W911N223R0011.pdf
PDF 778 KB Posted
- Solicitation number
- W911N2-23-R-0011
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Synopsis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911N223R0011 11-May-2023
b. TELEPHONE NUMBER
717-267-5372
8. OFFER DUE DATE/LOCAL TIME
03:00 PM 05 Jun 2023
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911N29. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
DAVID T. SEROTKIN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25G1Q2234R001
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC-RSA-LEAD
1 OVERCASH AVENUE, ATTN: CCAM-MLK, BLDG 2S
CHAMBERSBURG PA 17201-4150
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W800AF 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DIRECTORATE OF PUBLIC WORKS
DEBRA MILLER
LETTERKENNY ARMY DEPOT
DPW AMLD-ELX
ONE OVERCASH AVE BLDG 370 ASRS DOOR 18
CHAMBERSBURG PA 17201-4150
TEL: 717-267-8538 FAX:
717-2679834FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
7.5 million
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF46
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
SOLICITATION NOTES
1. System for Award Management (SAM): In accordance with FAR 4.1102, Offerors shall be registered in the SAM database in order to be eligible for contract award. No award will be made to an Offeror not registered. Registration can be accomplished at https://www.sam.gov/portal/public/SAM/. Registration in this database shall remain active.
2. Annual Representations and Certifications: In accordance with FAR 4.1201, Offerors shall complete electronic annual representations and certifications within SAM as part of required registration. Registration in this database shall remain active and can be accessed at tps://www.sam.gov/portal/public/SAM/.
3. Questions: Questions regarding this solicitation shall be submitted to the Contracting Officer, in writing, at least 5 calendar days prior to the closing date. Questions submitted after this time will be answered at the discretion of the Contracting Officer. The Contracting Officer for this action is Laura Beuhler (laura.j.buehler.civ@army.mil). The Contract Specialist for this action is David Serotkin (david.t.serotkin.civ@army.mil).
4. Award without Discussions: The Government intends to award without discussions, offerors should submit their best prices in their initial offer. If FAR Provision 52.212-2, Evaluation-Commercial Items, is included, Offerors must submit all information requested therein in order for the Government to determine technical acceptability.
5. Amendments: The Offeror shall submit to the Contracting Officer signed copies of all amendments issued to this solicitation. Failure to comply may cause your proposal to be rejected.
6. Payment: Payment for this action will be made by Electronic Funds Transfer (EFT) through the Defense Finance and Accounting Services (DFAS) utilizing Wide Area Work Flow (WAWF). See 252.232-7006 for more information.
7. Period for Acceptance of Offers: The Offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers.
8. Type of Contract: This is a hybrid Firm Fixed Price and Time and Materials Requirements type contract. All quantities are estimated and individual delivery orders shall be issued citing specific quantities and delivery dates.
9. Proposals: Proposals shall be signed by an authorized individual in accordance with FAR 4.102, Contractor’s
Signature. Failure to comply may cause your proposal to be rejected. Offerors should mark each page of their proposal as "Proprietary Information" if they want it treated as Proprietary Information under the Procurement Integrity Act.
10. FOB Destination: Unless otherwise stated in the solicitation, Offerors shall provide FOB Destination prices.
11. AMC-Level Protest Program: Prior to submitting an agency protest, it is preferable that you first attempt to resolve your concerns with the responsible contracting officer. However, you may also file a protest to the Headquarters (HQ), Army Materiel Command (AMC). The HQ AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accountability Office (GAO), or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 35 calendar days from filing. To be timely, protests must be filed within the periods specified in Federal Acquisition Regulation 33.103. If you want to file a protest under the HQ AMC-Level Protest Program, the protest must request resolution under that program and be sent to the address below.
Headquarters U.S. Army Materiel Command Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000
12. Period of Performance: The Period of Performance indicated in the solicitation is estimated and will be adjusted to coincide with the actual award date.
13. Contact Information: A Contracting Officer Representative (COR) will be appointed at the time of award. The successful Offeror will be furnished the COR name and contact information at the time of contract award.
14. Wage Determination: WD 2015-4253, Revision 22, dated 12-27-2022 and is hereby incorporated. Wage Determination can be viewed at http://www.wdol.gov.
