Calibration_and_controls_Scope_of_Work.docx

DOCX document 14 KB Posted

Attached to
CALIBRATIONS AND INSTRUMENTATION Federal contract opportunity
Solicitation number
W911PT-17-Q-0071
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

SCOPE OF WORK

View the file

Other files for this federal contract opportunity

Other files attached to CALIBRATIONS AND INSTRUMENTATION, newest first.
File Type Posted
W911PT-17-Q-0071.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work for Calibration and Controls The Watervliet Arsenal is requesting a contractor to cover the cost of service and engineering to Examine, Test, Repair, And Calibrate All Control Instrumentation and Accessories at the IWTP, Building 36.

Point Of Contact: Kyle Sartain or Marc Kouffman. This will Include SO2 Air Monitor, ORP, PH Meters, Controllers, Level Indicators, Flow meters. Contractor shall calibrate Once a Month.

Repairs may be required to subject gage equipment. Mandatory: Four (4) Hour Response Time. Cost of Replacement Parts as Needed with Approval of Government points of contact above, and Detailed Billing for Parts. Bidder shall provide Hourly Rate (Standard and Overtime).

GAGE ID
GAGE S/N
DESCRIPTION
ACIDRECWELL
93081309
Acid Receiving well PH
AIRMONITOR 1
A-3-2-0-0-2
Air monitor SO2
AIRMONITOR 2
C15-400181818-10-0
Air Monitor Behind Reaction Tank
AIT105
93081303
Reaction Tank #1 inlet PH

AIT106

Reaction Tank #1 inlet ORP

AIT107
93081301
Reaction Tank #1 outlet PH
AIT112
93081305
Blend Tank #1
AIT205
93061746
Reaction Tank #2 inlet PH
AIT206
95070872
Reaction Tank #2 inlet ORP
AIT207
93081307
Reaction Tank #2 outlet PH
AIT212
93061744
Blend Tank #2
ATANKLEVEL
8305004
“A” Tank Level
BTANKLEVEL
8305001
“B” Tank Level
CLAR1
409630528
Clarifier #1 PH
CLAR2
410630481
Clarifier #2 PH
LE113
3190
Blend Tank Level #1
LE213
3245
Blend Tank Level #2

LI104

Acid Holding Tank #1

LI106

Acid Holding Tank #2

LI010

Sulfuric Acid Holding Tank

LI011

Soluble Oil Waste Tank

LI012

Caustic Storage Tank

LI342

Skim Oil Holding Tank Level

SUMPLEVEL
F-389
Sump Level

Period of Performance will be for one calendar year. Contractor shall be required to abide by the Watervliet Arsenal Instructions for Contractors, found at https://www.wva.army.mil/Documents/Contracting/WAIC.pdf

File details come from the government source that posted it. Updated .