This is a Statement of Work (SOW) for onsite preventative maintenance, emergency repair services, and repair parts for government-owned QPAC Polishing Equipment (Serial Number: MP2050127) located at Anniston Army Depot. The contract will be awarded for an initial base period of one year from the contract award date, with options to extend for up to three additional years, through August 17, 2032. The contractor must provide trained, certified, and warranted service technicians to perform all work, with all replacement parts sourced from original equipment manufacturers (OEM) or OEM-equivalent parts warranted for a minimum of 90 days against manufacturing defects.
Service requirements include comprehensive preventative maintenance involving equipment inspection, electrical system verification, operational checks, alignment verification, and detailed service reporting. Emergency repair services must be quoted within 24 hours and completed onsite within two working days, with the contractor furnishing all necessary tools, equipment, materials, and components. The contractor must also support equipment upgrades and refurbishing as requested. All service requests and parts replacements require detailed itemized cost estimates submitted for approval prior to work commencement. Additional requirements include facility access coordination with Anniston Army Depot's Contracting Officer Representative (COR), environmental compliance with federal and state regulations, waste management coordination, and travel reimbursement at actual costs for airfare and car rental with other expenses reimbursed per Joint Travel Regulations. Work hours are Monday through Thursday, 7:00 AM to 4:30 PM, with alternating Friday schedules, and the contractor must maintain at least one certified technician with facility access at all times during contract performance.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
1. Project: QPAC Polishing Equipment Maintenance, Emergency Repair and Repair Parts
2. Scope: The contract shall provide services for onsite preventative maintenance, emergency repair service and repair replacement parts, component upgrades and equipment refurbishing necessary to maintain performance and operational readiness of government owned QPAC Polishing Equipment Serial Number: MP2050127 as specified herein is required by the Government. All services, maintenance, emergency repairs and upgrades and refurbishing shall be performed by trained, certified and warranted service technicians. All replacement parts shall be from the original equipment manufacturer (OEM) or be equal with OEM parts and be warranted for a period of not less than 90 days for manufacturing defects or inferior workmanship. All requests for service and replacement parts placed against this contract shall be requested by the designated appointee and initiated by the Directorate of Contracting located at the Anniston Army Depot.
3. Period of Performance: The proposed contract will be for a period up to one (1) year from the contract award date with the option to extend for up to three (3) years. The base period of performance shall begin from the date of contract award acceptance.
4. Service Requirements:
a. The contractor shall provide for onsite services for preventative maintenance, emergency repairs and installation of repair replacement parts, component upgrades and refurbishing of government owned QPAC Polishing Equipment.
b. The contractor shall provide detailed itemized cost estimates based on request for service and replacement/repair parts, component upgrades and equipment refurbishing.
c. The contractor shall provide warranty on all workmanship and durable parts in accordance with the manufacturers stated terms and conditions.
d. The contractor shall provide detailed trip reports that include cost break down.
e. The contractor shall respond to requests for emergency service within 24 hours and arrive onsite within two (2) working days.
f. The contractor shall furnish all tools, equipment, materials and components necessary to make the QPAC equipment operational.
g. The contractor shall upon completion of preventive maintenance, calibration or emergency repairs, installation of component upgrades and equipment refurbishing the contractor will demonstrate that the QPAC Polishing Equipment is operational for acceptance purposes.
h. The contractor shall provide detailed service reports for onsite service calls to describe the services provided.
4.1. Preventive Maintenance:
a. The contractor shall inspect of the machine for worn or damaged components, filter conditions.
b. The contractor shall provide a list of worn or damaged parts found during the machine inspection.
c. The contractor shall prepare and submit for approval a detailed itemized budgetary estimated cost for the replacement of the worn or damaged parts needed to ensure machine readiness. The budgetary estimate shall list the item description, manufacture, part number, cost and quantity required.
d. The contractor shall visually inspect the electrical system wiring, electrical components, electrical motors, electrical pumps for damage, and verify proper voltages are within manufacturer’s recommended tolerances.
e. The contractor shall perform operational checks on the QPAC Polishing Equipment and the related support equipment. The operational check shall include but not be limited to pressure gages, indicator lights, key board buttons, workstation pendant display functions, micro polishing tape feeding functions.
f. The contractor shall inspect the machine for level, proper axis alignments and component alignment and function.
g. The contractor shall Verify/Perform operational test of the QPAC Polishing Equipment.
h. The contractor shall submit individual detailed service report for each machine serviced. The report shall list the current condition of the machine the work performed during the PM and any additional findings not covered under the preventive maintenance plan.
