Draft WVA Specification Package for one 6-Axis CNC Broach Grinding Machine.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U. S. Army Watervliet Arsenal Watervliet, NY Equip Engr Spec #17-18-3415 Date: 5 June 2018

New 6-axis CNC Broach Grinding Machine

Table of Contents

1. Scope

1.1 Abbreviated Description

2. Applicable Standards and Publications

3. Requirements

3.1 General Requirements

3.2 Machine Specific Requirements

3.3 Machine Control System

3.4 Requirements for Demonstration of Conformance

4. Quality Assurance Provisions

4.1 Responsibility for Inspection

4.2 Preliminary Acceptance Inspection

4.3 Government Participation

4.4 Reinspection Provisions

4.5 Post Inspection Procedures

4.6 Final Acceptance Inspection

4.7 Warranty

5. Preservation, Packaging and Delivery Instructions

6. Instructions to Offerors

Equip Engr. Spec # 17-18-3415 Dated: 5 June 2018

1. Scope:

1.1 Abbreviated Description. This specification defines the requirements for a new heavy duty 6-axis CNC Broach Grinding machine equal to or better than an existing Ekin CNC Broach Grinder, Model #CNC-2500-mm (Serial # F021) currently in use at the Watervliet Arsenal. The Watervliet ID number of the existing Ekin grinder is WV12810. However, to be completely acceptable, the offered model machines shall completely meet or exceed the functionality and capabilities of the existing broach grinder. Further, the new machine to be offered is intended to replace the existing equipment and must perform at least the same grinding operations on all the broach configurations and sizes currently processed through the existing machine. Also, the offered machine shall come fully equipped and provide the equivalent functionality in the control system/machine to duplicate existing grinding capabilities, grinding macros/programs currently in use on WV12810.

2. Applicable Standards and Publications. All work performed and procedures followed in association with this project shall meet or exceed all applicable and current Watervliet Arsenal, OSHA, local, state, and federal government codes and laws relative to fire, safety, environmental, and electrical issues. The quality of all work performed and material provided shall meet or exceed the latest applicable industry standards and engineering practices for this type of equipment and its intended function.

2.1 The Following Publication Apply to the latest Revision

• NAS 966

• ISO 1708 AND 230-2

• NFPA 79

• IEC 60204-1

• ANSI/ASME B5

• ANSI B11

• ANSI/ISO 12100

3. Requirements. All requirements are mandatory from the standpoint of intended function.

Wherever a specific requirement would force an offeror to depart from his standard practice or configuration, the Arsenal will accept, for evaluation, alternative offers for achieving the intended function. Any such alternative offers must be accompanied by sufficient technical information to allow the evaluator to reach a definite conclusion that the alternative is equal to or better than that specified.

3.1 General Requirements.

3.1.1 Design and Engineering. The machine shall be designed and engineered in accordance with latest standards recognized or adopted by the Association for Manufacturing Technology (formerly the National Machine Tool Builders Association). The design and engineering shall incorporate only concepts, systems, materials and new components which have been proven in prior use.

3.1.2 Materials. Materials incorporated in the construction of the machine shall be of sound and uniform quality, free from defects and shall conform in specification, heat treatment and suitability to the standards recognized or adopted by the Association for Manufacturing Technology / National Machine Tool Builders Association. For this type and class of equipment.

3.1.3 Construction. All parts of the machine shall be new and unused and shall be constructed so as to be capable of withstanding all forces encountered during operation to its maximum rated capacity. The structure and assembly of the machine and its components shall be sufficiently rigid that workpiece finish and accuracy are not impaired by machine vibrations.

3.1.3.1 Alignment Retention. Non-integral machine components, including but not limited to columns, heads and ways which are separately assembled and whose alignments determine the squareness and parallelism of machine geometry shall utilize a positive means for retaining alignments and regaining them in the event of accidental dislocation. The machine shall include all hardware devices required to maintain all specified alignments and accuracies.

3.1.4 Slideway Design and Construction. All precision ways which guide and bear the rated design loads shall adhere to the hardness criteria shown in the following examples of acceptable way systems. Please state in your proposal details of the way system being offered.

A. Integral cast iron ways shall be hardened to RC 50 to RC 54 to a depth of .100 inch or more.

B. Hardened and ground steel ways for mating with Turcite, Rulon or other such low friction forgiving materials shall be hardened within the range of RC 55 to RC 62. Actual hardness within this range shall not very more than 5 RC points.

C. Hardened and ground steel ways for use with anti-friction roller bearings shall be to a hardness of RC 62 to RC 65 to a depth of 1/8 inch or more.

Slideway systems other than the three (3) referred to above may be offered provided that their design is consistent with all specified performance characteristics of the machine. All slideway systems having less than a 60-degree incline to the horizontal shall be protected by way covers unless it can be substantiated that covers will interfere with the functions of the machine. In such cases, way protection is still required and a suitable alternative to covers shall be proposed for review and acceptance.

3.1.4.1 Replaceable Ways. If the machine being offered is portrayed as having replaceable ways, the assembly of the way bars to the machine frame shall be such that finish ground ways are fastened to a precision ground or scraped surface to permit field replacement without additional grinding.

