W911N2-24-R-0004 Amendment 1.pdf
PDF 825 KB Posted
- Attached to
- Diesel Forklift
- Solicitation number
- W911N2-24-R-0004_Amendment_1
About this file
This document is an amendment to a solicitation for a diesel forklift. The amendment updates the purchase description to include previously unlisted specifications such as pneumatic air tires approved for outdoor use, rear view mirrors, an operator fan, and safety equipment. The solicitation is being reposted by the Department of the Army Materiel Command Contracting Command located at Redstone Arsenal with a new closing date of February 12, 2024. Delivery of the forklift is required at Letterkenny Army Depot during normal business hours. Inspection and acceptance will be conducted by Letterkenny Army Depot Quality Assurance upon receipt in the Procurement Integrated Enterprise Environment system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W25G1Q319300FG
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purchae description for the Forklift has been updated to include previously unlisted specs. CS is resoliciting to include the customers revised PECs. New Posting date w ill be 2 February, w ith a closing date of 12 February 2024. All other Terms and conditions remain unchanged
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Feb-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911N224R0004
X 9B. DATED (SEE ITEM 11)
13-Oct-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Feb-2024
CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC
1 OVERCASH AVENUE CCAM-DSL BLDG 2S
CHAMBERSBURG PA 17201-4150
W911N2 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911N224R0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
DIESEL FORKLIFT SPECS
NOTE: CHANGES TO REQUIRED SPECS ARE HIGHLIGHTED IN YELLOW
6K-8K forklift Rough Terrain or 4-wheel drive, Straight Mast Safety Start Hour Meter Circuit Breakers Side shift adjustment Fork positioner w open range 1.8”-37.5” 72-inch fork length Maximum Height - 86" Overall, Height Top of Canopy or mast under 86” (Must fit inside Conex containers) Tilt Back 12º Tilt Forward 12º Wheelbase 76" Three Stage Mast Turbo Diesel Engine Heavy Duty Radiator c/w -40C Power Shift Transmission / 4 Speed Synchromesh Transmission Power Steering / Tilt and Telescopic Steering Heavy Duty Steer Axle Power Brakes Park Brake Maintenance Free Battery Tilt Steering Wheel Dual Element Air Cleaner Vertical Exhaust Muffler Low Fuel Indicator Ground Speed Control Interior Tilt Cylinder Covers Auto Shift Control Enclosed cab with heat Rear Grab Bar with Horn Button Floor Line Lights Blue Zone Lights (Safety Fence) - Side and Rear Warning Lights Amber Strobe - Mounted Below OHG Warning Device Back-Up Alarm (Outside Mount) Front Work Lights Combination Lights with Front Flood Lights – LED Rear Work Lights (1) Rear Flood Light – LED Air Conditioning for Enclosed Cab (no increased height) Windshield Washer Kit Operator Fan
Additional requirements:
Pneumatic Air Tires or run flats, no solid tires.
Standard size rear view mirrors. (Dual side, 1 rear view)
Add an operator fan.
Suspension seat Retractable Seat Belt (Orange in Color) Seatbelt safety switch/ shuts vehicle off when disconnected Warranty (English) Operator/Service Manual (English) Standard horn
The following have been modified:
PURCHASE DESCRIPTION
PURCHASE DESCRIPTION
FOR
DIESEL FORKLIFT
1.0 GENERAL
1.1. SCOPE:
Will be used to purchase 1 each Diesel Forklift 6,000- 8,000lb capacity, Enclosed cab with heat and A/C, Maximum Height - 86", Operator fan, Air filled tires approved for outdoor use, Rear view mirrors, standard safety equipment required Floor Line Lights Blue Zone Lights - Side and Rear, Warning Lights Amber Strobe -
Warning Device Back-Up Alarm, Front work Lights, Rear Work Lights
FSC 3930- Warehouse Trucks and Tractors, Self-Propelled
1.2. GENERAL INFORMATION:
1.2.1. Depot Hours of Operation: Letterkenny’s tour of duty which is a compressed work schedule with eight days that are nine hours in duration, one day that is eight hours in duration and one standard day off within a two-week pay period (80 hours). Monday through Thursday shall be nine hour days scheduled from 0600 through 1530. The first Friday of the pay period shall be an eight hour day scheduled from 0600 through 1430. The second Friday of the pay period shall be the standard day off.
2.0. GOVERNMENT RESPONSIBILITIES:
2.1. Material: Identify requirement and provide additional specification when required.
2.2. Will provide advanced notice when a Certificate of Conformance is required.
3.0. CONTRACTOR RESPONSIBILITIES:
3.1. Provide material that meets the government requirement.
3.2. Provide Certificate of Conformance when requested.
4.0. PRESERVATION, PACKAGING AND DELIVERY:
4.1 The contractor shall utilize standard commercial methods for preservation and packaging appropriate for all material and acceptable to commercial carriers. As a minimum, all areas susceptible to damage from exposure to the elements shall be preserved and/or packed to prevent damage. The contractor shall be responsible for ensuring the material is delivered to LEAD in good condition.
4.2 Delivery Point: The material shall be delivered to Letterkenny Army Depot. Building 370 central receiving during the normal business hours found in 1.2.1.
5.0. INSPECTION AND ACCEPTANCE: The material will be inspected by Letterkenny Army Depot Quality Assurance once received and accepted in Procurement Integrated Enterprise Environment (PIEE).
(End of Summary of Changes)
File details come from the government source that posted it. Updated .