W911PT16Q0018-0002.pdf

PDF 28 KB Posted

Attached to
Chromium Nitride Coating of Spindles Federal contract opportunity
Solicitation number
W911PT16Q0018
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

Amendment 2

View the file

Other files for this federal contract opportunity

Other files attached to Chromium Nitride Coating of Spindles, newest first.
File Type Posted
W911PT16Q0018-0003.pdf PDF
16Q0018.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16H1F520900ZE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is to clarify the monthly production quantities. The anticipated monthly quantity is 40 units per month and the maximum is 60 units per month.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Jan-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911PT-16-Q-0018

X 9B. DATED (SEE ITEM 11)

18-Dec-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Jan-2016

CODE

ARMY CONTRACTING COMMAND-WARREN (WVA)

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

W911PT 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911PT-16-Q-0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0002

The CLIN extended description has changed from:

The application of high-density chromium nitride (CrN) final protective finish to M776 howitzer spindles per Drawing and QAP 11583063 of MMI Spindle and per QASP.Estimated quantity of 250 with two option quantities of 250 and 200 for a total estimated of 700. - QUANITIES ARE NOT GUARANTEEDDD Form 2345 is required in order to receive drawings and subsequent award of contract.Estimated minimum 40 to maximum of 80 spindles to be completed per month. Confirmation that contractor CAN complete Chromium Nitride of 80 spindles per month:

____YES ____NO If no, state how many_____per monthQuote must include a turnaround time per lot size. Lot Size Minimum of 10 per lot. Turnaround Time= ___________Calendar DaysTesting will be completed by Benet Laboratories located on The Watervliet Arsenal and Certification for completed shall be provided by the contractor.

FOB is Destination- All return shipping cost must be included in contractor proposal.TOTAL COST PER LOT of 10________ UNIT PRICE______RETURN SHIPPING COST PER LOT OF 10_________________Certificate of Conformance is required with every return shipment per COC CN5. Wage Determination WD 15-4143 (Rev.-1) dated 12/08/2015 applies and is attached. Simplified Past Performance Evaluation will be a criteria for award. Ref:

52.0000-4851 SIMPLIFIED PAST PERFORMANCE EVALUATION (NOV 1995) (ACC-WRN (WVA) included in this solicitation.Technical POC/COR is Greg Ciraulo 518-266-4563.EH14UWV506EHM7 OPERATION

ORDER 6508AAS# 152020021

To:

The application of high-density chromium nitride (CrN) final protective finish to M776 howitzer spindles per Drawing and QAP 11583063 of MMI Spindle and per QASP.Estimated quantity of 250 with two option quantities of 250 and 200 for a total estimated of 700. - QUANITIES ARE NOT GUARANTEEDDD Form 2345 is required in order to receive drawings and subsequent award of contract.Estimated minimum 40 to maximum of 60 spindles to be completed per month. Confirmation that contractor CAN complete Chromium Nitride of 40-60 spindles per month: ____YES ____NO If no, state how many_____per monthQuote must include a turnaround time per lot size.

Lot Size Minimum of 10 per lot. Turnaround Time= ___________Calendar DaysTesting will be completed by Benet Laboratories located on The Watervliet Arsenal and Certification for completed shall be provided by the contractor. FOB is Destination- All return shipping cost must be included in contractor proposal.TOTAL COST PER LOT of 10________ UNIT PRICE______RETURN SHIPPING COST PER LOT OF 10_________________Certificate of Conformance is required with every return shipment per COC CN5. Wage Determination WD 15-4143 (Rev.-1) dated 12/08/2015 applies and is attached. Simplified Past Performance Evaluation will be a criteria for award. Ref: 52.0000-4851 SIMPLIFIED PAST PERFORMANCE EVALUATION (NOV 1995) (ACC-WRN (WVA) included in this solicitation.Technical POC/COR is Greg Ciraulo 518-266-

4563.EH14UWV506EHM7 OPERATION ORDER 6508AAS# 152020021.

CLIN 0004

The application of high-density chromium nitride (CrN) final protective finish to M776 howitzer spindles per Drawing and QAP 11583063 of MMI Spindle and per QASP..Estimated quantity of 250 - QUANITIES ARE NOT

GUARANTEED. Period of performance will vary according to production dates. DD Form 2345 is required in order to receive drawings and subsequent award of contract.Estimated minimum 40 to maximum of 80 spindles to be completed per month. Confirmation that contractor CAN complete Chromium Nitride of 80 spindles per month:

____YES ____NO If no, state how many_____per monthQuote must include a turnaround time per lot size. Lot Size Minimum of 10 per lot. Turnaround Time= ___________Calendar DaysTesting will be completed by Benet Laboratories located on The Watervliet Arsenal and Certification for completed shall be provided by the contractor.