3.1.4.2 Way Wipers. All way systems, regardless of type shall be equipped with wipers designed to prevent intrusion of foreign material. Wipers shall be adjustable to compensate for wear.

Wipers shall also be easily removable and replaceable.

3.1.5 Workmanship. Workmanship throughout the machine shall be of good quality and meet industry standards. For purposes of this specification, good quality workmanship is further defined as the completed machine's conformance to the manufacturer's engineering drawings and to standards recognized or adopted by the Association for Manufacturing Technology.

3.1.5.1 Shimming. Shims that do not appear on the engineering drawings shall not be incorporated in the machine.

3.1.5.2 Spacing. Spacers that do appear on the engineering drawings are permissible.

3.1.5.3 Other Techniques. Welding, brazing, soldering, and other such techniques shall be used only where called for in the machine’s design. They shall not be used to repair machine components defective in material or machining accuracy.

3.1.6 Maintainability. All parts subject to wear, distortion or failure and all parts which require periodic adjustment shall be readily and safely accessible for repair, replacement or adjustment as applicable. Instructions for maintenance and adjustments shall be clear, concise and definite in application.

3.1.7 Interchangeability. All parts bearing the same part number shall be functionally interchangeable.

3.1.8 Applicable Power Source. The power source to which the machine will be connected furnishes a nominal 480 volts, 3 phase, 60 Hz AC. However, the machine shall be tolerant enough of line fluctuations to operate normally at source voltages ranging from 432 to 504 volts. No internal or external transformers will be acceptable to convert to lower supply voltage.

3.1.8.1 Energy Efficiency. The machine and its equipment shall utilize energy efficient design techniques and methodologies by incorporation of the latest design technologies such as minimization of inductive loads (ex. motors, transformers), proper sizing and use of high efficiency motors, intelligent control / automatic power-down capability, variable speed drive usage, and optimized spindle drive design.

3.1.8.2 Electrical Safety Devices. The machine and its equipment shall be protected with circuit breakers which comply with NEMA standards for thermal magnetic types and shall have a minimum interrupting capacity of 25,000 RMS symmetrical amperes for 480 volt, 3-phase system.

Breaker terminals shall be UL listed as suitable for the type of conductors provided. Plug-in circuit breakers or current-limiting fuses are not acceptable.

3.1.8.3 Conversion Equipment. If DC or reduced voltage AC is required to meet any specified requirement, the necessary conversion or transformation equipment shall be furnished with the machine by the contractor. All transformers must meet NEMA TP 1-2002 energy efficiency requirements.

3.1.8.4 Electrical Enclosures. All separate electrical hardware / circuitry are to be housed in a NEMA-12 rate enclosure that are air conditioned and air filtered to maintain a constant temperature, reduce humidity and prevent contamination of control boards and other critical system components. Air conditioning units shall not utilize Ozone Depleting substances. Enclosures shall be painted with a color as close to the machine tool as possible.

3.1.8.5 Interconnect Wiring. All wiring shall comply with accepted Joint Industry Code (JIC), National Machine Tool Builders Association (NMTBA), and the National Fire Protection Association (NFPA) standards.

3.1.8.6 Motors. All motors provided shall be of the optimum type and horsepower rating to meet intended application and usage based on accepted engineering practice. All motors shall be equipped with thermal overload protection. All motors shall be housed in enclosures of the appropriate NEMA type for the class and severity of service. Each motor shall bear an identification plate containing, as a minimum, the identity of the manufacturer, the model, serial number, input voltage, amperage, horsepower, phase, frequency and frame or mounting. All AC unidirectional motor housings shall bear a directional arrow to indicate proper rotation direction when correctly wired. All AC motors rated at 25 hp or greater shall be equipped with a "soft start" mechanism which provides for reduced voltage starting. All polyphase AC motors rated at 1 Hp or greater shall be tested per IEEE Standard 112-Method B and must meet Premium Efficiency requirements per NEMA MG 1-2006 Table 12-12 or IE3 (IEC 60034-30:2008). All motors are to be permanently lubricated and sealed unless the contractor can substantiate that this feature cannot be offered by two (2) or more major motor manufacturers.

3.1.8.7 Operator Console / Control Panel Voltage. All electrical controls meant for use by the operator of the machine shall carry 120 volts AC maximum.

3.1.8.8 Utility Outlet. The machine shall be provided with an operational 120-volt AC single-phase, 20-ampere dual-receptacle 3-wire utility outlet. This outlet shall be protected by a ground-fault interrupter and shall be externally mounted and easily accessible. A “noise" suppression device shall be provided.

3.1.9 Safety and Environmental Features. The contractor shall review the environmental requirements documented in Appendix D and comply as applicable.

3.1.9.1 Protection of Machine Operator. Protection of the machine operator and other personnel shall be accomplished in accordance with all pertinent state, federal, local laws and regulations. This shall also include, but are not limited to: grinding wheel guards, alarm system, temperature/flame detection.

3.1.9.2 Protection of the Machine. The machine shall be fully equipped with the devices necessary to prevent self-damage in the event of malfunction and ordinary operator negligence insofar as practical. Such devices include, but are not limited to: limit switches, positive end stops, overload protective devices, lubrication fail-safes.

