 Chain Sling 50 Metal Mesh Sling 1 Synthetic Web Sling 900 Synthetic and Natural Fiber Rope Sling

Fall Protection Harness 50 Lanyard – Non-retractable 89 Lanyard – Retractable 25 Price to destroy fiber sling or other nylon device

TOTAL PRICE FOR Option Year

Price for Inspections (Option Year 2):

The following have been deleted:

LINE ITEM 0002 PRICE

SHEET

LINE ITEM 0003 PRICE

SHEET

(End of Summary of Changes)

Up to 1 Ton JIB Pedestal w/ Hoist 38 2 Ton JIB Pedestal w/ Hoist 2 2 ton Gantry w/ Hoist 4 1 ton Single Girder underhung monorail w/ Hoist

Up to 2 Ton crane 70 3 Ton Crane 3 5 Ton Crane 16 10 Ton Crane 47 30 Ton Crane 15

60 – 200 Ton Cranes 4 Wire Rope Slings 600 Lifting Spreader Beams 8 Chain Sling 50 Metal Mesh Sling 1 Synthetic Web Sling 900 Synthetic and Natural Fiber Rope Sling

Fall Protection Harness 50 Lanyard – Non-retractable 89 Lanyard – Retractable 25 Price to destroy fiber sling or other nylon device

TOTAL PRICE FOR Option Year

File details come from the government source that posted it. Updated .