8-16-6625_-_Spec_Rev._B.pdf
PDF 141 KB Posted
- Attached to
- Coordinate Measuring Machines Federal contract opportunity
- Solicitation number
- W911PT-16-Q-0068
About this file
Equipment Engineering Specification 8-16-6625
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| JA_16-04_-_Redacted_-_CMM.pdf | ||
| 8-16-6625_-_Comply_Sheet.xls | XLS spreadsheet | |
| 16-Q-0068.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specification for Two New Coordinate Measuring Machines
(CMM)
Spec. # 8-16-6625 Rev. B
Manufacturing Engineering Work Group Watervliet Arsenal
Watervliet, New York 12189 7/25/2016
Department of the Army
TACOM
8-16-6625
1 Scope: The two new pieces of equipment purchased by this specification shall be Brown & Sharp Global Performance Silver Edition coordinate measuring machines (CMM) model 9208. The machines shall come equipped with an all aluminum ultra rigid frame, Tricision extruded triangular cross section bridge beam design, one piece granite table with integrated machined dovetail guideway, and PC-DMIS CAD++ software.
1.1 Procurement of More Than One Machine: In this specification requirements and terminology are oriented toward the purchase of a single CMM. However, two or more identical machines will be procured in accordance with this specification. In this case, the term "the machine" means "each machine". All requirements in this specification apply to each machine procured and shall be provided in quantities accordingly, unless otherwise stated.
2 Applicable Standards and Publications: All work performed and procedures followed in association with this project shall meet or exceed all applicable and current EU, NFPA, and UL standards. The quality of all work performed and material provided shall meet or exceed the latest applicable industry standards and engineering practices for this type of equipment and its intended function. In all instances, material, quality, and workmanship shall meet or exceed OEM specifications.
3 Requirements: All requirements are mandatory from the standpoint of intended function.
Wherever a specific requirement would force an offeror to depart from his standard practice or configuration, the Arsenal will accept, for evaluation, alternative offers for achieving the intended function. Any such alternative offers must be accompanied by sufficient technical information to allow the evaluator to reach a definite conclusion that the alternative is equal to or better than that specified.
3.1 General Requirements
3.1.1 Design and Engineering. The machines shall be designed and engineered in accordance with the latest standards recognized or adopted by the ANSI for the robotic industry.
The design and engineering shall incorporate only concepts, systems, materials and new components which have been proven in prior use. Modifications to manufacturers’ standard designs to achieve requirements specified herein are not permissible if they result in deviations from good design practice.
3.1.2 Materials. Materials incorporated in the construction of the machines shall be of sound and uniform quality, free from defects and shall conform in specification, heat treatment and suitability to the standards recognized or adopted by the Association for Manufacturing Technology for this type and class of equipment.
3.1.3 Construction. All parts of the machines shall be new and unused and shall be constructed so as to be capable of withstanding all forces encountered during operation to its maximum rated capacity. The structure and assembly of the machines and their components shall be sufficiently rigid that workpiece finish and accuracy are not impaired by machine vibrations.
3.1.4 Workmanship. Workmanship throughout the machines and their equipment shall be of good quality and in conformance to the manufacturer's engineering drawings and to standards recognized or adopted by ISO-9001.
3.1.5 Castings and Forgings. All castings and forgings shall be free of defects, scale, and mismatching. Weldments, if used, shall be braced, ribbed and gusseted to obtain strength equal to or better than the strength of castings, and shall be properly stressed relieved.
3.1.6 Maintainability. All parts subject to wear, distortion or failure and all parts which require periodic adjustment shall be readily and safely accessible for repair, replacement or adjustment as applicable. Instructions for maintenance and adjustments shall be clear, concise and definite in application.
3.1.7 Interchangeability. All parts bearing the same part number shall be functionally interchangeable.
3.1.8 Applicable Power Source. The power source to which the machines will be connected furnishes a nominal 115 volts, single phase, 60 Hz AC. However, the machines shall be tolerant enough of line fluctuations to operate normally at source voltages ranging from 103 to 127 volts.
3.1.8.1 Conversion Equipment. If DC or reduced voltage AC is required to meet any specified requirement, the necessary conversion or transformation equipment shall be furnished with the machines by the contractor. All transformers must meet NEMA TP 1-2002 energy efficiency requirements.
3.1.8.2 Connectors. External connections to probes, measuring heads, etc., normally assembled by the system operator with the exception of the ac power cord, shall be quick disconnect connectors.
3.1.8.3 Cabinet Enclosure for Electronic Equipment. All separate electrical hardware / circuitry are to be housed in a NEMA rated enclosure/cabinet. Should forced ventilation be necessary to maintain the interior of the enclosure at a temperature to ensure good product reliability, filtered air shall be forced into the cabinet to maintain an over pressure condition in the cabinet. Cabinet shall not inhibit operator access to the controls and/or adjustments.