3.1.9.3 Noise Levels. The government's preference is to achieve noise levels not in excess of 80 dba and shall be accomplished at no additional expense to the Government. Noise levels shall be measured under load during the test of conformance to specified ranges and capacities (see 3.4.1.2), and shall be measured at any or various times during this test at the discretion of the Technical POC or other appointed representatives. Noise levels at a distance not exceeding one meter from the nearest point on the machine shall, under no circumstances, exceed a maximum of 85 dba when measured by a properly calibrated sound level meter set for "A" weighting and slow response. Any shields, baffles, enclosures or other devices required to bring the machine into conformance with this noise level requirement shall be furnished by the contractor. Any such devices shall not interfere with the proper operation of the machine and shall be designed to preserve the visibility needed for safe operation and ease of maintenance.

3.1.9.4 Fire Suppression Unit. If the machine is supplied with a fire suppression unit the unit shall be an American fire suppression unit, and filled with suppression material found in USA.

3.1.9.5 Ozone Depleting Substances. Section 326 of Public Law 102-484 precludes the Dept. of Defense from awarding any contract that directly or indirectly requires the use of a class I ozone-depleting substance within the Government specification or standards set forth in the contract.

Appendix B is a list of the restricted Class I CFC's and Halons. All shall be replaced by new functionally equivalent substances or systems that are approved for use by the Environmental Protection Agency (EPA) and have an "Ozone-Depletion-Potential" (ODP) rating of zero. Material Safety Data sheets (MSDS) shall be submitted for approval to Watervliet Arsenal at the time of the submission of proposal.

Definition: Ozone-Depletion-Potential (ODP). The relative capacity of a substance, per unit weight, for destroying the earth's stratospheric ozone layer, in comparison with CFC-11, CFC-12 and CFC- 114, each having been assigned an ODP of 1.00.

Note: Offerors are responsible to obtain and adhere to the most current list of prohibited substances as of the date of the submission of bids or proposals.

3.1.9.6 Asbestos and Mercury Free Certification. All materials utilized in the system shall be certified as asbestos and mercury free unless substitute materials do not exist. This certification shall be provided prior to machine delivery.

3.1.9.7 Material Safety Data Sheets. The offeror shall provide Watervliet Arsenal with all material safety data sheets at the time of the submission of his proposal if applicable.

3.1.9.8 Lead-Free and Chromium-Free Paint Certification. All paints and primers applied to the system shall be certified as lead free and chromium-free. Lead based paint is paint that contains more than six one hundredths of one percent (0.06%) lead by weight. This certification shall be provided prior to machine delivery.

3.1.9.9 PCB-Free Certification. To the extent that the machine may have been charged with lubrication and hydraulic fluids at the contractor's plant for preliminary acceptance inspection (see section 3.4), these fluids shall not contain Polychlorinated Biphenyl’s (PCB’s). The machine and its equipment shall be certified as PCB-free prior to being shipped.

3.1.9.10 Lockout/Tagout Procedures. The manufacturer is required to provide the proper control of hazardous energy (lockout/tagout) per OSHA 29 CFR 1910.147. This information shall be incorporated into the maintenance manual. The control of hazardous energy sources includes electrical, pneumatic, hydraulic, chemical, mechanical, UV, electromagnetic and thermal.

3.1.10 Identification Plate. A corrosion-resistant metal plate shall be securely attached to the machine in a visible location in the vicinity of the operator's workstation. This plate shall bear, as a minimum, the information called for as follows, with space at the bottom for one additional line of information to be applied by the government.

Nomenclature Manufacturer's name

Model Manufacturer's Serial Number Power Input (voltage, phase, frequency, and total amps) Government Contract Number Date of Manufacture

3.1.11 Lubrication. The machine shall be equipped to provide sufficient lubrication to every moving part where lubrication is essential to prevent damage. Slideways shall be lubricated by an automatically cycled distribution system such as that manufactured by Trabon Inc. Gearboxes or transmission cases shall be lubricated by the wet-sump splash method. Spindle bearings shall be lubricated by recirculating pressure spray systems. Systems of the foregoing types are considered automatic systems and they shall be equipped to be fail-safe to the maximum extent possible. Any sensors or other devices used to detect the presence (or absence) of lubrication shall be accessible for test or replacement without major disassembly. Manual lubrication methods (e.g. Grease fittings, oil cups.) are permissible for lubrication points not practically served by automatic systems. For non-recirculating automatic systems (such as slideway lubrication), the reservoirs shall be sized to provide lubrication reserve equivalent to 80 operating hours and shall be located at floor level. For recirculating automatic systems (such as pressure spray), easily cleanable or replaceable filtration devices shall be provided. Wet-sump type systems shall be equipped with means to confirm proper oil level. Sight gages, if used, shall be of the external standing tube type rather than the flush-mounted porthole type. Standing tube sight gages shall be protected against accidental breakage.

3.1.11.1 Lubrication Plate. A lubrication plate (or plates) shall be permanently fastened to the machine and shall clearly indicate the type and viscosity of lubricant and the service interval for all automatic and manual lubrication reservoirs and fittings. The plate shall include a simple diagram which depicts the physical location of all lubrication points on the machine structure.