FOB is Destination- All return shipping cost must be included in contractor proposal.TOTAL COST PER LOT of 10________ UNIT PRICE______RETURN SHIPPING COST PER LOT OF 10_________________Certificate of Conformance is required with every return shipment per COC CN5. Wage Determination WD 15-4143 (Rev.-1) dated 12/08/2015 applies and is attachedSimplified Past Performance Evaluation will be a criteria for award. Ref:

52.0000-4851 SIMPLIFIED PAST PERFORMANCE EVALUATION (NOV 1995) (ACC-WRN (WVA) included in this solicitation.Technical POC/COR is Greg Ciraulo 518-266-4563.EHOPERATION ORDER AAS#

To:

The application of high-density chromium nitride (CrN) final protective finish to M776 howitzer spindles per Drawing and QAP 11583063 of MMI Spindle and per QASP.Estimated quantity of 250 - QUANITIES ARE NOT GUARANTEED. Period of performance will vary according to production dates. DD Form 2345 is required in order to receive drawings and subsequent award of contract.Estimated minimum 40 to maximum of 60 spindles to be completed per month. Confirmation that contractor CAN complete Chromium Nitride of 40-60 spindles per month:

____YES ____NO If no, state how many_____per monthQuote must include a turnaround time per lot size. Lot Size Minimum of 10 per lot. Turnaround Time= ___________Calendar DaysTesting will be completed by Benet Laboratories located on The Watervliet Arsenal and Certification for completed shall be provided by the contractor.

FOB is Destination- All return shipping cost must be included in contractor proposal.TOTAL COST PER LOT of 10________ UNIT PRICE______RETURN SHIPPING COST PER LOT OF 10_________________Certificate of Conformance is required with every return shipment per COC CN5. Wage Determination WD 15-4143 (Rev.-1) dated 12/08/2015 applies and is attachedSimplified Past Performance Evaluation will be a criteria for award. Ref:

52.0000-4851 SIMPLIFIED PAST PERFORMANCE EVALUATION (NOV 1995) (ACC-WRN (WVA) included in this solicitation.Technical POC/COR is Greg Ciraulo 518-266-4563.EHOPERATION ORDER AAS#.

CLIN 0006

The application of high-density chromium nitride (CrN) final protective finish to M776 howitzer spindles per Drawing and QAP 11583063 of MMI Spindle and per QASP..Estimated quantity of 200 - QUANITIES ARE NOT GUARANTEED. Period of performance will vary according to production dates. DD Form 2345 is required in order to receive drawings and subsequent award of contract.Estimated minimum 40 to maximum of 80 spindles to be completed per month. Confirmation that contractor CAN complete Chromium Nitride of 80 spindles per month:

____YES ____NO If no, state how many_____per monthQuote must include a turnaround time per lot size. Lot Size Minimum of 10 per lot. Turnaround Time= ___________Calendar DaysTesting will be completed by Benet Laboratories located on The Watervliet Arsenal and Certification for completed shall be provided by the contractor.

FOB is Destination- All return shipping cost must be included in contractor proposal.TOTAL COST PER LOT of 10________ UNIT PRICE______RETURN SHIPPING COST PER LOT OF 10_________________Certificate of Conformance is required with every return shipment per COC CN5. Wage Determination WD 15-4143 (Rev.-1) dated 12/08/2015 applies and is attachedSimplified Past Performance Evaluation will be a criteria for award. Ref:

52.0000-4851 SIMPLIFIED PAST PERFORMANCE EVALUATION (NOV 1995) (ACC-WRN (WVA) included in this solicitation.Technical POC/COR is Greg Ciraulo 518-266-4563.EHOPERATION ORDER AAS#

To:

The application of high-density chromium nitride (CrN) final protective finish to M776 howitzer spindles per Drawing and QAP 11583063 of MMI Spindle and per QASP..Estimated quantity of 200 - QUANITIES ARE NOT GUARANTEED. Period of performance will vary according to production dates. DD Form 2345 is required in order to receive drawings and subsequent award of contract.Estimated minimum 40 to maximum of 60 spindles to be completed per month. Confirmation that contractor CAN complete Chromium Nitride of 60 spindles per month:

____YES ____NO If no, state how many_____per monthQuote must include a turnaround time per lot size. Lot Size Minimum of 10 per lot. Turnaround Time= ___________Calendar DaysTesting will be completed by Benet Laboratories located on The Watervliet Arsenal and Certification for completed shall be provided by the contractor.

FOB is Destination- All return shipping cost must be included in contractor proposal.TOTAL COST PER LOT of 10________ UNIT PRICE______RETURN SHIPPING COST PER LOT OF 10_________________Certificate of Conformance is required with every return shipment per COC CN5. Wage Determination WD 15-4143 (Rev.-1) dated 12/08/2015 applies and is attachedSimplified Past Performance Evaluation will be a criteria for award. Ref:

52.0000-4851 SIMPLIFIED PAST PERFORMANCE EVALUATION (NOV 1995) (ACC-WRN (WVA) included in this solicitation.Technical POC/COR is Greg Ciraulo 518-266-4563.EHOPERATION ORDER AAS# .

(End of Summary of Changes)

File details come from the government source that posted it. Updated .