15. Site Visit Information: One site visit is scheduled for 25 May 2023 at 10:30 A.M. Site visit attendance is urged but is not mandatory; however, failure to attend a site visit shall not be a reason for price increases to the contract after contract award. Submit the names of all attendees to David Serotkin, Contract Specialist (email:
david.t.serotkin.civ@army.mil). The site visit consists of access to one building. Contract Specialist will email a separate visitor request form for badging information. Submit all information no later than 22 May 2023 at 11:00 A.M. Offerors who do not submit the visitor request form, with all required information, will not be given access to the site. Details on the site visit will be provided to those who submit attendee information. Limit of 2 people per company to attend the site visit. All attendees will meet at 2S, Directorate of Contracting, 1 Overcash Avenue, Letterkenny Army Depot, Chambersburg, PA. Offerors are required to obtain a visitor’s pass from the Badge Office, Building 2 South, located beside the Contracting Office, prior to arriving at the Contracting Office. Please allow at least 45 minutes for this process. You must provide a current picture identification, vehicle registration and proof of insurance to obtain a pass. The documentation you receive with your visitor pass must remain with you during the site visit and returned after the site visit and prior to departure of the Depot. **NOTE: FOR THIS SITE VISIT, PLEASE WEAR STEEL TOE SHOES AND SAFETY GLASSES, PER BASE PROTOCOL.
16. In an effort to reduce paperwork and cost, all proposals shall be submitted electronically to the Contract Specialist. Delivery of hard copies of offers, modifications or cancellations of offers will not be accepted. Facsimile offers, modifications or cancellations of offers will not be accepted. Email all information to David Serotkin, Contract Specialist:
david.t.serotkin.civ@army.mil.
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
FOR
Recycling Equipment Preventive Maintenance and Repair
General:
1.0 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, quality control and other items and non-personal services necessary to perform preventive maintenance and repair as defined in this PWS, except as specified in Paragraph 3.0 as Government Furnished. The contractor shall perform to the standards in this contract.
1.1 Background: The equipment is used in conjunction with the Recycling Program. The equipment that will be covered is as follows:
Max Pak HCE-60-FE-8 BE# 5358A SN# 06077129 Max Pak MP4800 Conveyor BE# 5358B Max Pak 2 Ram Model# MP245010 SN# 05119515 Max Pak MP4800 Slider Bed Conveyor Accent 470 Wire Tier SN# 11807
1.2 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and two 12-month option years. The Period of Performance is identified in the solicitation and contract.
1.3 General Information:
1.3.1 Recognized Holidays: The following are recognized US holidays and the date for each can be found at the following website: http://www.opm.gov/Operating_Status_Schedules/fedhol/Index.asp. The contractor shall not perform services on these days:
1.3.1.1 New Year’s Day – January 1
1.3.1.2 Martin Luther King, Jr.’s Birthday – third Monday in January
1.3.1.3 President’s Day – third Monday in February
1.3.1.4 Memorial Day – last Monday in May
1.3.1.5 Juneteenth – June 19
1.3.1.6 Independence Day – July 4
1.3.1.7 Labor Day – first Monday in September
1.3.1.8 Columbus Day – second Monday in October
1.3.1.9 Veteran’s Day - November 11
1.3.1.10 Thanksgiving Day – fourth Thursday in November
1.3.1.11 Christmas Day – December 25
1.3.1.12 When an observed holiday falls on a Tuesday or Thursday, the Depot regularly schedules a closure on the corresponding Monday or Friday.
1.3.2 Place and Performance of Services: The contractor shall provide services between the hours of 0600 - 1530 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.3.3 Security Requirements: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility, or area. Contractor and all associated subcontractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.3.3.1 Physical Security: The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.3.3.2 AT Level 1 Awareness Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:
https://www.letterkenny.army.mil/ctrresources/.
1.3.3.3 iWATCH Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility, or area. The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the CO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award. iWATCH training is available at the following website:
https://www.letterkenny.army.mil/ctrresources/.
1.4.3.4. OPSEC Training: Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter. OPSEC Level 1 training is available at the following website:
https://www.letterkenny.army.mil/ctrresources/.