3.1.11.2 Lubricants, Hydraulic Fluids, Oils and Coolants. Watervliet Arsenal established a standardized list of lubricants, hydraulic fluids, oils and coolants. The contractor is requested to choose the required lubricants, hydraulic fluids, oils and coolants from Appendix “A”, enclosed or where designated (*see note) approved industry/commercial equivalents. If a substitute is required, the contractor shall provide, at time of machine delivery, justification which shall include the manufacturer, type and specification number as well as the reason for the substitution.

3.1.12 Hydraulic System. Hydraulic systems provided shall be sized and powered for the intended application and shall conform to the industry standards. The system shall incorporate cleanable or replaceable filtration devices to insure fluid cleanliness. Reservoirs shall be equipped with easily visible gages to indicate fluid level. An appropriately sized refrigeration system shall be provided to ensure the hydraulic fluid does not exceed 120 degrees F inlet temperature. The hydraulic system shall be protected against overpressure as well as underpressure. System pressure in any hydraulic device shall be as low as is practical for the intended application but shall not exceed 3000 PSI in any case. In any system which utilizes hydraulics to produce thrust or direct linear motion, anti-surge devices or circuits shall be incorporated to insure uniformity of motion under varying loads.

These devices or circuits shall be adjustable. All reservoirs shall be easily accessible for cleaning and flushing and shall be located at floor level. The machine shall be provided with an appropriately sized hydraulic chiller system.

3.1.13 Painting. All exterior machine surfaces shall be painted except where bright metal is required for machine function or to otherwise adhere to the requirements of this specification. Paint shall be chromium-free and lead-free. Quality and manner of application shall be such as to afford protection throughout the normal life of the machine. Paint shall be "semi-gloss", and selected by the Government, from a list of standard colors supplied by the offeror with their proposal. This selection shall be made after contract award. Danger areas shall be painted red and caution areas shall be painted yellow in accordance with OSHA Standard 1910.144. Appropriate warning signs, tags or emblems will be affixed to respective areas of the machine in accordance with OSHA Standard 1910.145.

3.1.14 Machine Hold Down and Leveling. The machine base shall be provided with sufficient and properly located holes for positive hold-down when operating at full rated capacity. In addition, for each hole in the machine base, the contractor shall provide a set of his recommended hold-down and leveling hardware.

Note: All hold-down and leveling hardware shall be delivered 30-days prior to scheduled delivery of the machine.

3.1.15 Gears. All gears used in the machine and its components shall meet or exceed the standards recommended by the American Gear Manufacturers Association for the type and severity of service required.

3.1.16 Handwheels. Where power feed and rapid traverse of a machine component is provided or specified, associated handwheels or cranks, if any, shall not rotate when power feed or rapid traverse is engaged.

3.1.17 Technical Data. All data shall be in the English language and shall be furnished in accordance with the quantities, formats and delivery dates below. All data shall be packaged and delivered separately from the machine itself marked to the attention of the Technical POC. Please note any AutoCAD drawings provided shall not utilize the color yellow or any other colors that cannot be made readily visible when plotted out in color.

a. Foundation Drawings, Standard or Special (see note): Shall be complete in all construction detail to permit pricing and construction by a general contractor and shall be furnished as soon as possible after contract award or at least 210 days prior to scheduled delivery of the machine. All drawings shall be dimensioned in English units. One reproducible hardcopy and one electronic copy on CD in AutoCAD shall be provided. AutoCAD drawings shall not utilize the color yellow or any other colors that cannot be made readily visible when plotted out in color. When drawings are finalized the contractor shall certify the accuracy of the drawings by providing a stamped and signed hard copy of the drawings to the Watervliet Contracting Officer.

If a special foundation (see note) is required and the vendor/contractor refuses to provide the detailed drawings required then this shall be grounds for disqualification from further consideration in the machine tool procurement. Vendor proposals submitted shall be clear in their response to this requirement.

Note: Typical floor thickness at Watervliet is 8”-10”. A special foundation is one which exceeds thickness, load bearing capability and vibration insulation of Watervliet Arsenal's standard monolithic concrete flooring of 1,000 pounds per square foot load rating and one which requires a specific thickness, specifically-shaped excavations for coolant housings, chip conveyors, electrical circuits and conductors.

The soil (sub-straight) for a foundation is assumed to be medium dense gravel or medium dense gravel and sand with a minimum bearing capacity of 4,000 PSF. Should the contractor disturb the soil below the yet to be constructed concrete foundation then the contractor shall compact the disturbed soil to achieve at least 2,000 pounds per square foot (PSF) bearing capacity.

Important: See instruction par. 6.5

Foundation Drawings details shall include at least:

1) At least one drawing shall depict an over-lay top view of the machine foundation outline, machine general arrangement drawing (including all ancillary equipment) and the anchor bolt hole pattern.