3.1.8.4 Interconnecting Wiring. All wiring shall comply with accepted National Fire Protection Association (NFPA) Standards.
3.1.8.5 Operator Control Voltage. All electrical controls meant for use by the operator of the machine shall carry a maximum of 120 volts AC @ 60 Hz.
3.1.9 Safety and Environmental Features.
3.1.9.1 Protection of Machine Operator. Protection of the machine operator and other personnel shall be accomplished in accordance with all pertinent state, federal, local laws and regulations.
3.1.9.2 Protection of the Machine. The machines shall be fully equipped with the devices necessary to prevent self-damage in the event of malfunction and/or ordinary operator negligence insofar as practical. The system shall be equipped with the necessary protective devices required to prevent electrical/electronic damage to the system because of over-travel, power failure, and the resultant start and stop due to power failure. A surge protector (power conditioner) must be supplied for the computer system and its peripherals.
3.1.9.3 Noise Levels. The government's preference is to achieve noise levels not in excess of 80 dba and shall be accomplished at no additional expense to the Government.
3.1.9.4 Ozone Depleting Substances. Section 326 of Public Law 102-484 precludes the Dept. of Defense from awarding any contract that directly or indirectly requires the use of a class I ozone-depleting substance within the Government specification or standards set forth in the contract. Attachment B is a list of the restricted Class I CFC's and Halons. All shall be replaced by new functionally equivalent substances or systems that are approved for use by the Environmental Protection Agency (EPA) and have an "Ozone-Depletion-Potential" (ODP) rating of zero. Material Safety Data sheets (MSDS) shall be submitted for approval to Watervliet Arsenal at the time of the submission of proposal.
Definition: Ozone-Depletion-Potential (ODP). The relative capacity of a substance, per unit weight, for destroying the earth's stratospheric ozone layer, in comparison with CFC-11, CFC-12 and CFC- 114, each having been assigned an ODP of 1.00.
Note: Offerors are responsible to obtain and adhere to the most current list of prohibited substances as of the date of the submission of bids or proposals.
3.1.9.5 Asbestos and Mercury Free Certification. All materials utilized in the system shall be certified as asbestos and mercury free unless substitute materials do not exist.
This certification shall be provided prior to machine delivery.
3.1.9.6 Lead-Free and Chromium-Free Paint Certification. All paints and primers applied to the system shall be certified as lead free and chromium-free. Lead based paint is paint that contains more than six one hundredths of one percent (0.06%) lead by weight. This certification shall be provided prior to machine delivery.
3.1.9.7 PCB-Free Certification. To the extent that the machine may have been charged with lubrication and/or hydraulic fluids at the contractor's plant for preliminary acceptance inspection, these fluids shall not contain Polychlorinated Biphenyl’s (PCB’s). The machines and their equipment shall be certified as PCB-free prior to being shipped.
3.1.10 Identification Plate. A corrosion-resistant metal plate shall be securely attached to each machine in a visible location in the vicinity of the operator's workstation. This plate shall bear, as a minimum, the information called for as follows, with space at the bottom for one additional line of information to be applied by the government.
Nomenclature Manufacturer's name Model Manufacturer's Serial Number Power Input (voltage, phase, frequency, and total amps) Government Contract Number Date of Manufacture
3.1.11 Lubrication. The machines shall be equipped to provide sufficient lubrication to every moving part where lubrication is essential to prevent damage. If the CMM requires periodic, additional lubrication over the life of the machine, a lubrication plate (or plates) shall be permanently fastened to the machine and shall clearly indicate the type and viscosity of lubricant and the service interval for all automatic and manual lubrication reservoirs and fittings. The plate shall include a simple diagram which depicts the physical location of all lubrication points on the machine structure. The contractor is requested to choose required lubricants, fluids, and oils from Attachment A.
3.1.12 Painting. All exterior machine surfaces shall be painted except where bright metal, aluminum, granite, or other critical surfaces are required for machine function or to otherwise adhere to the requirements of this specification. Paint shall be chromium-free and lead-free.
Quality and manner of application shall be such as to afford protection throughout the normal life of the machine. Danger areas shall be painted red and caution areas shall be painted yellow in accordance with OSHA Standard 1910.144. Appropriate warning signs, tags or emblems will be affixed to respective areas of the machine in accordance with OSHA Standard 1910.145.
