W911N2-17-Q-0004.pdf
PDF 352 KB Posted
- Attached to
- A/C Generator Maintenance
- Solicitation number
- W911N2-17-Q-0004
About this file
Solicitation for AC Generator Maintenance
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911N2-17-Q-0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911N2-17-Q-0004 11-Jan-2017
b. TELEPHONE NUMBER
717-267-5821
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 26 Jan 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911N29. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
TOM R. ALBRECHT
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25G1Q6236R001
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC
1 OVERCASH AVENUE, ATTN: CCAM-ALK, BLDG 2S
CHAMBERSBURG PA 17201-4150
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
717-2679834FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$7,500,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF51
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W911N2-17-Q-0004
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 40 Each
CLEAN, INSPECT, AND TEST A/C GENERATOR
FFP
IAW Paragraph 5 of the attached Performance Work Statement.
FOB: Destination
PURCHASE REQUEST NUMBER: W25G1Q6236R001
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 1 Each
CONTRACTOR MANHOUR REPORTING
FFP
IAW Paragraph 5.4 of the attached Performance Work Statement.
UNIT UNIT PRICE ESTIMATED AMOUNT
1001 40 Each
OPTION OY1 CLEAN, INSPECT, & TEST A/C GENERATOR
FFP
IAW Paragraph 5 of the attached Performance Work Statement.
UNIT UNIT PRICE ESTIMATED AMOUNT
1002 1 Each
OPTION OY1 CONTRACTOR MANHOUR REPORTING
FFP
IAW Paragraph 5.4 of the attached Performance Work Statement.
UNIT UNIT PRICE ESTIMATED AMOUNT
2001 40 Each
OPTION OY2 CLEAN, INSPECT, & TEST A/C GENERATOR
FFP
IAW Paragraph 5 of the attached Performance Work Statement.
UNIT UNIT PRICE ESTIMATED AMOUNT
2002 1 Each
OPTION OY2 CONTRACTOR MANHOUR REPORTING
FFP
IAW Paragraph 5.4 of the attached Performance Work Statement.
UNIT UNIT PRICE ESTIMATED AMOUNT
3001 40 Each
OPTION OY3 CLEAN, INSPECT, & TEST A/C GENERATOR
FFP
IAW Paragraph 5 of the attached Performance Work Statement.
UNIT UNIT PRICE ESTIMATED AMOUNT
3002 1 Each
OPTION OY3 CONTRACTOR MANHOUR REPORTING
FFP
IAW Paragraph 5.4 of the attached Performance Work Statement.
UNIT UNIT PRICE ESTIMATED AMOUNT
4001 40 Each
OPTION OY4 CLEAN, INSPECT, & TEST A/C GENERATOR
FFP
IAW Paragraph 5 of the attached Performance Work Statement.
UNIT UNIT PRICE ESTIMATED AMOUNT
4002 1 Each
OPTION OY4 CONTRACTOR MANHOUR REPORTING
FFP
IAW Paragraph 5.4 of the attached Performance Work Statement.
SOLICITATION NOTES
1. System for Award Management (SAM): In accordance with FAR 4.1102, Offerors must be registered in the SAM database in order to be eligible for contract award. No award will be made to an Offeror not registered.
Registration can be accomplished at https://www.sam.gov/portal/public/SAM/. Registration in this database must be kept current.
2. Annual Representations and Certifications: In accordance with FAR 4.1201, Offerors shall complete electronic annual representations and certifications within SAM as part of required registration. Registration in this database must be kept current and can be accessed at https://www.sam.gov/portal/public/SAM/.
3. Questions: Questions regarding this solicitation shall be submitted to the Contracting Officer, in writing, at least 5 calendar days prior to the closing date. Questions submitted after this time will be answered at the discretion of the Contracting Officer. The Contracting Officer for this action is Gary Weir, gary.r.weir.civ@mail.mil.