1.4.3.5. For contractors that do not require CAC but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.3.4 Conservation of Utilities: The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
1.3.5 Special Qualifications: Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified and qualified for the position in which they will be serving. NOTE: The Government does not provide training to contractors.
1.3.6 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with Federal Acquisition Regulations Subpart 42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the Contacting Officer will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.3.7 Contract Manager (CM): The contactor shall provide a CM who shall ensure performance under this contract.
The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.3.8 Identification of Contractor Employees: All contact personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The contractor shall also ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. All contractor personnel will be required to obtain and wear badges and wear company specific clothing that identifies them as a contractor in the performance of this contract.
1.3.9 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5.
The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI.
The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.3.10 Threat Awareness Reporting Program (TARP): For all contractors with security clearances. Per AR 381-12, Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.
2.0 Definitions and Acronyms:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 Contracting Officer’s Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 Deliverable: Anything that can be physically delivered and includes non- manufactured things such as meeting minutes or reports.
2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.8 Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 Quality Control: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 Work Day: The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 Work Week: Monday through Friday, unless specified otherwise.
2.2 Acronyms:
AFARS Army Federal Acquisition Regulation Supplement CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List
DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation KO Contracting Officer OCI Organizational Conflict of Interest ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the facilities, equipment, materials, and/or services listed below:
3.1 Facilities: The Government will not furnish the necessary workspace for the contractor staff to provide the support outlined in this PWS to include desk space, telephones, computers, and other items necessary to maintain an office environment.
3.2 Equipment: None
3.3 Materials: None
3.4 Services: None
3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract.
4.0 Contractor Furnished Property, Materials, Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
5.0 Requirements: The contractor shall:
5.1 Repair: The contractor shall provide situational repair services to the Government owned equipment listed below.
Max Pak HCE-60-FE-8 BE# 5358A SN# 06077129 Max Pak MP4800 Conveyor BE# 5358B Max Pak 2 Ram Model# MP245010 SN# 05119515 Max Pak MP4800 Slider Bed Conveyor Accent 470 Wire Tier SN# 11807
5.1.1 Quote for Services: The contractor shall provide a repair service quote to the COR via email and receive approval via email for all repair services before the services are started. Once the quote is approved the COR shall notify the contractor to start.
5.1.1.1 The quote shall include a breakdown of labor and materials that shall be used for the repair, of the equipment that shall be worked on.
5.1.2 Upon notification from the COR the contractor shall have 48 hours to access and provide a quote for repairs for the damaged piece(s) of equipment. Notification by the COR shall be verbal, followed by an email from the COR.
Upon quote approval the contractor shall have 24 hours to start the repair process unless the lead time for parts prohibits the vendor to start immediately. Lead time must be stated on the quote.
5.1.3 Once repair services commence the Contractor shall continue with the repair in a continuous effort until the equipment is determined to be operable. Any repairs involving the equipment listed above are considered to be critical to the everyday operational duties.
5.1.4 Deductions to invoiced amounts due to lack of contract compliance on behalf of the Contractor shall require approval by the KO. Invoiced amounts for services that have not been rendered or have been rendered but are not in compliance with the standards set forth within this PWS shall not be paid.
5.2 Parts: The contractor is responsible for supplying all parts for the equipment listed in paragraph 5.1. The parts shall be itemized out on all quotes and invoices.
5.2.1 Repair parts shall be the manufacture’s recommended parts or equal. If the part is an “or equal” part, it shall be stated on the quote as such and subjected to approval.
5.3 Preventive Maintenance (PM): Quarterly, PM shall be performed on all equipment listed in paragraph 5.1. The cost for the PM shall include the labor and materials needed to perform the PM. The PM shall consist of, at a minimum the original equipment manufacturer (OEM) recommendations.
5.3.1 Reports: The Contractor shall provide a report to the COR via email within one (1) business day after every service call. The report, at a minimum shall consist of the following: a checklist of the items that were completed, date, number of technicians and hours use to service the piece, signature of a Government representative, a list of materials/parts used and a narrative of any actions taken while repairing the equipment.
5.4 Waste: Waste generated by any repair or PM service shall be taken off depot and disposed of properly by the contractor.