3.1.13 Technical Data. All data shall be in the English language and shall be furnished in accordance with the quantities, formats and delivery dates below. All data shall be packaged and delivered separately from the machine itself marked to the attention of the Technical POC. Please note any AutoCAD drawings provided shall be saved as AutoCAD 2012 files.
a. Foundation Drawings, Standard or Special (see note): Shall be complete in all construction detail to permit pricing and construction by a general contractor and shall be furnished as soon as possible after contract award, prior to scheduled delivery of the machines.
All drawings shall be dimensioned in English units. One electronic copy on CD in AutoCAD .dwg or .dxf format shall be provided within 30 days after contract award. When drawings are finalized the contractor shall certify the accuracy of the drawings by providing a stamped and signed hard copy of the drawings to the Watervliet Contracting Officer.
NOTE: Typical floor thickness at Watervliet is 8”-10”. A special foundation is one which exceeds thickness, load bearing capability and vibration insulation of Watervliet Arsenal's standard monolithic concrete flooring of 1,000 pounds per square foot load rating and/or one which requires a specific thickness, specifically-shaped excavations for coolant housings, chip conveyors, electrical circuits and conductors, etc.
b. Machine and Equipment Floor Plan: One digitized machine and equipment floor plan in AutoCAD .dwg or .dxf format shall be provided on a CD. This plan shall depict the complete machine space envelope including all ancillary equipment and the dimensioned bolt-hole pattern of the hold-down bolts for the machines. This AutoCAD drawing(s) shall also contain information that indicates the type, magnitude, and connection points of all plant utilities (electrical power including the full load amperage requirements, air, water, etc.) required to operate the machine. This data shall be furnished as soon as possible after contract award, prior to scheduled delivery of the machines. Also, if a foundation is required for the offered machine then this drawing shall also clearly depict the outline of the foundation and provide locating dimensions from a fixed point on the machine to at least one corner of the foundation. When drawings are finalized the contractor shall certify the accuracy of the drawings by providing a stamped and signed hard copy of the drawings to the Watervliet Contracting Officer.
c. Catalog of Standard Tooling and Accessories shall be furnished 30 days after award of contract. For offers of foreign built machine tools (i.e., machines built outside the United States, its possessions or Canada), the catalog shall set forth U.S. domestic sources of supply. (one electronic copy on CD)
d. Non-Standard (special) Tooling and Accessories. To the extent that this specification requires the development of unique tooling and/or accessories not generally available commercially, a set of drawings and specifications sufficiently complete to permit manufacture of such tooling and accessories shall be furnished at the time of machine delivery. Dimensional information shall be in English units. One electronic copy on CD in AutoCAD .dwg or .dxf format shall be provided prior to machine delivery.
e. Installation Instructions and Drawings containing all necessary information to install the equipment. This shall include a drawing containing the certified dimensioned locations of all equipment mounting/holddown holes. To be furnished as soon as possible after contract award, prior to scheduled delivery of the machines. One electronic copy on CD in AutoCAD .dwg or .dxf format shall be provided prior to machine delivery.
f. Lubrication Diagram or Instruction. To be delivered at time of machine delivery (if required). One electronic copy on CD in AutoCAD .dwg or .dxf format shall be provided.
g. Operating Instructions. These instructions shall be in the English language and be provided in separate manuals from other technical data provided. Instructions must include all updates for hardware and software. To be delivered upon machine delivery. One electronic copy on CD shall be provided.
h. Maintenance and Troubleshooting Instructions for all machine systems. This material shall also include the machines mechanical assembly drawings. To be delivered at time of machine delivery. One electronic copy on CD in AutoCAD .dwg or .dxf format of the machines mechanical assembly drawings.
i. Electrical and hydraulic schematics To be considered acceptable, these schematics must clearly portray all as-built electrical and hydraulic ties to their respective main systems. One electronic copy on CD in AutoCAD .dwg or .dxf format. Final as-built drawings to be furnished not later than 30 days after final acceptance of the machines.
NOTE : If, during installation and testing, the actual electrical and/or hydraulic systems are configured differently than depicted on the schematics, receipt of the revised "As-Built" schematics shall be a condition of final acceptance.
j. Repair Parts Catalog. This catalog shall encompass every replaceable part in the machines and shall include appropriate identification and ordering data. Items which can normally be purchased locally may be so indicated provided they are sufficiently described. The repair parts catalog shall include illustrations which clearly locate parts within larger sub-assemblies. To be furnished not later than 30 days prior to delivery of the machines. (one electronic copy on CD)
k. Programming Manuals. Programming manuals for all languages and functionality on the CMM shall be supplied in the English language and be of the latest revision. These manuals shall include, or be supplemented by, a clear summary of the control functions actually implemented and usable on the system offered or specified. These manuals shall be delivered at machine delivery and include one electronic copy on CD.