4. Award without Discussions: The Government intends to award without discussions; therefore Offerors should submit their best prices in their initial offer. If FAR Provision 52.212-2, Evaluation-Commercial Items, is included, Offerors must submit all information requested therein in order for the Government to determine technical acceptability.
5. Amendments: The Offeror shall submit to the Contracting Officer signed copies of all amendments issued to this solicitation. Failure to comply may cause your proposal to be rejected.
6. Payment: Payment for this action will be made by Electronic Funds Transfer (EFT) through the Defense Finance and Accounting Services (DFAS) utilizing Wide Area Work Flow (WAWF). See 252.232-7006 for more information.
7. Period for Acceptance of Offers. The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers.
8. Set- Aside: The proposed contract is 100% set-aside for small business concerns.
9. FOB Destination: Unless otherwise stated in the solicitation, Offerors shall provide FOB Destination prices.
10. Contact Information : A Technical Point of Contact (TPOC) will be appointed at the time of award. The successful Offeror will be furnished the COR name and contact information at the time of contract award.
11. Contract Type: The Government anticipates awarding a requirements contract from this solicitation.
12. Pre Award Survey: A Pre-Award Survey may be conducted to examine the offeror's technical ability, management structure, financial capability, accounting systems, security controls/clearances, labor resources, performance record, and ability to meet required schedules.
13. Insurance: Pursuant to the requirements of FAR clause 52.228-5 Insurance-Work on a Government Installation, the contractor shall obtain and maintain at least the following kinds of insurance and minimum liability coverage during any period of contract performance:
a. Workmen's Compensation and occupational disease coverage as required by law except that, if this contract is to be performed in a state which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory. The required Workmen's Compensation Insurance shall extend to cover employers' liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
b. Comprehensive General Liability Insurance in the minimum limit of $500,000 per occurrence for bodily injury liability.
c. Comprehensive Automotive Liability Insurance with minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury, and a minimum limit of $20,000 per occurrence for property damage.
14. AMC Level Protest Program: Prior to submitting an agency protest, it is preferable that you first attempt to resolve your concerns with the responsible contracting officer. However, you may also file a protest to the Headquarters (HQ), Army Materiel Command (AMC). The HQ AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accountability Office (GAO), or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 35 calendar days from filing. To be timely, protests must be filed within the periods specified in Federal Acquisition Regulation 33.103. If you want to file a protest under the HQ AMC-Level Protest Program, the protest must request resolution under that program and be sent to the address below.
Headquarters U.S. Army Materiel Command Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000 Fax: (256) 450-8840 or email usarmy.redstone.usamc.mbx.protests@mail.mil
The AMC-level protest procedures are found at:
www.amc.army.mil/amc/commandcounsel.html
If internet access is not available, contact the contracting officer or HQ, AMC to obtain the AMC-Level Protest Procedures.
PWS
PERFORMANCE WORK STATEMENT
FOR
Service to Perform Rotor and Stator Resistance and Winding Insulation for the Electric Power Plant (EPP) Generators as Supplied
1.0 General:
1.1 Scope: The Contractor shall provide all services, labor, facilities, equipment, tools, parts, materials, and shipping costs to accomplish National Maintenance Work Requirement (NMWR) 9-6115-669-3, dated 1 Dec 2002, rotor and stator resistance and winding insulation testing of the Electric Power Plant (EPP) III Generator and re-insulate the rotor and stator components. The Lechmotoren (Original Equipment Manufacturer (OEM)) Generators are used on the EPP III Generator Sets, shall be cleaned, tested, and re-insulated per the listed NMWR. A thorough knowledge and understanding of the technical data and testing criteria concerning the end item and components will be required. The generator components will be used at Letterkenny Army Depot (LEAD) in Chambersburg, Pennsylvania.
1.2 Background: Letterkenny Army Depot continues to be the Center of Industrial and Technical Excellence for refurbishing and recertifying the PATRIOT Missile System. The EPP III Generator Sets are the power source for the PATRIOT Missile System. The EPP consists of two 150 kilowatt diesel engines with 400 hertz, 3-phase generators which are interconnected through the power distribution unit.