6.0 . Applicable Publications:
6.0 Publications applicable to this PWS are listed below: Documents applicable to this PWS are listed below as well as stated within the PWS. These documents are mandatory and the Contractor is obligated to follow them.
Supplements and amendments to mandatory publications shall be considered to be in the full force and the responsibility of the Contractor. It is the Contractor’s responsibility to ensure that all mandatory publications are posted and up-to-date. It is the Contractor’s responsibility to ensure that all mandatory publications are addressed to all employees working on depot. Manuals are subject to change throughout the life of the contract. The contractor shall follow the latest addition to any regulation, pamphlet, law, or memorandum.
6.1 Army Regulation and Pamphlets: All Army Regulations apply to any work performed on Depot and can be found at the following website http://www.whs.mil/library/mildoc.html. A nonexclusive list includes AR 385-10 Army Safety Program, and AR 385-55 Prevention of Motor Vehicle Accidents.
6.1.1 Safety and Health Plan: The Contractor shall develop, document, and implement an effective safety and health program for this contract, including a corporate safety and health plan. This corporate safety and health plan shall be submitted to the KO for approval within thirty (30) days after contract award. A task/site specific accident prevention plan shall be developed/adapted to the services specified on the individual task orders.
6.1.2 Environmental Compliance: The Contractor shall comply with all Federal, State, and local regulations covering environmental protection. In case of a conflict among these laws and regulations, the most stringent law or regulation shall apply. If a Federal, State, or regulatory agency assesses any fine, penalty, or fee against the Government that is attributable to Contractor noncompliance with any environmental law or regulation, the Contractor shall indemnify the Government for the amount of the fine and other Government costs attributable to the violation (e.g., the cost of cleaning up a hazardous waste spill). In the event of Contractor noncompliance with any applicable environmental law or regulation, the KO shall determine whether the Government or the Contractor is responsible for abating or correcting the violation. This provision is not intended in any way to waive the http://www.whs.mil/library/mildoc.html
Government’s rights under any other provision of this contract. The Contractor shall fully comply with current and future regulations, plans and changes.
6.2 Other Manuals: All LEAD Regulations, Pamphlets, and Memorandums apply to any work performed on Depot.
A nonexclusive list includes:
6.3 OSHA Part 1910 - Occupational Safety and Health Standards can be found at http:// www.osha.gov/index.html under Regulations / Standards.
6.4 Lead Pamphlet 385-4 Requirements for Security, Safety and Fire Prevention for Contractor’s Performing Work on LEAD.
6.5 LEAD Regulation 385-1 LEAD Safety and Occupational Health Program, Chg 4.
6.6 Other Rules and Regulations: The Contractor shall comply with all applicable federal, state, and local laws, executive orders, rules and regulations applicable to its performance under this contract.
6.6.1 Local Rules and Regulations: The contractors, subcontractors, suppliers and their employees shall be governed by local, state and federal Laws along with installation rules and regulations. All the installation requirements are in the current issue of the pamphlet LEAD Reg 385-4 entitled "Security, Safety, and Fire Prevention for Contractors Performing Work on Letterkenny Army Depot, Chambersburg, PA”, Pamphlet 385-1 “LEAD Safety & Occupational Health Program”, and any additional requirements determined necessary by the KO shall be strictly complied with. Provisions for unescorted access into buildings are outlined in Chapter 2 of AR 190- 16.
6.6.2 Permits: The Contractor is responsible for identifying, obtaining, and renewing all permits from federal, state, local, or installation agencies to carry out the requirements specified in this contract or detailed on an individual task order.
6.6.3 Fire Regulations: The Contractor and their employees shall be required to comply with all installation regulations on fire prevention which are in effect or may be put in effect during performance of work under this contract. It is the Contractor’s responsibility to ensure that all mandatory publications are addressed to all employees working on depot.
6.6.4 Safety Requirements: The Contractor shall abide by all rules, regulations, and pamphlets concerning safety on depot posted by local, state, and federal agencies. It is the Contractor’s responsibility to ensure that all mandatory publications are addressed to all employees working on depot. Disregarding safety regulations in the industrial area mandatory publications are posted and up-to-date. It is the Contractor’s responsibility to ensure that all mandatory publications are addressed to all employees working on depot. Manuals are subject to change throughout the life of the contract. The contractor shall follow the latest addition to any regulation, pamphlet, law, or memorandum.