l. Software Documentation. The offeror shall provide copies of all system software and/or ladder logic developed to control and interface with CMM, controller, and computer hardware and include one electronic copy on CD. To be delivered to the technical POC 30 days after final acceptance of the machines.
m. Calibration Documentation. Calibration manual and certified results from the factory runoff shall be supplied prior to machine delivery. (one electronic copy)
3.1.14 Training Required. The contractor shall be responsible for providing acceptable training of Arsenal personnel. The type and extent of training shall depend upon whether the machine specified or offered is equipped with numerical control. All instructions and materials, oral or written, shall be in English. "On-Site" means "At Watervliet Arsenal", and "Off-Site" means "a location within the U.S. away from Watervliet Arsenal as determined and arranged for by the contractor". The quality of the training shall be such that at the conclusion of the specified training time, each individual within their assigned category shall be capable of repairing or operating the machine to its productive capacity. Training shall be in accordance with the applicable areas of the following schedule:
Type of training Number of persons When required Training location
Software training 4 After delivery Off site Laser Scanner training 1 After delivery Off site
Note: For all training, the associated technical data (see 3.1.13) shall be on hand at the time of instruction and its use and interpretation shall be covered during the training. A training schedule showing the hours of training for each person under their assigned category, shall be sent in with proposals for review.
3.1.15 Pneumatic Requirements. If air is needed for any machine operation or function, the machine shall be fully equipped with all necessary piping, valving, etc., fully installed to the point of connection to which the Arsenal will connect shop air. Available shop air at the Arsenal is 85 psi and if higher or lower pressure is needed at the machine, the machine shall be fully equipped with the devices needed to modify the 85 psi supply pressure. The machine shall also be equipped with devices to remove the normal moisture and other contaminants usually present in shop air supplies. Normal moisture is defined as that moisture produced when air at a relative humidity of 75% has been compressed to 85 psig.
3.1.16 Special Tools. If any element of machine operation or maintenance requires the use of specially designed tools, these tools shall be provided with the machine and shall become the property of the Government.
3.1.17 Site Conditions. These machines will be installed in an air conditioned enclosure with a temperature range of 66 °F (19 °C) to 70 °F (21 °C) and a relative humidity range of 20% to 50% with a maximum hourly rate change of 1 °F. The CMM controller shall include a thermal compensation model that ensures stated repeatability and accuracies for the operating conditions in the Watervliet Arsenal enclosure. The contractor shall be responsible for furnishing all environmental information as to what will be required to meet the specified performance of their equipment within the Watervliet Arsenal furnished enclosure. This information is also requested prior to scheduled delivery of the machine. The temperature outside the controlled enclosure will range from 60 °F (15 °C) to 95 °F (35 °C) and relative humidity will range from 20% or less to 95% on any given day. The temperature in the machine shop may change as much as 4 °F per hour.
3.1.18 Machine Installation, Startup and Testing. The machines must be able to fit through a doorway measuring 8’8” high by 9’2” wide.
3.1.18.1 Work to be Performed by the Arsenal. Upon receipt of the required installation and foundation drawings (see 3.1.14), Watervliet Arsenal will prepare the intended installation site prior to delivery of the machines. After placement of the machines by the contractor/riggers, Watervliet Arsenal will run utilities to first points of connection. However, if the installation instructions supplied by the contractor are incomplete or insufficiently detailed, installation work will stop and the contractor will be required to dispatch a service engineer.
Installation will resume upon his arrival and continue under his guidance.
NOTE: If installation instructions, foundation drawings and electrical and hydraulic schematics are not delivered at or before the times specified (see 3.1.14), the Government reserves the right to forestall delivery and/or final acceptance testing of the machine by an amount of time equal to the delay in receipt of instructions, drawings or schematics.
3.1.18.2 Work to be Performed by the Contractor. This project is classified as a turn-key with the contractor being responsible for all costs and work associated with the installation unless otherwise stated. The Contractor shall be solely responsible for all costs associated with skidding and shipment, rigging, and installation at WVA. Once an installation site is identified by Watervliet personnel and if required, a foundation is constructed, the contractor or their designated third party shall install the machines. Contractor personnel shall arrange for rigging services to off load the machines and contractor personnel shall be on-site at Watervliet when the machines arrive and are off loaded to supervise the placement of the machines on the installation site by the rigging service. Outside rigging services should be advised that only certified grade 8 chains are permitted to be used at the Arsenal and that all rigging slings must be tagged and certified for the weights being lifted. In most cases no Arsenal forklift services and/or Arsenal personnel will be available for the installation. Only propane powered forklifts are permitted and must also be equipped with a roll cage. Operators of forklifts shall have and be able to produce valid forklift licenses. Arsenal overhead pendant cranes (within load capacities) can be used by the contractor/rigging service for the installation.