1.3 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and four 12-month option years. The Period of Performance reads as follows:
1.3.1 Base Year: 1 March 2017 to 28 February 2018
1.3.2 Option Year One: 1 March 2018 to 28 February 2019
1.3.3 Option Year Two: 1 March 2019 to 29 February 2020
1.3.4 Option Year Three: 1 March 2020 to 28 February 2021
1.3.5 Option Year Four: 1 March 2021 to 28 February 2022
1.4 General Information:
1.4.1 Quality Control (QC): The contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QC program is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary. After acceptance of the QC Plan, the contractor shall obtain the KO’s (KO) acceptance in writing of any proposed changes to its QC system.
1.4.2 Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).
1.4.2.1 Finished assets returned from the contractor will be inspected by LEAD’s QC Personnel for compliance with the QASP. The tested generator components shall seamlessly integrate with the next higher assembly, the EPP III Generator Set. Upon QC Inspection at LEAD, there shall be no loose components, and the insulation shall be evenly applied and complete. A failed QC Inspection shall be cause for rejection, return and rework by the Contractor at no additional cost to the Government.
1.4.2.2 Finished assets will be accepted only if they are found to be in compliance with the requirements given in this PWS and with the Applicable Publications in Section 6.0.
1.4.3 Recognized Holidays: The contractor shall not have to perform this service on recognized US holidays. The following are recognized US holidays:
1.4.1.1 New Year’s Day: January 1st
1.4.1.2 Martin Luther King, Jr.’s Birthday: Third Monday in January
1.4.1.3 President’s Day: Third Monday in February
1.4.1.4 Memorial Day: Last Monday in May
1.4.1.5 Independence Day: July 4th
1.4.1.6 Labor Day: First Monday in September
1.4.1.7 Columbus Day: First Monday in October
1.4.1.8 Veteran’s Day: November 11th
1.4.1.9 Thanksgiving Day: Third Thursday in November
1.4.1.10 Christmas Day: Third Thursday in December
1.4.4 Place and Performance of Services: Pick-up and delivery shall be at Bldg 350, Letterkenny Army Depot between the hours of 7 AM and 2 PM on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.
1.4.5 Security Requirements: Contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Risk Management or Security Office. Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 Physical Security: The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.5.2 OPSEC Training: Per AR 530-1, Operations Security, new contractor employees and associated sub-contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. Level 1 OPSEC training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.
1.4.5.3 iWATCH Training: The contractor and all associated sub-contractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the TPOC or contracting officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each affected contractor employee and subcontractor employee, to the TPOC and contracting officer within 15 calendar days after completion of training. iWATCH training is available on the Letterkenny Army Depot homepage – www.lead.army.mil
1.4.5.4 AT Level I Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html
1.4.6 Safety and Environmental: The contractor shall conduct operations in accordance with applicable safety and environmental laws, regulations, and standards. There is a possibility of the presence of chromium in the coating that may require special personal protective equipment and/or disposal methods. The Government will not be responsible for contractor operations not carried out in accordance with applicable safety and environmental laws, regulations, and standards. Any surcharges related to safety or environmental compliance requirements must be included in the contractor’s per-item price.
1.4.7 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with Federal Acquisition Regulations Subpart 42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the Contacting Officer will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.8 Contractor Points of Contact: The Contractor shall submit three (3) points of contact (POC): a Program Manager (PM), a technical POC, and a contractual POC and shall provide telephone number, fax number, and email address for each of the POCs. These names shall be designated in writing to the COR. The PM shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.4.9 Identification of Contractor Employees: All contact personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The contractor shall also ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed.
2.0 Definitions and Acronyms:
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.