Publication (Chapter / Page) Date of Publication Mandatory or
Advisory
Website
Army Regulations various Mandatory http://www.whs.mil/librar y/mildoc.htm
AR 385-10 Army Safety Program 27 November 2013 Mandatory http://armypubs.army.mi l/epubs/pdf/R385_10.P DF
AR 385-55 Prevention of Motor Vehicle Accidents 12 March 1987 Mandatory
AR 200-1 Environmental Protection and Enhancement
13 December 2007 Mandatory http://www.rubiconplann ing.com/ar-200-1.html
AR385-40 Accident Reporting and Records 18 March 2015 Mandatory www.army.mil/usapa/ep ubs/pdf/p385_40.pdf
LEAD Regulations, Pamphlets, and Memorandums various Mandatory None http://www.osha.gov/index.html http://www.whs.mil/librar http://armypubs.army.mi/ http://www.army.mil/usapa/ep
Lead Pamphlet 385-4 Requirements for Security, Safety and Fire Prevention for Contractor’s
Performing Work on LEAD
15 March 2011 Mandatory None
LEAD Regulation 385-1 LEAD Safety and Occupational Health Program, Chg 4, 18 April 2014 Mandatory None
OSHA Part 1910- Occupational Safety and Health Standards
Various Mandatory https://www.osha.gov/in dex.html
FAR Subpart 9.5
March 2005 Mandatory https://www.acquisition.
gov/sites/default/files/cu rrent/far/pdf/FAR.pdf Vehicle code of the
Commonwealth of Pennsylvania Various Mandatory http://www.dmv.state.pa
.us/vehicle_code/index. shtml
Standards of Conduct 14 NOV 2011 Mandatory https://www.federalregis ter.gov/articles/2011/11/ 14/2011-
29090/standards-of- conduct Pennsylvania Air Pollution Control Act
(PA Code, Title 35, Chapter 23- Air Pollution) Mandatory http://www.actionpa.org/ ordinances/35ps4012.ht ml ED 12088 Federal Compliance with Pollution
Control Standards 13 October 1978 Mandatory
Title 25 PA Code Environmental Resources Chapter 260-270
10 January 2009 Mandatory http://www.pacode.com/ secure/data/025/chapter 260a/chap260atoc.html
40 Code of Federal Regulations (CFR) 10 June 2016 Advisory http://www.epa.gov/laws regs/search/40cfr.html
TECHNICAL EXHIBIT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
PWS
Paragraph
Task Performance Standard AQL Surveillance Method / By Whom
5.1 The contractor shall perform
situational Repairs within the established timeframes.
The contractor shall perform restorative Repairs within the established timeframes 98% of the time.
2% failure to perform restorative Repairs within the established timeframes each month.
Periodic Inspection - COR shall review monthly work order logs.
5.3-5.3.1 The contractor shall perform preventive maintenance IAW the PWS.
The contractor shall perform preventive maintenance 99% of the time.
1% failure to perform preventive maintenance.
Periodic Inspection - COR shall review monthly work order logs.
5.4 Generated waste removal The contractor shall perform waste removal 100% of the time.
0% failure to perform waste removal.