The contractor shall provide written certification to the WVA representative that all contractor/rigger personnel are qualified, through either formal training or experience per OSHA, to operate pendant controlled overhead cranes. Contractor personnel shall also adhere to the WVA requirements to wear OSHA approved non-tinted safety glasses with side shields and safety shoes while in the manufacturing shop areas. The contractor shall ensure they bring all equipment/material necessary for the installation of the machine(s). Watervliet does not have the resources to provide such material. Crane capacity within each building is limited (2, 5, 10 or 15 tons) and therefore if not adequate then the contractor will need to provide alternate means necessary for the installation. Specific building crane capacities where the equipment is to be installed should be verified with the WVA technical POC.
Once the machines are positioned and rough leveled by the contractor, WVA personnel will run utilities to the machine. Watervliet must be provided with sufficient time to accomplish these connections. The contractor, through his own service personnel shall be fully responsible for the startup and testing of the machines, conduct any acceptance tests specified in sections 3 & 4 and perform the required on-site training. The contractor and the service personnel shall remain until the machine activation and testing have been successfully completed. Under no circumstances should the contractor plan on gratuitous Arsenal assistance for diagnosis, troubleshooting or repair of the equipment during activation and testing. Should such activity prove necessary, it shall be the contractor's responsibility to provide the appropriate labor and materials. If the contractor chooses to request Arsenal assistance in lieu of providing his own resources, the request will be reviewed by the Technical POC who shall reserve the right to impose a charge for the assistance. Approvals, even on a charge basis, should not be taken for granted since there is no guarantee that appropriate Arsenal personnel will be readily available.
In such cases, the Arsenal will not be held responsible for delays in acceptance of the equipment resulting from non-availability of Arsenal personnel or Arsenal-furnished equipment.
IMPORTANT: Under normal circumstances the contractor will be allowed to work as long as is desired during normal work days. Contractor work outside Watervliet’s normal work days cannot be guaranteed. Watervliet is on a condensed work schedule. Normal work hours/days for this schedule are four 9-hour workdays (Friday off) one week and four 9-hour days, one 8-hour day (Friday) the following week. Contractor work on the Friday off and weekends cannot be guaranteed. Contractor’s classified as foreign nationals may further restrict work hours and days available.
If the contractor requests Watervliet Arsenal to ship misc. material via UPS, FedEx or by other similar carrier then the contractor shall provide their carrier account number for this purpose.
3.2 Machine Specific Requirements: The new CMM’s shall include the following characteristics:
3.2.1 Required Characteristics:
Overall:
Overall width (W)……………………………… 1450 mm (57.09”) Overall length (L)……………………………… 2965 mm (116.73”) Overall height (H)……………………………... 2646 mm (115.98”) Machine weight……………………………….. 2382 kg (5,251 lb)
Measuring Range:
X axis………………………………………….. 900 mm (35.43”) Y-axis…………………………………………. 2000 mm (78.74”) Z-axis………………………………………….. 800 mm (31.5”)
Table:
Usable surface table width ………………... 1340 mm (52.8”) or more Usable surface table length ……………….. 2710 mm (106.7”) or more Allowable part weight………………………. 1800 kg (3968 lb) Table Height from floor………………………. 29” to 29.5”
Dynamic Performance:
Move velocity…………………………………. 516 mm/s (max. 3D volumetric speed) Move acceleration…………………………….. 1700 mm/s2 (max. 3D volumetric accel.)
