SCOPE OF WORK
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911PT-17-Q-0071.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work for Calibration and Controls The Watervliet Arsenal is requesting a contractor to cover the cost of service and engineering to Examine, Test, Repair, And Calibrate All Control Instrumentation and Accessories at the IWTP, Building 36.
Point Of Contact: Kyle Sartain or Marc Kouffman. This will Include SO2 Air Monitor, ORP, PH Meters, Controllers, Level Indicators, Flow meters. Contractor shall calibrate Once a Month.
Repairs may be required to subject gage equipment. Mandatory: Four (4) Hour Response Time. Cost of Replacement Parts as Needed with Approval of Government points of contact above, and Detailed Billing for Parts. Bidder shall provide Hourly Rate (Standard and Overtime).
| GAGE ID |
| GAGE S/N |
| DESCRIPTION |
| ACIDRECWELL |
| 93081309 |
| Acid Receiving well PH |
| AIRMONITOR 1 |
| A-3-2-0-0-2 |
| Air monitor SO2 |
| AIRMONITOR 2 |
| C15-400181818-10-0 |
| Air Monitor Behind Reaction Tank |
| AIT105 |
| 93081303 |
| Reaction Tank #1 inlet PH |
AIT106
Reaction Tank #1 inlet ORP
| AIT107 |
| 93081301 |
| Reaction Tank #1 outlet PH |
| AIT112 |
| 93081305 |
| Blend Tank #1 |
| AIT205 |
| 93061746 |
| Reaction Tank #2 inlet PH |
| AIT206 |
| 95070872 |
| Reaction Tank #2 inlet ORP |
| AIT207 |
| 93081307 |
| Reaction Tank #2 outlet PH |
| AIT212 |
| 93061744 |
| Blend Tank #2 |
| ATANKLEVEL |
| 8305004 |
| “A” Tank Level |
| BTANKLEVEL |
| 8305001 |
| “B” Tank Level |
| CLAR1 |
| 409630528 |
| Clarifier #1 PH |
| CLAR2 |
| 410630481 |
| Clarifier #2 PH |
| LE113 |
| 3190 |
| Blend Tank Level #1 |
| LE213 |
| 3245 |
| Blend Tank Level #2 |
LI104
Acid Holding Tank #1
LI106
Acid Holding Tank #2
LI010
Sulfuric Acid Holding Tank
LI011
Soluble Oil Waste Tank
LI012
Caustic Storage Tank
LI342
Skim Oil Holding Tank Level
| SUMPLEVEL |
| F-389 |
| Sump Level |
Period of Performance will be for one calendar year. Contractor shall be required to abide by the Watervliet Arsenal Instructions for Contractors, found at https://www.wva.army.mil/Documents/Contracting/WAIC.pdf