W911PT-21-R-0012 QA FORUM.docx
DOCX document 15 KB Posted
- Attached to
- Combined Synopsis and Solicitation for a new Magnetic Particle Inspection Booth Gould Bass 3509A-01 or equal
- Solicitation number
- W911PT-21-R-0012
About this file
This document contains a question and answer log for solicitation W911PT-21-R-0012 regarding the procurement of a magnetic particle inspection booth. The solicitation is for one Magnetic Particle Inspection Booth Gould Bass 3509A-01 or equal for Watervliet Arsenal in Watervliet, NY, with an option for one additional booth. Questions were accepted until 11 August 2021. The log addresses questions on receiving a drum of carrier and boxed accessories separately from the equipment, as well as temporarily storing an uncrated booth on-site for up to two weeks until installation. The Department of the Army Materiel Command TACOM Life Cycle Management Command is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 001-W911PT-21-R-0012.pdf | ||
| W911PT-21-R-0012.pdf | ||
| Comply Sheets Mag Particle Booth specification 14-21-6625.xlsx | XLSX spreadsheet | |
| W911PT-21-R-0012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WVA Magnetic Particle Inspection Booth
W911PT-21-R-0012
Question & Answer Log
Questions will not be accepted, nor answered, on Solicitation W911PT-21-R-0012 after 11-AUG-2021, 12:00 PM EST.
| Document |
| Document Reference |
| Question/Comments |
| Answer/Response |
| Date Received |
| Date Posted |
Solicitation
| Can Watervliet receive the drum of Carrier & boxed accessories through WVA receiving and not with the equipment? Also I want to confirm that you do not need a drum pump for the oil. Typically companies prefer a specific type of pump for their operations. |
| The drum of Carrier and accessories can be sent to the standard WVA receiving department, WVA does not need a drum pump. |
| 7/30/21 |
Solicitation
| Per your contract I need to be on-site for the delivery and placement of the equipment. I am working with (2) riggers and there is a question as to whether WVA can hold the equipment on-site until I arrive to see its uncrating and placement. My question is can my riggers unload the crated equipment at WVA, then return with me when I am available to uncrate it and put in place. I would like to store it there for no longer than 2 weeks. |
| WVA prefers to have the delivery and installation occur at the same time. However, if needed WVA can accommodate a separate timeframe for delivery and installation, as long as the Government is given the dimensions for the container in advance. |
| 08/02/21 |
Solicitation
Solicitation
Solicitation
Solicitation
Solicitation
Solicitation
Solicitation
Solicitation
Solicitation
Solicitation
File details come from the government source that posted it. Updated .