Measurement Accuracy (ISO 10360):
Size Measurement Error (µm)…………… 1.8 + 3.0 L / 1000 Probing Error …………………………..…….. 1.8 µm Scanning Probing Error……………………….. 2.9 µm / 45 sec
3.2.2 Other Required Characteristics:
3.2.2.1 Machine Features:
a) DC24X Control System, Adaptive Scanning Capable, controller shall be compatible with the following Renishaw touch probes: TP2, TP20, TP6, TP6A, TP7M and SP25M
b) Next Jog Box system with cradle and cradle holder
c) Thermal Compensation
d) Renishaw PH10MQ quill mounted motorized probe head
e) Kinematic Joint Adaptor (PAA1)
f) Renishaw TP-20 touch Trigger Probe (Total quantity of 4 standard force modules)
g) Probe Qualification Sphere
h) Demonstration Block
i) Z-212 Granite Surface Plate Cleaner
3.2.2.2 Computer & Software Features:
a) Dell Precision T5810 (or current model)
• Processor – Intel Quad Core Xeon E5-1620 v3 (3.5GHz, 10MB)
• RAM – 8GB DDR4, 2133 MHz
• HD – 900 GB
• DVD – 16X DVD +/-RW SATA, Data Only
• Graphics – 4GB nVidia K2200
• Mouse – Dell MS111 USB optical mouse
• OS – Windows 7 Professional (64 bit OS)
• LAN – 1 Onboard Gigabit Ethernet Adapter (Plus 1 additional Gigabit NIC)
• Ports – 2 Serial Ports
b) Dell P2214H 21.5” Flat Panel LCD Widescreen Monitor (or current model)
c) HP Officejet 4630 e-All-In-One Printer (or current model)
d) Computer Workstation Table (L x W x H) 47.2” x 26.8” x 33.5”
e) PC-DMIS CAD++ with AutoPath Software Bundle
3.2.2.3 Other Features (for each machine):
a) ACR3 4-port rack - Auto change rack for probe or extension bars with Renishaw autojoint (A5036-0005)
b) MRS Kit #2 - 600mm MRS rail, MRS feet (Qty.2), 125mm legs (Qty. 4), step back adapters (Qty. 2)
c) FCR25 flexible changing rack with triple-port for MRS rack with PA25-SH stylus holder port adapter (Qty. 3) and PA25-20 stylus holder port adapter (Qty. 3)
d) MCR20 Module Changing Rack for use with TP20, six port module changer. To include two modules per machine (1 standard and 1 medium) and the required PC-DMIS tip changing software
e) Additional TP20 Stylus Modules(1 low, 2 medium, and 2 extended force)
f) Stylus Kit (M3) for SP25M, SM25-2, SH25-2
g) Rayco Clamping Plate, Aluminum, R20-325675-50
h) Custom Kit 50 – Magnetic Clamping Kit
i) TP 7M Probe Body (A-1073-0121)
j) M4 Stylus Kit for use with TP-7M (A-5000-7829):
Item QTY
M4 Ø5 x 75mm Styli 2 M4 Ø6 x 75mm Styli 2 M4 Ø8 x 75mm Styli 1 M4 Ø6 x 150mm Styli 1 M4 Ø8 x 300mm Styli 1
3.2.2.4 Other Features (one each):
a) Multi-CMM Air Dryer/Filter
b) PC-DMIS CAD++ offline software license
c) One large tray (R20_LCT 20 x 21.5, ¼-20)
d) Three small trays (R20_SCT 17, ¼-20)
e) SP25-2 Scanning Entry Level Kit #2 - SP25M and SM25-2 allow for scanning of 50-
105mm range stylus extensions
f) SP25-3 Scanning Entry Level Kit #3 – SP25M and SM25-3 allow for scanning of 120-
200mm range stylus extensions
g) Stylus Holders – 2 each SH25-2, 2 each SH25-3
h) Additional Styli:
Item Qty
M2 Ø0.5 x 20mm Carbide Stem Styli 2 M2 Ø0.7 x 20mm Carbide Stem Styli 2 M2 Ø1 x 20mm Carbide Stem Styli 4 M2 Ø1.5 x 20mm Carbide Stem Styli 2 M2 Ø1.5 x 30mm Carbide Stem Styli 2 M2 Ø2 x 30mm Carbide Stem Styli 4 M2 Ø2 x 40mm Carbide Stem Styli 4 M2 Ø3 x 50mm Carbide Stem Styli 4 M2 Ø3 x 30mm Ceramic Stem Styli 3 M2 Ø4 x 30mm Ceramic Stem Styli 3 M2 Ø3 x 50mm Ceramic Stem Styli 4 M2 Ø4 x 50mm Ceramic Stem Styli 3 M2 Ø5 x 50mm Ceramic Stem Styli 3 M2 Ø4 x 50mm Carbon Fiber Stem Styli 3 M2 Ø5 x 50mm Carbon Fiber Stem Styli 3 M2 Ø4 x 75mm Carbon Fiber Stem Styli 2 M2 Ø6 x 75mm Carbon Fiber Stem Styli 2 M2 30mm Ceramic Extension 3 M2 40mm Ceramic Extension 3 M2 50mm Ceramic Extension 3 M2 Carbon Fiber Stylus Tool 2 M3 Ø3 x 50mm Carbide Stem Styli 2 M3 Ø3 x 50mm Ceramic Stem Styli 2 M3 Ø4 x 50mm Ceramic Stem Styli 2 M3 50mm Ceramic Extension 2
i) HP-L 10.6 Laser Scanner with Angular Offset Adapters, HR-R (DCC) Warm-up post, HR-R 65mm Post, HH-A Electronics Warming Station, IS1-2 Tactile Scanning Adaptation Kit, and PC-DMIS HP-L Software Module
3.2.3 Diagnostic Capabilites: The CMM shall be equipped with diagnostic capabilities covering the controller, interface, and overall machine. As a minimum, diagnostic capability shall include the display of a message or other meaningful indicator to identify any fault that causes the machine to be inoperable. This includes electrical/electronic faults and also any mechanical faults that result in operation of a safety interlock
3.3 Requirements for Demonstration of Conformance:
3.3.1 Certification of Completeness: Prior to machine shipment, the contractor shall provide written certification that the machine is complete and has been visually examined for appearance, workmanship, maintainability and completeness, including all specified systems, accessories, markings, safety devices, geometric and accuracy requirements.