Periodic Inspection http://www.osha.gov/in http://www.dmv.state.pa/ http://www.actionpa.org/ http://www.pacode.com/ http://www.epa.gov/laws
TECHNICAL EXHIBIT 2
Deliverables Schedule
Deliverable Frequency Number of Copies Medium/Format Submit To
1.3.3 - Security Requirements Upon request 1 Electronic Submission COR/DRSK
1.3..3.2 – AT
Training
Within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance
1 Electronic Submission KO/COR/DRSK
1.3.3.3 - iWATCH Training
Within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance
1 Electronic Submission KO/COR/DRSK
1.3.5 - Special Qualifications With Solicitation Proposal
1 Electronic Submission KO
1.3.7 - Contract Manager At the time of award 1 Electronic Submission KO
1.3.9 - Organizational Conflicts of Interest
Immediately once awarded
1 Electronic Submission KO
5.1.1 - Quotes for repair services
Upon request 1 Electronic submission COR
5.3.1 – Reports Within 1 day after service
1 Electronic submission COR
6.1.1 - Safety and Health Plan 30 days from time of award
1 Electronic Submission KO/COR
W911N223R0011
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 4 Lot Quarterly Inspection & Maintenance
FFP
IAW attached PWS listed under 5.0 REQUIREMENTS. (UNIT OF ISSUE LOT = QUARTERS) The contractor shall provide Quarterly Inspection & Maintenance repair services to the Government owned equipment listed below:
Max Pak HCE-60-FE-8 BE# 5358A SN# 06077129 Max Pak MP4800 Conveyor BE# 5358B Max Pak 2 Ram Model# MP245010 SN# 05119515 Max Pak MP4800 Slider Bed Conveyor Accent 470 Wire Tier SN# 11807 FOB: Destination
PURCHASE REQUEST NUMBER: W25G1Q2234R001
PSC CD: J039
ESTIMATED
NET AMT
ITEM NO SUPPLIES/SERVICES EST.
UNIT UNIT PRICE EST. AMOUNT
0002 24 Lot Repair Labor
T&M IAW attached PWS listed under 5.1 REPAIR, This CLIN shall only be used for Labor used to make repairs. **Payment will be made IAW actual quantity of hours performed and approved by the Contracting Officer's Representative
(COR). (UNIT OF ISSUE LOT = HOURS)
FOB: Destination
TOT ESTIMATED PRICE
CEILING PRICE
UNIT UNIT PRICE EST. AMOUNT
0003 10 Lot Repair Parts
T&M This CLIN shall only be used for parts used for repairs by the Contractor under CLIN 0002, IAW attached PWS listed under 5.2. Parts. Do not quote on this CLIN. Estimated total amount is $6,850.00. Parts shall be billed as actuals.
LOT = REPAIR
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001 4 Lot OPTION Quarterly Inspection & Maintenance
FFP
IAW attached PWS listed under 5.0 REQUIREMENTS. (UNIT OF ISSUE LOT = QUARTERS) The contractor shall provide Quarterly Inspection & Maintenance repair services to the Government owned equipment listed below:
Max Pak HCE-60-FE-8 BE# 5358A SN# 06077129 Max Pak MP4800 Conveyor BE# 5358B Max Pak 2 Ram Model# MP245010 SN# 05119515 Max Pak MP4800 Slider Bed Conveyor Accent 470 Wire Tier SN# 11807 FOB: Destination
UNIT UNIT PRICE EST. AMOUNT
1002 24 Lot OPTION Repair Labor
T&M IAW attached PWS listed under 5.1 REPAIR, This CLIN shall only be used for Labor used to make repairs. **Payment will be made IAW actual quantity of hours performed and approved by the Contracting Officer's Representative
(COR). (UNIT OF ISSUE LOT = HOURS)
FOB: Destination
UNIT UNIT PRICE EST. AMOUNT
1003 10 Lot OPTION Repair Parts
T&M This CLIN shall only be used for parts used for repairs by the Contractor under CLIN 1002, IAW attached PWS listed under 5.2. Parts. Do not quote on this CLIN. Estimated total amount is $7,540.00. Parts shall be billed as actuals.