2) The foundation drawings shall include 100% complete foundation details necessary for Watervliet Arsenal to directly hand over to a General Contractor for construction. This detail shall include, but not be limited to, complete foundation dimensions, rebar locations, rebar size, rebar pattern, concrete PSI requirements, and load bearing specs.

b. Machine and Equipment Floor Plan: A digitized machine and equipment floor plan in

AutoCAD shall be provided on a CD. This plan shall depict the complete machine space envelope including all ancillary equipment and the dimensioned bolt-hole pattern of the holddown bolts for the machines. This AutoCAD drawing(s) shall also contain information that indicates the type, magnitude, and connection points of all plant utilities (electrical power including the full load amperage requirements, air, water.) required to operate the machine. This data shall be furnished as soon as possible after contract award or within 30 calendar days with appendix C. One reproducible hardcopy and one electronic copy on CD in AutoCAD shall be provided.

c. Catalog of Standard Tooling and Accessories shall be furnished 30 days after award of contract. For offers of foreign built machine tools (i.e., machines built outside the United States, its possessions or Canada), the catalog shall set forth U.S. domestic sources of supply. (two copies)

d. Non-Standard (special) Tooling and Accessories. To the extent that this specification requires the development of unique tooling and accessories not generally available commercially, a set of drawings and specifications sufficiently complete to permit manufacture of such tooling and accessories shall be furnished at the time of machine delivery. Dimensional information shall be in English units. One reproducible hardcopy and one electronic copy on CD in AutoCAD.

e. Installation Instructions and Drawings containing all necessary information to install the equipment. This shall include a drawing containing the certified dimensioned locations of all equipment mounting/holddown holes. To be furnished as soon as possible after contract award or at least 210 days prior to scheduled delivery of the machine. One reproducible hardcopy and one electronic copy on CD in AutoCAD.

f. Lubrication Diagram or Instruction. To be delivered at time of machine delivery. Two reproducible hardcopy and one electronic copy on CD in AutoCAD.

g. Operating Instructions. These instructions shall be in the English language and be provided in separate manuals from other technical data provided. Instructions must include all updates for hardware and software. To be delivered upon machine delivery. Four hardcopies minimum of the operating instructions. Four reproducible hardcopy and one electronic copy on CD.

h. Maintenance and Troubleshooting Instructions for all machine systems. This material shall also include the machines mechanical assembly drawings. To be delivered at time of machine delivery. Four hardcopies minimum of the Maintenance and Troubleshooting Instructions. Two reproducible hardcopy and one electronic copy on CD in AutoCAD of the machines mechanical assembly drawings.

i. Electrical and hydraulic schematics to be furnished. To be considered acceptable, these schematics must clearly portray all as-built electrical and hydraulic ties to their respective main systems. Two reproducible hardcopy and one electronic copy on CD in AutoCAD. Final as-built drawings to be furnished not later than 30 days after final acceptance of the machine.

Note: If, during installation and testing, the actual electrical and hydraulic systems are configured differently than depicted on the schematics, receipt of the revised "As-Built" schematics shall be a condition of final acceptance.

j. Repair Parts Catalog. This catalog shall encompass every replaceable part in the machine and shall include appropriate identification and original equipment manufacturers part numbers and ordering data. Items which can normally be purchased locally may be so indicated provided they are sufficiently described. The repair parts catalog shall include illustrations which clearly locate parts within larger sub-assemblies. To be furnished not later than 30 days prior to delivery of the machine.

(two copies)

k. Programming Manuals. Where a CNC machine is offered or specified, programming manuals shall be supplied. These manuals shall include, or be supplemented by, a clear summary of the control functions actually implemented and usable on the system offered or specified. These manuals shall be delivered at machine delivery. (IN CD format)

l. Software Documentation. The offeror shall provide three copies of all system software and ladder logic developed to control and interface with the new control/drives with the existing machine tool. Two copies, CD, or flash card and the third copy shall be a paper (hard) copy. To be delivered to the technical POC 30 days after final acceptance of the machine.

3.1.18 Training Required. The contractor shall be responsible for providing acceptable training of Arsenal personnel. Training shall include most current software, firmware, and hardware with options and attachments as delivered to the Arsenal. All instructions and materials, oral or written, shall be in English. "On-Site" means "At Watervliet Arsenal", and "Off-Site" means "a location within the U.S. away from Watervliet Arsenal as determined and arranged for by the contractor". If specialized formal “off-site” training is available specify on offer availability and price as an option. The quality of the training shall be such that at the conclusion of the specified training time, each individual within their assigned category shall be capable of repairing or operating the machine to its productive capacity. Training shall be in accordance with the applicable areas of the following schedule:

Type of training # of persons When required Training location

Machine operation 4 During or after machine performance testing On site 5 work days

Mechanical / Hydraulic / electrical maintenance 2 During startup On site 1 work day

Electronics (CNC) maintenance 2 During Installation On site Spindle/Axes Drives

(if applicable) 2 During Installation On site

Programming training 2 During Installation On site Note: For all types of training, the associated technical data (see 3.1.17) shall be on hand at the time of instruction and its use and interpretation shall be covered during the training. A training schedule showing the hours of training for each person under their assigned category, shall be sent in with proposals for review.

3.1.19 Repair/Replacement Parts and Service. The offeror shall also agree to provide parts and service for the contracted equipment within 72 hrs of notification of a problem. Watervliet Arsenal recognizes that it may be hard to fulfill this requirement for major machine components. If the requirement cannot be adhered to, the offeror shall notify Watervliet Arsenal’s POC within two business days and shall provide a delivery schedule to be approved by Watervliet Arsenal’s POC. The offeror further agrees, as part of the contract, to store complete ordering data to include specifications, engineering drawings and other information for the contracted machine tools/parts. This data shall be stored within the U.S. or Canada and be sufficient in detail to permit successful acquisition of the parts and associated repair service. In the event of a national emergency the U.S. Government reserves the right to obtain the data and use it to support operation of the machine tool(s) purchased under this contract.