3.3.2 Test of Conformance for Accuracies: Prior to machine shipment and after machine installation, the machines will be tested for all stated dimensional and operational accuracies as specified in 3.2.1 per ISO 10360. Tests will be conducted using standard measurement equipment where applicable. A written record of the examination will accompany the test that details the attributes tested and the results of the test. The contractor shall provide a copy of the test results to the Watervliet Arsenal POC prior to shipment.
3.3.3 Additional Testing: During machine installations, Watervliet Arsenal personnel may elect to have the contractor demonstrate or verify the machines’ compliance with any requirement in this specification.
3.3.4 Testing Provisions: All equipment, tooling, and materials required during machine testing and installation shall be supplied by the contractor.
4 Warranty: Upon final acceptance of the machines a Standard Commercial Warranty shall commence for duration of One Year, to include as a minimum, parts and labor for the duration of the warranty, at no cost to the Government. The one year period shall commence from the date of notification by the Contracting Officer of the final acceptance.
Final acceptance is defined as the act of an authorized representative of the Government, by which the Government assumes ownership of existing supplies/equipment and/or approves specific services rendered, as partial or complete performance of the contract (i.e. testing, training, and delivery of all required technical documentation). This requirement does not waive any warranty requirement of FAR 52.212-4.
5 Preservation, Packaging and Delivery Instructions: The contractor shall utilize standard commercial methods of preservation and packaging appropriate for machine tools and acceptable to commercial carriers. As a minimum, all areas susceptible to damage from exposure to the elements shall be preserved and/or packed to prevent damage. The machine and equipment shall be blocked, braced and skidded to prevent damage during transport and to facilitate handling, loading and unloading. The contractor shall be responsible for insuring that the machine and equipment are delivered to Watervliet Arsenal in good condition and shall retain this responsibility until the machine and equipment are off loaded at Watervliet Arsenal by the responsible parties.
Note: If any special lifting devices are recommended by the contractor to facilitate handling, such devices shall be shipped with the machine. They will be returned to the contractor upon completion of use at the Arsenal, at no expense to the contractor.
6 Instructions to Offerors: The purpose of these instructions is to provide prospective contractors with additional guidance relative to the structure of their technical proposals.
6.1 Contents of Proposals. All proposals must as a minimum include:
A. A complete statement of compliance (see 6.2) B. MSDS sheets
Note: Failure of any proposal to meet the above minimum requirements may render that proposal technically unacceptable. In addition, brochures, illustrations, narratives, drawings and sketches pertinent to the equipment being offered are permissible and are encouraged. Offerors are cautioned, however, to screen such materials carefully before submission to insure that they will not introduce any of the deficiencies described in the request for technical proposals.
Generalized information not pertinent to the equipment being offered is not encouraged and will not be evaluated.
6.2 Offeror's Statement of Compliance. Enclosed with the specification is a prepared form entitled "Offeror's Statement of Compliance". The left hand margin of this form lists, in order, the number of all the paragraphs in the specification containing requirements which must be addressed by offerors. To the immediate right of each paragraph number are two blocks headed "comply" and "non-comply". The entry of "x" or a check mark is required in one of these two blocks for each numbered paragraph of the form. However, offerors are advised that the checking of the "non-comply" blocks for any paragraph will result in non-acceptance of the offer unless explanation is provided and deemed acceptable by the Arsenal. For this reason, space is also provided on the form for offerors to explain any entry of "non-comply". This explanation should point out the degree of, and reason for, non-compliance, and it should explain what is being offered as an equal or better alternative to the specified requirements. Furthermore, checking of “comply” without providing the pertinent supporting information is not acceptable.
A thorough explanation of how compliance will be achieved is required. Space provided for comply/non-comply explanations on the form is limited. If additional space is required, a separate sheet may be used to continue the explanation. If such a continuation sheet is used, it should refer to the paragraph number being explained. Offerors are further advised that although specified requirements are mandatory, they normally stem from performance needs at the Arsenal. Thus, when an offeror must take exception to a specified requirement he/she is well advised to provide as much information as possible about what he/she is offering so that the Arsenal can judge the impact, if any, upon the equipment’s performance, as well as the builders adherence to proper design practices. On the lower right hand corner of each page of the form is a signature block. Each page of the form should be signed by the offeror or his/her authorized representative.