2.2 ACRONYMS:
AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CARC Chemical Agent Resistant Coating CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation KO Contracting Officer
OCI Organizational Conflict of Interest ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the facilities, equipment, materials, and/or services listed below:
3.1 Materials: The Government will provide EPPIII A/C Generator to be serviced.
3.2 Services: The Government will pack the components using standard commercial methods as agreed upon with the Contractor. The Government will stage the package for pick-up by the Contractor.
3.3. The COR will monitor the contractor’s performance by physical inspection and validated customer complaints.
Any defects or work not accomplished will be brought to the attention of the contractor Point of Contact (POC).
4.0 Contractor Furnished Property, Materials, Equipment (CFP/M/E):
4.1 General: The contractor shall furnish everything required to perform the services described in Paragraph 1.1 and Section 5.0.
4.2 Materials: The Government will provide the required insulation paint to be placed on the A/C generator components after they are tested.
4.3 Services: The Contractor shall be responsible for pick-up and delivery of all parts and components involved with this service.
5.0 Requirements: The Contractor shall perform to specifications outlined herein according to the National Maintenance Work Requirement (NMWR) 9-6115-669-3, dated 1 Dec 2002, rotor and stator resistance and winding insulation testing of the Electric Power Plant (EPP) III Generator and re-insulate the rotor and stator components as specified below:
Table 1:
Generator
Vendor P/N NSN Expected Yearly QTY
Lechmotoren Generator 130.03.0063 6115-12-341-6789 40 EA.
5.1 The contractor shall perform cleaning and drying of the generator components to the NMWR requirements.
5.2 The contractor shall perform testing of the generator components to the NMWR specifications.
5.3 The contractor shall complete the required Tables of the NMWR to document all testing results.
5.4 The contractor shall re-insulate the rotor and stator with the government supplied insulation paint and shall provide an even coverage of the rotor and stator windings.
5.5 The contractor shall pack each tested generator components in single unit with protection from transportation damage and weather and include the testing results with the generator components. The contractor shall return the unit with applicable delivery and shipping information to ensure the unit is received according to the COR’s instructions. The COR shall inspect all returned units upon receipt.
5.6 The Contractor shall use calibrated (per the meter OEM recommendations) meters capable of measuring the milliohms and insulation test and insulation tests with high voltage. The calibration certification shall be kept current during the length of this contract.
5.7 Delivery and Packaging:
5.7.1 The EPPIII components shall be picked-up, serviced and delivered back to the customer within ten (10) working days after the contractor is notified by a receipt of a LEAD Delivery Order that the items are available for pickup.
5.7.2 If a preferred day of the week for pickup and delivery is requested by the contractor, it will be considered.
Notification shall be by email.
5.7.3 Earlier delivery is acceptable and preferred at no additional cost to the Government. The Contractor shall provide best delivery schedule.
5.7.4 The Contractor shall arrange for pickup and delivery of all components to Directorate of Maintenance, Letterkenny Army Depot, AMSAM-LE-MO, Building 350 ASRS, Door 1, Chambersburg, PA 17201 using best commercial packaging. The packaging shall provide adequate measures to ensure that the fuel system components are protected from the elements to prevent deterioration/corrosion of the items. The Contractor shall provide a packing list by serial number on each delivered pallet/container.
5.7.5 The Contractors offer shall include all shipping costs TO and FROM LEAD. Estimated quantities are shown in TECHNICAL EXHIBIT 3: Estimated Quantities.
5.8 CONTRACTOR MANPOWER REPORTING (CMR): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract.
The contractor shall completely fill in all the information in the format using the following web address https://Contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, KO, Contracting Officer’s Technical Representative (COTR) or also known as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub- Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
6.0 APPLICABLE DOCUMENTS: The contractor is responsible for obtaining all OEM technical manuals, testing criteria, drawings, parts listing, etc. as required. Other applicable publications are as follows:
National Maintenance Work Requirement (NMWR) 9-6115-669-3, dated 1 Dec 2002, Table 4-3, Test Winding Resistance; Table 4-6, Winding Insulation Test; and Table 4-7, Winding Test with High Voltage, and the associated descriptions. NMWR 9-6115-669-3 applies to the above generator.
