W25G1Q1154R001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to post concerns & responses about the Solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911N221Q0040
X 9B. DATED (SEE ITEM 11)
24-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Aug-2021
CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC-RSA-LEAD
1 OVERCASH AVENUE, ATTN: CCAM-MLK, BLDG 2S
CHAMBERSBURG PA 17201-4150
W911N2 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911N221Q0040
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
CONCERNS & RESPONSES
The following concerns were raised in regards to four paragraphs within A-A-52520_B (HARDWOOD -
FLOORBOARDS AND PLATFORMS FOR MILITARY VEHICLES (METRIC)).
Paragraph 2.1.1 - Hardwood states, "Hardwoods shall conform to NHLA Rules for the Measurement and inspection of hardwood and cypress lumber."
Concern: We do not ask for a cert when we buy lumber. Nor is a cert required.
Response: There is no cert required for buying the lumber. However according to A-A-52520, Paragraphs 2.4 and 4.2, the contractor is responsible for inspecting the wood received, to ensure that it meets all of the sub-paragraphs of 2.4. So just certify that this was done.
Paragraph 2.2 - Moisture content states, "... dried to a maximum moisture content of 15 percent or less at time of treatment. This shall be verified when tested to ASTM D4444."
Concern: We make these with White Oak or Ash Kiln dried lumber with 6% moisture content.
You cannot pressure treat a piece of finished lumber, as it blows it up with all the liquid forced into the wood.
Response: We understand that you need a low moisture content to pressure treat a piece of finished lumber.
That is why the spec states 15% or less at time of treatment. If the contractor knows that all their dried lumber has a 6% moisture content, they must have tested it to come up with that number. All they need to do is present the data showing that they tested it to ASTM D4444 and it has 6% moisture content.
Paragraph 2.3 - Preservative treatment states, “Hardwood preservative treatment shall be monitored, tested, and checked using the appropriate procedures of AWPA C2.”
Concern: AWPA C2 & AWPA P8 no longer exist.
Response: AWPA C2 may no longer exist, however the paragraph just states to “monitor, test and check using the procedures of AWPA C2”. I am sure the procedures called out in AWPA C2 still exists. If not, the contractor should have their own internal procedures of preservative treatment. The contractor’s Quality Department should have documented evidence that the procedures were followed.
Paragraph 4.2 - Responsibility for inspection states, “The contractor is responsible for the performance of all inspections (examinations and tests).”
Concern: What you buy from us will be I/A/W all the current specifications for Sawn Products and treated and painted I/A/W the correct material including final finish CARC Paint I/A/W Mil DTL 53039 Type IX.
Response: In regards to the “current specifications for Sawn Products” I would assume they are similar to A-A- 52520. MIL-DTL-53039 has nothing to do with inspecting and pressure treating the raw lumber to be used for this contract, A-A-52520 does.
W911N221Q0040
(End of Summary of Changes)