Note: The offeror shall supply a list of recommended spare machine parts as an option with the offer.

3.1.20 Pneumatic Requirements. If air is needed for any machine operation or function, the machine shall be fully equipped with all necessary piping, and valving, fully installed to the point of connection to which the Arsenal will connect shop air. Available shop air at the Arsenal is 85 psi and if higher or lower pressure is needed at the machine, the machine shall be fully equipped with the devices needed to modify the 85 psi supply pressure. The machine shall also be equipped with devices to remove the normal moisture and other contaminants usually present in shop air supplies. Normal moisture is defined as that moisture produced when air at a relative humidity of 75% has been compressed to 85 psig. An external compressor is not acceptable.

3.1.20.1 Air Dryers. At the offeror discretion if the machine is sensitive to moisture, the machine shall be provided with an appropriately sized refrigerated air dryer system complete with input and output filter cartridges. Industrial air dryers are to be of the latest technology that will result in the most energy efficient design. Power for the refrigerated air dryer unit shall be 110 V AC.

Common industrial air dryers that are used at the Watervliet Arsenal include the ZEKS HSE and Ingersoll-Rand D31NC models or equal.

3.1.21 Special Tools. If any element of machine operation or maintenance requires the use of specially designed tools, these tools shall be provided with the machine and shall become the property of the Government.

3.1.22 Control of Cutting Fluids. If the machine is equipped with a coolant system, the contractor shall insure that the machine is designed and equipped to prevent coolant from escaping the confines of the machine or leaking to the floor when producing workpieces of a size within the machine's normal working range. If the coolant reservoir is part of the foundation, the coolant shall be contained in a leak-proof metallic or non-metallic liner.

3.1.23 Site Conditions. The machine covered by this specification will be installed in general machine shop space and there will be no environmental conditioning. Temperatures will range from 65° F to 95° F. and relative humidity will range from 20% or less to 95%. On any given day, the temperature in the machine shop may change as much as 4° F per hour. These are the conditions under which the machine is expected to perform as specified, and the contractor shall be responsible for supplying whatever is required to meet the specified performance. The only permissible exception is positioning accuracy for numerically controlled machines. For this performance factor, allowances may be made for the effects of temperature fluctuation.

3.1.24 Heat Exchange Equipment. Heat exchange equipment shall be furnished with the machine wherever it is needed to keep operating temperatures within design or specified limits. Any heat exchange equipment using water as the heat exchange medium shall be fully recirculating and shall not require the continuing input and discharge of Arsenal water supply. Waste water systems of any type are not acceptable.

3.1.25 Coolant System The machine shall be equipped with a complete, appropriately sized and type coolant system recommended for the intended purpose of the broach grinder. Please provide complete details of the coolant system being offered. The coolant system shall be complete, including all pumps, motors, filters, piping, valves, reservoir and any other components required to comprise the complete system. In addition to an automatic cycle whereby coolant flow is started with spindle actuation, a provision for manual actuation at the operator’s discretion shall be included. All components shall be floor mounted, easily accessible for cleaning and flushing, and not require special pits or foundations for installation.

3.1.25.1 Heat Exchange Equipment. The machine and coolant system shall also be provided with heat exchange equipment if it is necessary to maintain acceptable operating temperatures and to meet and maintain component grinding accuracies.

3.1.25.2 Swarf Removal / Filtration System. The coolant system shall come complete with an appropriate filtration system to remove all contaminants (Swarf) from the coolant. Automatic means shall be provided to return cutting fluids to the machine's coolant tank which shall be separate from the unit. The Swarf removal system shall be engineered for the machine so that when fully installed in accord with instructions all points subject to periodic maintenance and lubrication shall be externally accessible and the unit shall be capable of being disassembled and removed without disabling the machine itself. The contractor is to provide details of the offered filtration system.

3.1.26 Work Area Enclosure. The machine shall also be provided with a work envelope enclosure to confine coolant to the grinding area (leak proof). The guarding shall include transparent panels to permit viewing of the grinding operation. The enclosure shall designed with double doors at least in the front to allow the operator full access to the work area. Additional access doors for maintenance or other purposes are acceptable. It shall be possible to load parts from overhead.

3.1.27 Work Light. The enclosure shall include a sufficient number of light fixtures conveniently mounted in the work compartment to provide illumination to the work piece and entire work area when all safety shields are closed and machine is operating. The lights shall be fluorescent or halogen with water proof construction to resist penetration of coolant. On/Off control should be at the operator’s station.

3.1.28 Mist Collection System. The enclosure shall include a mist collection system. The system shall continually collect coolant and grinding mist from inside the enclosure, separate it at the mist collector, discharge clean air above and drain the liquid back into the coolant reservoir

3.1.29 Machine Installation, Startup and Testing.

3.1.29.1 Work to be Performed by the Arsenal. Upon receipt of the required installation and foundation drawings (see 3.1.17), Watervliet Arsenal will prepare the intended installation site prior to delivery of the machine. After placement of the machine by the contractor/riggers, Watervliet Arsenal will run utilities to first points of connection. However, if the installation instructions supplied by the contractor are incomplete or insufficiently detailed, installation work will stop and the contractor will be required to dispatch a service engineer. Installation will resume upon his arrival and continue under his guidance.

