24-Q-0033 Solicitation Amendment 2 Released.pdf

PDF 374 KB Posted

Attached to
2-Ton Crane & Hoist for the Anniston Army Depot
Solicitation number
W911KF-24-Q-0033
Issued by

About this file

This document is an amendment to Solicitation W911KF-24-Q-0033 for the procurement of a 2-ton crane and hoist system for the Anniston Army Depot. The amendment extends the solicitation closing date to July 8, 2024 at 10:00 AM CST, answers industry questions, and clarifies the Statement of Work. The solicitation is for 3 bridge crane systems with a shared runway, to be installed around existing jib booms in Building 409 without disrupting current operations. Concrete footings are required for the crane runway columns. The government will handle removal and relocation of the existing jib booms. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See page tw o.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Jun-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911KF24Q0033

X 9B. DATED (SEE ITEM 11)

29-May-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Jun-2024

CODE

ACC-ANAD

ANNISTON ARMY DEPOT

7 FRANKFORD AVENUE, BLDG 35

ANNISTON AL 36201-4199

W911KF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KF24Q0033

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 2 NOTES

1. The purpose of this amendment is to answer industry questions, amend the Statement of Work and extend the closing date of the solicitation.

2. The closing date is hereby extended to July 8th, 2024 at 10:00 AM CST.

3. Industry questions are answered as follows:

Industry Questions

QUESTION #1:

Just a quick question for now, how come we did not go to Building 134 the three 1-Ton Hoists.

We are to install these correct in addition to the bridge cranes?

ANSWER: The Depot/millwrights are installing the (3) 1T hoists in Bldg. 134.

QUESTION #2:

If we determine that the existing 9 inch concrete floor is adequate to hold the 2- Ton steel runway/bridge, are concrete footings a requirement by the government for the runway steel columns?

ANSWER: Yes, concrete footings are required.

QUESTION #3:

we would like to acquire Clarification all three cranes are going on the one freestanding runway?

The scope of working is throwing me off slightly because it is implied but there is no mention of any anti-collision devices on the cranes.

ANSWER: Yes, all three bridges will share one runway. Any necessary safety devices for this setup are required.

QUESTION #4:

What type of crane are you actually looking for and are you looking for the contractor to set the crane up?

ANSWER: (3)ea. 2 TON bridge crane system with shared runway.

Runway dimensions: 125’ L X 20.6’ W X 18.7’H

Statement of Work Section 2.5 is amended to reflect the following clarification:

Concerning removal of existing jib booms in Bldg. 409, the new crane system shall be constructed around all three existing jib booms as not to stop or delay production of current jib boom use. Jib booms shall be disassembled and removed by contractor following fully

W911KF24Q0033

operational status of new crane system. The government (Depot) will move jibs to alternate location for storage.

4. All other terms and conditions remain unchanged.

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 28-Jun-2024 10:00 AM to 08-Jul-2024 10:00 AM.

(End of Summary of Changes)