Question and Answer 11-1-2022.docx
DOCX document 16 KB Posted
- Attached to
- New Draw Batch Oven for the Watervliet Arsenal
- Solicitation number
- W911PT22Q0067
About this file
This document contains questions and answers related to a solicitation for a new draw batch oven for the Watervliet Arsenal. The solicitation seeks one electrically heated standard draw batch oven or equal, per the provided specification. It includes options for additional furnaces. The questions and answers provide clarification on material requirements, temperature ranges, warranty periods, facility dimensions such as doorway and aisle sizes, distance for rigging the oven, whether loads will be processed from room temperature or require preheating, and available space for installation. However, the answers note that space and location details may change before final installation. No further product or service requirements, pricing terms, or agency information is included beyond what is stated in the solicitation description.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answer 11-1-2022
W911PT22Q0067
Draw Batch Oven
Q1.) We are assuming that you will use the furnace to process steel since the solicitation mentions stress relieving and hydrogen embrittlement relief. Can you please confirm what material is being treated?
A1.) Typically, 40xx steel
Q2.) The solicitation also mentions that that the low end of the qualified temperature range is 200°F. That is very low for a furnace that will also be used at up to 1250°F. Can you please confirm the minimum temperature requirement?
A2.) 200F is our minimum required temperature required
Q3.) Paragraph 7.7 of Amendment 0001 states both a 3-year warranty period and a 2-year warranty period. Can you please tell me which warranty period is required?
A3.) A 3-year warranty is required
Q4.) Can you please provide the dimensions (width and height) of the doorway that the furnaces will need to travel through when entering the facility?
A4.) The door is about 12’ wide and 11’ tall
Q5.) Can you please provide the minimum dimensions (width and height) of the aisles that the furnaces must be rigged through the facility?
A5.) The smallest aisle is about 7’2” wide
Q6.) If there are other size restrictions within your facility, can you please define those restrictions?
A6.) WVA will not define any additional size requirements at this time
Q7.) Can you please define the distance that the furnaces must be rigged from the entrance doorway to the location where they will be installed?
A7.) About 250 feet south and 85 feet east – however, the riggers will determine final route
Q8.) Can you also please define whether loads be placed in furnaces that are at room temperature or preheated?
A8.) Most loads are processed from room temperature
Q9.) Can you please define your heat up rate requirements (time to heat a 2000 lb. load to 1250F)?
A9.) No heat up rate requirements will be defined at this time
Q10.) Please define any additional heat up rate requirements that you may have.
A10.) No additional heat up rate requirements will be defined at this time
Q11. Please provide the available space of the areas where the furnaces will be installed (length, width, and height).
A11.) The maximum height of the machine is 14’6” - no further space requirements will be provided
*** Please note that WVA may change the answers to questions related to space and location of the machine (4 ,5, 6, 7, and 11). The placement of the machine is not finalized and may be changed before final installation. ***