Attachment A – Acceptable Lubricants, Hydraulic Fluids, Oils, and Coolants
Type Manufacturer Coolant, Water Soluble Oil Van Straten #826-C Coolant, Water Soluble, “No Dye” Concentrate Must Be Clear Andersol “C”
Cutting Fluid Sulfur and Chlorine Additive 285°F min. Flash Point 18-22 Centistokes at 100°F Viscosity (Gun Drilling)
MIL-C-46149 Grade 4 *
Cutting Fluid Sulfur and Chlorine Additive 30°F Pour Point, 285°F min. Flash Point 40-44 Centistokes at 100°F Viscosity (Honing)
MIL-C-46149 Grade 5 *
Cutting Fluid Sulfurized Fatty And Mineral Oils Federal Test Method Std. No. 791 WVTPD 1051 *
Cutting Oil Sulfurized Fatty Mineral VV-C-850 Type II Grade D Cutting Oil, Non-Staining, Mineral Oil Base 400°F Flash Point Mobilmet Omicron
Cutting Oil (Broach Oil) Product Sol # 336 Grease Almaplex 1275 (Medium Grade) Grease, Automotive and Artillery MIL-G-10924-C * Grease MOLYKOTE BR-2 PLUS Hydraulic Fluid, Petroleum Base MIL-H46001-D * Lubricant Center Saver Cimcool Lubricating Oil, General Purpose, Corrosion & Salt Spray Resistant 39.8-55 Centistokes at 130°F
MIL-L-3150
Lubricating Oil, Light Spindle Velocite #10 (Sunvis #911) MIL-L-46014 *
Oil, Hydraulic, Light Socony Mobil DTE-24 Oil, Gear Mobil #636 Oil, Hydraulic DTE #26 Oil, Magnetic Particle Insp. DD-F-87935 (NORPAR 13) Oil, Hydro Treated Paraffinic Mineral Oil
Pillsbury Circlene
FG #21
Oil, Reciprocating Taco 10/40 Oil, Fatty (Lard Oil) MIL-F-46148 * Additive Oil, Extreme Pressure Lubrizol #5345
* Approved industry/commercial equivalents will be acceptable substitutes
Attachment B – Class I Ozone Depleting Substances
CFC-11 (cfcl3) CFC-213 (c3f3cl5) Trichlorofluoromethane Pentachlorotrifluoropropane
CFC-12 (cf2cl2) CFC-214 (c3f4cl4) Dichlorodifluoromethane Tetrachlorotetrafluoropropane
CFC-113 (c2f3cl3) CFC-215 (c3f5cl3) Trichlorotrifluoroethane Trichloropentafluoropropane
CFC-114 (c2f4cl2) CFC-216 (c3f6cl2) Dichlorotetrafluoroethane Dichlorohexafluoropropane
CFC-115 (c2f3cl) CFC-217 (c3f7cl) Monochloropentafluoroethane Monochloroheptafluoropropane
CFC-13 (cf3cl) Halon - 1211 (cf2clbr) Chlorotrifluoromethane Bromochlorodifluoromethane
CFC-111 (c2fcl5) Halon - 1301 (cf3br) Pentachlorofluoroethane Bromotrifluoromethane
CFC-112 (c2f2cl4) Halon - 2402 (c2f4br2) Tetrachlorodifluoroethane Dibromotetrafluoroethane
CFC-211 (c3fcl7) Halon – 1011 (ch2BrCl) Heptachlorofluoropropane Bromochloromethane
CFC-212 (c3f2cl6) Halon –1202 (CBr2F2)
Methyl Chloroform (chci3) CCL4
Carbon Tetrachloride
Methyl Chloroform (c2h3cl3)
| 1 Scope: |
| 1.1 Procurement of More Than One Machine: |
| 2 Applicable Standards and Publications: |
| 3 Requirements: |
| 3.1 General Requirements |
| 3.2 Machine Specific Requirements: |
| 3.2.1 Required Characteristics: |
| 3.2.2 Other Required Characteristics: |
| 3.2.2.1 Machine Features: |
| 3.2.2.2 Computer & Software Features: |
| 3.2.2.3 Other Features (for each machine): |
| 3.2.2.4 Other Features (one each): |
3.2.3 Diagnostic Capabilites:
| 3.3 Requirements for Demonstration of Conformance: |
| 3.3.1 Certification of Completeness: |
| 3.3.2 Test of Conformance for Accuracies: |
| 3.3.3 Additional Testing: |
| 3.3.4 Testing Provisions: |
| 4 Warranty: |
| 5 Preservation, Packaging and Delivery Instructions: |
| 6 Instructions to Offerors: |
File details come from the government source that posted it. Updated .