W911KF22Q0011.pdf

PDF 1 MB Posted

Attached to
EMCS Federal contract opportunity
Solicitation number
W911KF-22-Q-0011
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This solicitation is for the operations and maintenance of the Energy Management and Control System at Anniston Army Depot in Alabama. It is a base year contract with four option years for Alabama Controls as a sole source set-aside.

The contractor shall provide 24/7 maintenance and support services for over 2,000 devices and 15,000 points within the EMCS, including utility meters, sensors, transmitters, controllers, software, and related components. The contractor is responsible for repairs, replacements, calibrations, software updates, and assisting depot technicians. The contractor must have qualified personnel with experience in DDC systems, HVAC controls, and utility metering. On-site response is required within 24 hours and problems must be resolved within seven business days. The contractor shall maintain spare parts, tools, and equipment on-site.

View the file

Other files for this federal contract opportunity

Other files attached to EMCS, newest first.
File Type Posted
Attachment 3_ SIOAN Form 380-2 Personnel Data Questionnaire.doc DOC document
Attachment 1_Evidence of Authority To Sign Offers.pdf PDF
Attachment 2_Wage Determination.pdf PDF
Attachment 4_ACC-ANAD COVID Letter.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W911KF22Q0011 11-Jan-2022

b. TELEPHONE NUMBER

256-235-4192

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 20 Jan 2022

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911KF9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

JONATHAN R GUNNELS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W31G1Y123500JK

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ACC-ANAD

ANNISTON ARMY DEPOT

7 FRANKFORD AVENUE, BLDG 35

ANNISTON AL 36201-4199

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

ANNISTON ARMY DEPOT (DPW)

BRIAN FREEMAN

7 FRANKFORD AVE BLDG 91

ANNISTON AL 36201

TEL: FAX:

256 235-6353FAX:

TEL: 256 235-6231 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$41,500,000

NAICS:

561210

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF92

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911KF22Q0011

Section SF 1449 - CONTINUATION SHEET

LOCAL NARRATIVE

Local Narratives

Narrative 1: ATTACHMENTS. The following documents are incorporated as a part of this solicitation:

1. Evidence of Authority

2. Wage Determination

3. Sioan Form 380-2 Personnel Data Questionnaire

4. ANAD COVID-19 Letter

Narrative 2: HOURS OF OPERATION.

WORK HOURS RECEIVING HOURS DAY(S) OF WEEK

7:00 AM - 4:30 PM 7:00 AM - 2:00 PM Monday - Thursday 7:00 AM - 3:30 PM 7:00 AM - 2:00 PM Every other Friday CLOSED 7:00 AM - 2:00 PM Every other Friday CLOSED CLOSED Saturdays, Sundays, Federal Holidays

(1) Federal Holidays. Federal holidays may cause the Depot to be closed for one or more of the work days identified. The contract performance period has taken this possibility into consideration.

(2) Shutdown Periods. The Government may choose to shut down for a week or portions of a week as stated below. During this shutdown, and unless otherwise stated, only those Government personnel essential for equipment/facility maintenance will be permitted work.

4th of July Holiday Safety Stand-Down Day* Christmas Holiday Employee Appreciation Day*

*Safety Stand-Down Day and Employee Appreciation Day generally occur on a Friday (8-hour day). Safety Stand-Down Day consists of either two half-days occurring at six-month intervals or one full workday per year. Employee Appreciation Day generally occurs on a Friday (half of an 8-hour day) and is usually held in the afternoon. The Contractor’s services may not be required during these periods. In such cases, the Contractor will be notified in writing by the Government. These interruptions shall be at no cost to the Government.

THIS IS A SOLE SOURCE PROCUREMENT TO ALABAMA CONTROLS, 2309 4TH AVENUE S.

BIRMINGHAM, AL 35233; THIS IS SOLE SOURCE SET-ASIDE PROCUREMENT UNDER:

ANY ORGANIZATION WHICH BELIEVES ITSELF TO BE IN POSSESSION OF THESE

CAPABILITIES CAN PROVIDE WRITTEN EVIDENCE TO THIS EFFECT TO THE

CONTRACTING OFFICER AND MAY BE CONSIDERED FOR FUTURE PROCUREMENT

ACTIONS."

(3) Schedule Changes. When situations warrant, the Government may change the hours of operation to adjust for certain conditions, i.e., weather conditions (extreme heat or cold). For example, during summer production, shops may begin work at 6:00 am and leave work at 3:30 pm to avoid the afternoon heat. The Contractor shall be provided as much advance written notice as possible when these situations occur and will be expected to support any schedule change provided by the Contracting Officer.

