Rain_Test_Recirc_Project_Attachment_B.pdf
PDF 15 KB Posted
- Solicitation number
- W911N2-18-Q-0025
About this file
Rain Test Recirculation Project Drawing B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOL_AMEND_W911N218Q00250005.pdf | ||
| Pictures.pdf | ||
| SOL_Amend_W911N218Q00240004.pdf | ||
| SOL_AMEND_W911N218Q00250003.pdf | ||
| SOL_AMEND_W911N2-18-Q-0025-0002.pdf | ||
| DSC01012.jpg | JPG image | |
| DSC01014.jpg | JPG image | |
| DSC01013.jpg | JPG image | |
| DSC01015.jpg | JPG image | |
| SOL_AMEND_W911N2-18-Q-0025-0001.pdf | ||
| North_Wash_Bay.jpg | JPG image | |
| Equip_Room_North.jpg | JPG image | |
| Equip_Room_South.jpg | JPG image | |
| South_Wash_Bay.jpg | JPG image | |
| Equip_Room_North_Closeup.jpg | JPG image | |
| Wash_Bay_Sump_Pit_Area.jpg | JPG image | |
| Equip_Room_South_Closeup.jpg | JPG image | |
| PD_W911N218Q0025.pdf | ||
| SOL_W911N218Q0025.pdf | ||
| Rain_Test_Recirc_Proj_-_Attchmt_A.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Holding Tank
Rain Test
Reclaim Tank 850
Gallons
(Supplied by
Letterkenny)
Collection
Trench
Control Panel & Pumps
Rain Test Reclaim
Skid- Pump, Bag
Filter Controls
Gantry Wash
Rain Test Recirculation Project
Bulk Head Inlet Festoon Hoses
Feed Gantry Wash System
Gantry Rails
RSP
Fresh Water
Makeup
1. Rain Test is fed by rinse pump to Gantry wash unit.
2. Water from the test accumulates in the wash bay trench.
3. A manual controlled ball valve is closed using a T-Bar.
4. Water from the trench is diverted to the rain test sump pit.
5. The rain test sump pump will pump water from the sump thorough the bag filter and into the 850 gallon rinse water reclaim tank. Oxygen will be added on a continuous basis to the rain test reclaim tank.
6. The reclaim tank will feed to the rinse water pump on the pump skid.
7. A fresh water makeup line will feed the loop as necessary based on a 20 gallons/minute max flow rate from the rinse pump.
7. Controls will keep the pumps working to recirculate water in the loop as long as the rain test is in operation.
**8. Float control valves in the sump pit and the rain test reclaim tank will be utilized to balance incoming and outgoing flow for the loop.
Bag Filter
Rinse Pump
Sump Pump
Gantry Rails
Gantry Path
Gantry Path Gantry Path
Gantry Path
Attachment B
5-17-2018
O2
Generator
Spray
Nozzles
Spray
Nozzles
Concrete sump is supplied by
Letterkenny
Rain Test
Sump
**8
**8
| Rain Test Recirc Project Attachment B.vsd |
| Page-1 |
File details come from the government source that posted it.