Note: If installation instructions, foundation drawings and electrical and hydraulic schematics are not delivered at or before the times specified (see 3.1.17), the Government reserves the right to forestall delivery and final acceptance testing of the machine by an amount of time equal to the delay in receipt of instructions, drawings or schematics.

3.1.29.2 Work to be Performed by the Contractor. This project will be turn-key with the contractor being responsible for all aspects of the project except as mentioned in par 3.1.29.1 above. If a special foundation is not required the Contractor is responsible for the removal of wood block flooring and existing concrete preparation. Grouting for machine hold downs shall be the contractor’s responsibility regardless of foundation type. The contractor shall provide competent English-speaking service personnel to install the machine, rough and finish level the machine place the machine in operation and conduct the acceptance tests specified in section 4. The contractor, through his own service personnel shall be fully responsible for the startup and testing of the machine, and the service personnel shall remain until the machine activation and testing have been successfully completed.

Under no circumstances should the contractor plan on gratuitous Arsenal assistance for diagnosis, troubleshooting, or repair of the equipment during activation and testing. Should such activity prove necessary, it shall be the contractor's responsibility to provide the appropriate labor and materials. If the contractor chooses to request Arsenal assistance in lieu of providing his own resources, the request will be reviewed by the Technical POC who shall reserve the right to impose a charge for the assistance. Approvals, even on a charge basis, should not be taken for granted since there is no guarantee that appropriate Arsenal personnel will be readily available. In such cases, the Arsenal will not be held responsible for delays in acceptance of the equipment resulting from non-availability of Arsenal personnel or Arsenal-furnished equipment.

Contractor personnel shall be solely responsible for costs associated with shipping, delivery, rigging, installation, and connection. After all required work has been completed, and upon completion of paragraphs 4.2 and 4.5 the contractor shall ship the machine to Watervliet Arsenal.

Contractor personnel shall coordinate the shipment of the machine to Watervliet. Contractor personnel shall arrange for rigging services to off load the machine and contractor personnel shall be on-site at Watervliet when the machine arrives and is off loaded. Outside rigging services should be advised that only tagged and certified chain hoists are permitted to be used at the Arsenal and that all rigging slings must be tagged and certified for the weights being lifted. Contractor personnel shall supervise the placement of the machine on the installation site by the rigging service. In most cases no Arsenal forklift services and Arsenal personnel will be available for the installation. Only propane powered forklifts are permitted and must also be equipped with a roll cage and operator license.

Arsenal overhead pendant cranes (within load capacities) can be used by the contractor/rigging service for the installation. The contractor shall provide written certification to the WVA representative that all contractor/rigger personnel are qualified, through either formal training or experience per OSHA, to operate pendant controlled overhead cranes. Contractor personnel shall also adhere to the WVA requirements to wear OSHA approved safety glasses and safety shoes while in the manufacturing shop areas. The contractor shall ensure they bring all equipment/material necessary for the installation of the machine(s). Watervliet does not have the resources to provide such material. Crane capacity within each building is limited (2, 5, 10 or 15 tons) and therefore if not adequate then the contractor will need to provide alternate means necessary for the installation.

IMPORTANT: Under normal circumstances the contractor will be allowed to work as long as is desired during normal work days. Contractor work outside Watervliet’s normal work days cannot be guaranteed. Watervliet is on a condensed work schedule. Normal work hours/days for this schedule are four 9-hour workdays (Friday off) one week and four 9-hour days, one 8-hour day (Friday) the following week. Contractor work on the Friday off and weekends cannot be guaranteed.

Contractor’s classified as foreign nationals may further restrict work hours and days available.

If the contractor requests Watervliet Arsenal to ship misc. material via UPS, FedEx or by other similar carrier then the contractor shall provide their carrier account number for this purpose.

3.2 Machine-Specific Requirements.

3.2.1 Machine Tool Description. The intent of this specification is to define the requirements for a new 6-axis CNC Broach Grinding machine equal to or better than an existing Ekin CNC Broach Grinder, Model #CNC-2500-mm currently in use at Watervliet Arsenal. The Watervliet ID number of the existing Ekin grinder is WV12810. Machine models potentially considered as acceptable replacements include the Klink Model RSB 2500 CNC or equal. However, to be completely acceptable, the offered model machine shall completely meet or exceed the functionality and capabilities of the existing broach grinder. Further, the new machine to be offered is intended to replace the existing equipment and must perform at least the same grinding operations on all the broach configurations and sizes currently processed through the existing machine. Also, the offered machine shall come fully equipped and provide the equivalent functionality in the control system/machine to duplicate existing grinding capabilities, grinding macros/software/programs and other systems currently in use on WV12810. The machine shall be used by the Arsenal to grind a variety of flat profile (straight and staggered tooth), round and square profile, and other configuration of broaches used in the manufacture of cannons. The broach materials to be machined include: M2, M3, M45, and T15 high speed steels hardened up to 65-67 Rc. Other high nickel strength steels as well as other type steel components and materials (including non-ferrous) may be used.