LOT = REPAIR
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001 4 Lot OPTION Quarterly Inspection & Maintenance
FFP
IAW attached PWS listed under 5.0 REQUIREMENTS. (UNIT OF ISSUE LOT = QUARTERS) The contractor shall provide Quarterly Inspection & Maintenance repair services to the Government owned equipment listed below:
Max Pak HCE-60-FE-8 BE# 5358A SN# 06077129 Max Pak MP4800 Conveyor BE# 5358B Max Pak 2 Ram Model# MP245010 SN# 05119515 Max Pak MP4800 Slider Bed Conveyor Accent 470 Wire Tier SN# 11807 FOB: Destination
UNIT UNIT PRICE EST. AMOUNT
2002 24 Lot OPTION Repair Labor
T&M IAW attached PWS listed under 5.1 REPAIR, This CLIN shall only be used for Labor used to make repairs. **Payment will be made IAW actual quantity of hours performed and approved by the Contracting Officer's Representative
(COR). (UNIT OF ISSUE LOT = HOURS)
FOB: Destination
UNIT UNIT PRICE EST. AMOUNT
2003 10 Lot OPTION Repair Parts
T&M This CLIN shall only be used for parts used for repairs by the Contractor under CLIN 2002, IAW attached PWS listed under 5.2. Parts. Do not quote on this CLIN. Estimated total amount is $8,300.00. Parts shall be billed as actuals. Lot
= REPAIR
FOB: Destination
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 15-JUN-2023 TO
14-JUN-2024
N/A DIRECTORATE OF PUBLIC WORKS
DEBRA MILLER
LETTERKENNY ARMY DEPOT
DPW AMLD-ELX
ONE OVERCASH AVE BLDG 370 ASRS
DOOR 18
CHAMBERSBURG PA 17201-4150
717-267-8538 FOB: Destination
W800AF
0002 POP 15-JUN-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 15-JUN-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 15-JUN-2024 TO
14-JUN-2025
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 15-JUN-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 15-JUN-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 15-JUN-2025 TO
14-JUN-2026
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 15-JUN-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 15-JUN-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions JUN 2020 52.203-6 Alt I Restrictions On Subcontractor Sales To The Government
(JUN 2020) -- Alternate I
NOV 2021
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-21 Basic Safeguarding of Covered Contractor Information
Systems
NOV 2021
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities
NOV 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.212-1 Instructions to Offerors--Commercial Products and Commercial Services
NOV 2021
52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services
DEC 2022
52.217-5 Evaluation Of Options JUL 1990 52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.219-8 Utilization of Small Business Concerns OCT 2022 52.219-28 Post-Award Small Business Program Rerepresentation OCT 2022 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor -- Cooperation with Authorities and Remedies DEC 2022 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-41 Service Contract Labor Standards AUG 2018 52.222-43 Fair Labor Standards Act And Service Contract Labor
Standards - Price Adjustment (Multiple Year And Option Contracts)
AUG 2018
52.222-50 Combating Trafficking in Persons NOV 2021 52.222-55 Minimum Wages for Contractor Workers Under Executive
Order 14026
JAN 2022
52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-6 Drug-Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
JUN 2020
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
JUN 2020
52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
JUN 2020
52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
JUN 2020
52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
NOV 2021
52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.242-13 Bankruptcy JUL 1995
52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.245-1 Government Property SEP 2021 52.245-9 Use And Charges APR 2012 52.246-4 Inspection Of Services--Fixed Price AUG 1996 52.246-6 Inspection--Time-And-Material And Labor-Hour MAY 2001 52.247-34 F.O.B. Destination NOV 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
SEP 2022
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information
JAN 2023
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
JAN 2023
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation
DEC 2019
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2023
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7001 Buy American And Balance Of Payments Program--Basic JAN 2023 252.225-7012 Preference For Certain Domestic Commodities APR 2022 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2022 252.244-7000 Subcontracts for Commercial Products or Commercial
Services
JAN 2023
252.247-7023 Transportation of Supplies by Sea JAN 2023
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Lowest Price, Technically Acceptable. The Government intends to evaluate and award a contract without discussions with offerors.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
ADDENDUM TO FAR 52.212-2, BASIS OF AWARD:
A. General Information:
1. The basis of award will be the Lowest Priced, Technically Acceptable offer. Proposals that are unrealistic in terms of Technical Requirements or Price may be rejected at any time during the evaluation process. Offerors must receive a rating of Technically Acceptable in all factors/subfactors in order for their overall proposal to be determined Technically Acceptable.
2. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, and technical requirements.
3. The Government intends to make award without discussions, unless the Contracting Officer determines that discussions are necessary. Offerors should provide their most favorable prices in their initial offers.
B. Non-Price Evaluation Factors and Subfactors:
1. Factor 1- Past Performance. The Offerors shall provide three recent and relevant Government or private sector projects completed within the past three years that demonstrates the ability to perform the requirements in this solicitation. The Offeror shall identify the contract title, contract number, dollar value, client name and address, location of work, point of contact with telephone number.
2. Factor 2 - Certificates or licenses. Offeror shall provide proof they are certified to work on all the different types of recycling equipment.
C…