4.2. Emergency Repair:
a. The contractor shall respond to requests for emergency repair service within 24 hours.
b. The contractor shall provide budgetary cost estimate for each request for emergency service. The contractor shall prepare and submit for approval a detailed itemized budgetary estimated cost for the replacement of the worn or damaged parts needed to ensure machine readiness. The budgetary estimate shall list the item description, manufacture, part number, cost and quantity required.
c. The contractor shall provide onsite emergency repair services to repair the QPAC Polishing Equipment to operational status. The contractor shall provide all replacement parts, tools and supplies required to complete the repairs.
d. The contractor shall submit individual detailed service report for each machine repaired. The report shall list the current condition of the machine the work performed to repair the machine and any parts used during the repair.
4.3. Equipment Upgrades:
a. The contractor shall respond to requests for emergency repair service within 24 hours.
b. The contractor shall provide budgetary cost estimate for each request for services to upgrade or refurbish the polishing equipment. The contractor shall prepare and submit for approval a detailed itemized budgetary estimated cost for the replacement of the worn or damaged parts needed to ensure machine readiness. The budgetary estimate shall list the item description, manufacture, part number, cost and quantity required.
c. The contractor shall submit individual detailed service report for each machine repaired. The report shall list the current condition of the machine the work performed to repair the machine and any parts used during the repair.
5. Hazardous Waste: The Government will provide containers for the collection and disposal of all waste to be removed from Government owned equipment. The COR or ANAD Maintenance POC will be notified to coordinate the removal of any coolant, oils and fluids. The contractor shall make every effort to prevent spills.
5.1. Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).
6. Reports: The contractor shall, at the end of each service visit, provide the COR with a written report within 10 days. The written report shall contain the following.
a. General condition of equipment.
b. Corrective Action Statement: Status of system and description of malfunction, repair time, parts used, actual cost of required repair parts and labor to complete the job.
7. Facility Access: The contractor shall, upon notification of contract award, complete the Request for Visitor Access Form 380-2. The contractor shall maintain as a minimum one (1) certified technician cleared for access to ANAD at all times during the performance period of the contact. The Contractor’s Personnel shall complete any and all forms and training required for access to Anniston Army Depot that is deemed necessary during the contract period of performance. The contractor’s technician shall coordinate the planned arrival date with the Contracting Officers Representative (COR) or ANAD Maintenance POC.
8. Hours of Operation:
| WORK | HOURS RECEIVING HOURS | DAY(S) OF WEEK | ||||
| 7:00 AM - 4:30 PM | 7:00 AM - 2:00 PM | Monday - Thursday | ||||
| 7:00 AM - 3:30 PM | 7:00 AM - 2:00 PM | Every other Friday | ||||
| CLOSED | 7:00 AM - 2:00 PM | Every other Friday | ||||
| CLOSED | CLOSED | Saturdays, Sundays, |
and Federal Holidays
9. Service Costs: The Contractor shall submit all charges for preventive maintenance, calibration, equipment upgrades and emergency repair in accordance with the company’s budgetary Quote or service rate schedule for the services rendered. All requests for service will be based on budgetary estimates provided by the contractor and include all associated cost to complete the service. All request for service shall be made by the designated appointee and initiated with the approval of the contracting officer (KO) and shall at no time exceed the amount of available funding approved by the contracting officer (KO).
10. Scope Changes: The Contractor shall not proceed with any verbal or written change(s) to the scope of work from sources other than the Contracting Officer, who will provide changes in writing.
11. Travel Cost: Air fare and car rental shall be reimbursed at actual costs. All other travel expenses (mileage, parking, per diem, misc expenses) will be reimbursed in accordance with the Joint Travel Regulations (JTR). Receipts must be submitted to the Contracting Officer for all travel expenses.