SAFETY REVIEW W911N224R0015.pdf

PDF 232 KB Posted

Attached to
Crane Maintenance
Solicitation number
W911N224R0015-0002
Issued by

About this file

This document is a memorandum from the Letterkenny Army Depot (LEAD) Safety Office reviewing the Mobile Crane Fleet Maintenance contract, solicitation number W911N224R0015-0002.

The memorandum outlines several safety requirements for the contractor performing work under this contract at LEAD. These include complying with LEAD's Safety Management System, OSHA regulations, DoD/Army safety standards, and reporting any injuries or incidents to the LEAD Safety Office within 24 hours. The contractor is also responsible for being familiar with all applicable industry consensus standards prior to beginning work. If the contract requirements change, the proponent must submit the changes to the LEAD Safety Office for review.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

LETTERKENNY ARMY DEPOT

1 OVERCASH AVENUE

CHAMBERSBURG, PENNSYLVANNIA 17201

MEMORANDUM FOR: Directorate of Public Works

ATTN: Kara Stitely, Contracting Officer Representative

SUBJECT: Safety Office review of Mobile Crane Fleet Maintenance contract

1. Purpose: To document the LEAD Safety Offices review of the subject contract.

2. If there is no PWS for the contract or the PWS has already been approved, the contractor shall be notified of the following items.

a. The contractor is reminded that LEAD maintains a Safety Management

System (SMS) and is ISO 45001 certified.

b. 5-1) can be found at https://www.letterkenny.army.mil/visitors.html c.

comply with their contents.

d. Any site work ay LEAD shall be completed in accordance with applicable

OSHA, DoD, Army, LEAD 385-4. General information requirements related to safety and fire prevention included in section 1.4.5 of the PWS.

e. As a federal installation, additional requirements other than OSHA apply to contractors performing work at LEAD. Examples include full conformance to ANSI standards, NFPA standards, and other consensus standards for the industry covered by the subject contract. It is the responsibility of the contractor to be familiar with all applicable standards prior to starting any regulation LEAD-R 385-1 prior to beginning any work at LEAD.

f. Any injuries, accidents, or Near Misses that occur shall be reported to the

LEAD safety office within 24 hours of the event regardless of if the event is reported to another Safety Management System (SMS).

3. If the requirements for this contract change, the proponent of the contract must submit all changes to the LEAD Safety Office for review.

4. The POC for this memo is Mr. Vernon Lowe, Safety Manager, LEAD Safety Office, AMLD-SAF, (717) 267-9324, email vernon.f.lowe2.civ@mail.mil.

File details come from the government source that posted it. Updated .