It will be the responsibility of each vendor to perform a site visit to Watervliet Arsenal to ascertain the capabilities of the existing machine and the various broach configurations and sizes to be processed in the new machine. Failure to make a site visit will not relieve the eventual contractor of their responsibility to provide a complete machine that meets all of the current broach grinding requirements.

The new Broach grinder shall be capable of grinding with both ceramic-bonded cubic boron nitride (CBN) plated and diamond grinding wheels.

3.2.2 Required Size Characteristics.

Overall Machine (Doors open):

1) Width – left to right *………………… .... 336” (8534 mm) or less

2) Height – up/down *………………… ....... 144” (3658 mm) or less

3) Depth – front to back *………………. ..... 168” (4267 mm) or less

* Includes electrical cabinet / lubrication system / mist collection / coolant systems

4) Operating Voltage ..................................... 480 VAC, 3 phase, 60 Hz

5) Total Connected Load ............................... 30 KVA or less

Axis Designations:

6) X Linear Axis ............................................ Longitudinal Motion of Grinding Guide

7) Y Linear Axis ............................................ Grinding-Wheel Vertical Height Movement

8) Z Linear Axis............................................. Grinding-Wheel Transverse Movement

9) A Rotational Axis ...................................... Workpiece / Headstock Rotation

10) B Rotational Axis .................................... Grinder Column Rotation

11) C Rotational Axis .................................... Grinder Head Rotation

Travels:

12) Longitudinal Grinding Wheel Slide (X) .. 98" (2489 mm) or more

13) Vertical Grinding Wheel Slide (Y) ......... 11" (279 mm) or more

14) Transverse Grinding Wheel Slide (Z) ..... 14" (330 mm) or more

15) Workpiece Headstock Rotation (A) ........ 360° continually

16) Grinding Column Rotation (B)................ ±30°

17) Grinding Head Rotation (C) .................... 360°

Grinding Capacities:

18) Minimum Distance Between Centers…………………12” (305 mm) or less

19) Maximum Distance Between Centers .................. …... 118" (3000 mm) or more

20) Horizontal Usable Grinding Distance……………. .. .. 96” (2438 mm) or more

21) Diameter Between Centers – Workpiece Diameter…. 11" (279 mm) or more

22) Minimum Grinding Wheel Diameter………………....3” (76 mm) or less

23) Maximum Grinding Wheel Diameter.......................... 7” (178 mm) or more

24) Grinding Wheel Bore Diameters…………………...... ¾”, 1 ¼” Bore sizes - minimum

25) Minimum Round Broach Diameter Capability……. ... 1” (25.4 mm) or less

26) Maximum Round Broach Diameter Capability…….... 6” (152 mm) or more

27) Distance from Headstock Centerline to Worktable…. 6” (152 mm) or more

Work Table:

28) Clamping surface work table depth, flat broach ........... 10” (254 mm) or more

29) Clamping surface work table width, flat broach ........... 30” (762 mm) or more

30) Indexable table work surface depth, special broach ...... 6”(152 mm) or more

31) Indexable table work surface width, special broach…. 60”(1524 mm) or more

3.2.3 Required Performance Characteristics.

Motorized Grinding Wheel Spindle:

1) Minimum Grinding Spindle Speed……....……… 2,500 RPM or less

2) Maximum Grinding Spindle Speed……………… 10,000 RPM or more

3) Grinding Spindle Motor Power .............................. 13 HP or more

Feedrate / Traversing Speeds:

4) X, Y, Z Linear Axes .............................................. 200 in/min (5.1 m/min) maximum

5) Workpiece Headstock Rotation (A) ....................... 250 RPM maximum

6) Grinding Column Rotation – Guide (B)… ............. 3 RPM maximum

7) Grinding Head Rotation – Wheel head (C)… ........ 3 RPM maximum

3.2.4 Required Alignment & Accuracy Characteristics

Programmable Increments/Accuracies:

1) X, Y, Z Linear Axes Position…………………… ....... 0.0001” (0.00254 mm) or less

2) A, B, C Rotational Axes Position….. ........................... 0.001° or less

Feedback Resolution:

3) Linear axes (Heidenhain Digital Scale)…………….... 0.00002” (0.00051 mm) or less

4) Rotary axes…………................................................... 0.0005° or less

5) Longitudinal accuracy of headstock/tailstock centers.. 0.003” (0.0076 mm) or less

3.2.5 Required Functional / Operating Capability Characteristics. The machine shall be delivered fully equipped and ready to perform, as a minimum, the following mandatory functions and performance requirements :

A. Re-sharpen flat broaches on cutting face and flank.

B. Re-condition the chip face (gullet) on flat broaches to reclaim the original configuration.

C. Re-sharpen form broaches for producing rectangular configurations having gullets which do not traverse the entire width of the broach body.

D. Re-sharpen round and round profile broaches on cutting face and flank.

E. Re-condition the chip space (gullet) on round and round profile broaches to reclaim the original configuration.

F. Re-grind pilot diameters of round and round profile broaches.

G. Re-grind all types broaches have regular or irregular pitches.

H. Re-establish uniform tooth depths for all types of broaches.

I. Ability to grind Threads V and Acme.

J. Be able to grind from a print, entered data without probing.

K. Ability to have a list of applicable variables when generating a program.