Letterkenny Army Depot (LEAD) Publications LEAD Regulation 385-1 – LEAD Safety and Occupational Health Program (copies may be obtained from LEAD Directorate of Contracting, Bldg. 2)
TECHNICAL EXHIBIT 1: Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
PWS Paragraph
Task
Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
5.1, 5.2, 5.4, 5.5, 5.6
Rotor and stator resistance and winding insulation testing of
Generator components as required
100% of all serviced components shall work upon installation into the next higher assembly
98.5% QC inspection of all components
COR and QC personnel will inspect each component
5.3 NMWR Tables Correctly Filed
Out.
All NMWR Tables shall be completed for every generator.
98.5% completion COR will inspect and maintain records of
Tables
5.7 Delivery and Packaging
Upon receipt of Delivery
Order, the contractor has 10 days to pick-up, complete services and return (deliver) the finished assets back to
LEAD.
98.5% completion
COR will inspect and maintain records of invoices and delivery orders
TECHNICAL EXHIBIT 2: Deliverables Schedule
Deliverable Frequency Number of
Copies Medium/ Format Submit To
Finished assets:
Generator components
Per delivery order
Determined by
LEAD
production quantity
N/A COR – Delivery
Location
Invoice for services performed
Per each delivery order
LEAD
production quantity
Paper, shipped with finished assets and/or Electronic Submission
COR
Tables of the NMWR Per each asset
Submission
Warranty Per each asset
Submission
CMR
Per each delivery order
N/A Electronic Submission https://Contractormanp ower.army.pentagon.m il
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 1001 Destination Government Destination Government
1002 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 POP 01-MAR-2017 TO
28-FEB-2018
N/A N/A
0002 POP 01-MAR-2017 TO
28-FEB-2018
1001 POP 01-MAR-2018 TO
28-FEB-2019
1002 POP 01-MAR-2018 TO
28-FEB-2019
2001 POP 01-MAR-2019 TO
29-FEB-2020
2002 POP 01-MAR-2019 TO
29-FEB-2020
3001 POP 01-MAR-2020 TO
28-FEB-2021
3002 POP 01-MAR-2020 TO
28-FEB-2021
4001 POP 01-MAR-2021 TO
28-FEB-2022
4002 POP 01-MAR-2021 TO
28-FEB-2022
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-6 Alt I Restrictions On Subcontractor Sales To The Government
(Sep 2006) -- Alternate I
OCT 1995
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights
APR 2014
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-7 System for Award Management JUL 2013 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2015
52.204-13 System for Award Management Maintenance JUL 2013 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-1 Instructions to Offerors--Commercial Items OCT 2015 52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.216-21 Requirements OCT 1995 52.217-5 Evaluation Of Options JUL 1990 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns OCT 2014 52.219-14 Limitations On Subcontracting NOV 2011 52.222-3 Convict Labor JUN 2003 52.222-17 Nondisplacement of Qualified Workers MAY 2014 52.222-19 Child Labor -- Cooperation with Authorities and Remedies FEB 2016 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity APR 2015 52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-41 Service Contract Labor Standards MAY 2014 52.222-43 Fair Labor Standards Act And Service Contract Labor
Standards - Price Adjustment (Multiple Year And Option Contracts)
MAY 2014
52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-10 Waste Reduction Program MAY 2011
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.237-3 Continuity Of Services JAN 1991 52.242-13 Bankruptcy JUL 1995 52.242-17 Government Delay Of Work APR 1984 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7006 Billing Instructions OCT 2005 252.204-7007 Alternate A, Annual Representations and Certifications JAN 2015 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
DEC 2015
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
DEC 2015
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
DEC 2015
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
DEC 2015
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.225-7012 Preference For Certain Domestic Commodities AUG 2016 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)
(a)(1) The Offeror certifies, to the best of its knowledge and belief, that-
(i) The Offeror and/or any of its Principals-
(A) Are ( ) are not ( ) presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;
(B) Have ( ) have not ( ), within a three-year period preceding this offer, been convicted of or had a civil judgment rendered against them for: commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) contract or subcontract; violation of Federal or State antitrust statutes relating to the submission of offers; or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violating Federal criminal tax laws, or receiving stolen property (if offeror checks “have”, the offeror shall also see 52.209-7, if included in this solicitation); and
(C) Are ( ) are not ( ) presently indicted for, or otherwise criminally or civilly charged by a governmental entity with, commission of any of the offenses enumerated in paragraph (a)(1)(i)(B) of this provision.;
and
(D) Have , have not , within a three-year period preceding this offer, been notified of any delinquent Federal taxes in an amount that exceeds $3,500 for which the liability remains unsatisfied.
(1) Federal taxes are considered delinquent if both of the following criteria apply:
(i) The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge to the liability, the liability is not finally determined until all judicial appeal rights have been exhausted.
(ii) The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.
(2) Examples. (i) The taxpayer has received a statutory notice of deficiency, under I.R.C. Sec. 6212, which entitles the taxpayer to seek Tax Court review of a proposed tax deficiency. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek Tax Court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.
(ii) The IRS has filed a notice of Federal tax lien with respect to an assessed tax liability, and the taxpayer has been issued a notice under I.R.C. Sec. 6320 entitling the taxpayer to request a hearing with the IRS Office of Appeals contesting the lien filing, and to further appeal to the Tax Court if the IRS determines to sustain the lien filing. In the course of the hearing, the taxpayer is entitled to contest the underlying tax liability because the taxpayer has had no prior opportunity to contest the liability. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek tax court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.
(iii) The taxpayer has entered into an installment agreement pursuant to I.R.C. Sec. 6159. The taxpayer is making timely payments and is in full compliance with the agreement terms. The taxpayer is not delinquent because the taxpayer is not currently required to make full payment.
(iv) The taxpayer has filed for bankruptcy protection. The taxpayer is not delinquent because enforced collection action is stayed under 11 U.S.C. 362 (the Bankruptcy Code).
(ii) The Offeror has ( ) has not ( ), within a three-year period preceding this offer, had one or more contracts terminated for default by any Federal agency.
(2) Principal, for the purposes of this certification, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager;
head of a division or business segment; and similar positions).
(b) The Offeror shall provide immediate written notice to the Contracting Officer if, at any time prior to contract award, the Offeror learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
(c) A certification that any of the items in paragraph (a) of this provision exists will not necessarily result in withholding of an award under this solicitation. However, the certification will be considered in connection with a determination of the Offeror's responsibility. Failure of the Offeror to furnish a certification or provide such additional information as requested by the Contracting Officer may render the Offeror nonresponsible.
(d) Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by paragraph (a) of this provision. The knowledge and information of an Offeror is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
(e) The certification in paragraph (a) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Offeror knowingly rendered an erroneous certification, in addition to other remedies available to the Government, the Contracting Officer may terminate the contract resulting from this solicitation for default.
(End of provision)
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)
(a) Definitions. As used in this provision--
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Federal contracts and grants with total value greater than $10,000,000 means--
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in--
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.
(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management database via https://www.acquisition.gov (see 52.204-7).
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror submitting the lowest priced, technically acceptable offer. Technical acceptability shall be based on a GO, NO-GO assessment of the information required by the Statement of Compliance. An offeror must receive a GO rating in all areas to be considered for award.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
ADDENDUM TO FAR 52.212-2, BASIS OF AWARD:
A. General Information:
1. The basis of award will be the Lowest Priced, Technically Acceptable offer. Offerors must receive a rating of Technically Acceptable in all factors/subfactors in order for their overall proposal to be determined Technically Acceptable.
2. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, and technical requirements.
3. The Government intends to make award without discussions,…
This is the start of the file's text. The full file is on GovTribe.