(4) Vehicle Searches: All vehicles entering, moving throughout, and exiting ANAD are subject to random searches as directed by the Depot Commander.

Narrative 3: Addendum to FAR Clause 52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL

ITEMS (DEVIATION 2018-O0018) (OCT 2018) - The offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.

Narrative 4: SYSTEM FOR AWARD MANAGEMENT (SAM). Contractors shall complete the electronic annual representations and certifications within SAM and must be registered in the System for Award Management (SAM) database before responding to a solicitation. After award, companies must ensure that their SAM registration remains valid and current to avoid problems with invoicing and payment. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page.

Narrative 5: ELECTRONIC SUBMISSION OF OFFERORS. All responses to this solicitation must be submitted in digitized/electronic format. Paper copy responses shall not be accepted. All solicitation responses must be submitted by email to:

amber.e.burdett.civ@army.mil.

It is the responsibility of the offeror to confirm receipt and ensure its offer, in its entirety, reaches the Army Contracting Command-Detroit, Anniston Army Depot (ANAD), before the time set for closing of the solicitation. Attachments may be rejected once scanned by our email system and the Contract Specialist does not receive a notification.

Offers submitted using any other means shall not be accepted, unless stated otherwise in the solicitation.

Beta.SAM provides industry with a single point of access to all U.S. Army contracting opportunities. The Contracting Opportunities Search feature allows vendors to easily locate opportunities. Vendors must be registered before being able to respond to a solicitation. Before registering, a Data Universal Numbering System (DUNS) Number is required and registration in the SAMS System (www.sam.gov) is required.

Any clauses or provisions of this solicitation which mention writing, returning, or submission of offer will mean electronic submission as stated in the paragraph above.

Electronic offers must identify the solicitation and the opening/closing date, and include, as a minimum, the following:

a. The applicable SF Form (SF33/SF1449/SF18/SF1442) filled out and signed.

b. All applicable fill-in provisions from the solicitation must be completed.

c. Any other information required by the solicitation.

It is your responsibility to furnish all information requested. We will not confirm information by telephone. If you do not fully respond (such as price, delivery date) to the Request for Quotation, you shall be determined non-responsive.

If you choose to password-protect access to your offer, you must provide the password to ANAD before the opening or closing date. Contact the buyer identified on the cover page of this solicitation to arrange a means of providing the password. Passwords used only for the purpose of write protecting files need not be provided.

Offerors shall make every effort to ensure that their offer is virus-free. Offers (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in either physical or electronic transit, shall be treated as “unreadable.”

See Federal Acquisition Regulation 14.406 or 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.

Any bid bond required by this solicitation must be submitted with the offer. Also, the properly completed original bid bond must be furnished to the Army Contracting Command-Detroit, Anniston Army Depot (ANAD), 7 Frankford Ave, Anniston, AL 36201-4199, prior to the opening or closing of the solicitation.

Narrative 6: PAYMENT. Contractor must accept Government Smart Pay Credit Card or payment by Defense Finance Accounting Service (DFAS). COMPLETE THE FOLLOWING

INFORMATION AND INCLUDE WITH ANY OFFER.

Payment Method: MasterCard_____ DFAS_____

Vendor Contact Information: POC: __________________________ Telephone: _____________________

FAX: __________________________

Email: _________________________

Narrative 7: WAWF PROCEDURES. If your order WILL BE PAID BY DFAS (not by credit card) and contains DFARS Clause 252.232-7003, Electronic Submission of Payment Requests, you must submit your invoice through Wide Area Workflow (WAWF). This clause requires invoices for supplies and services purchased by the DoD be submitted via electronic means. The Wide Area Workflow system satisfies this mandatory requirement. WAWF can be accessed on the internet at https://piee.eb.mil/piee-landing/.

Ensure the Electronic Business POCs listed in the System for Award Management (SAM) for your company are the same individuals that will submit invoices through WAWF before using WAWF. SAM is accessible at www.sam.gov. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page.

If your Electronic Business (EB) POCs are correct, contact the WAWF helpdesk at 1-866-618- 5988 and ask them to establish a group for your CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, you will be able to create a Combination Invoice/Receiving report (SUPPLIES/MATERIALS) or a 2 in 1 Invoice (SERVICES/EQUIPMENT) using the codes below and instructions available from our contract administrator/buyer.

Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS). Please have the order number and invoice number ready when calling about payment status.

The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment.

Go to DFAS on the web at: www/dfas.mil/money/vendor. THE FOLLOWING CODES

WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL EMAILS

CORRECTLY THROUGH WAWF:

WAWF

Data/CODES needed for

Invoice

SUPPLIES/

MATERIALS

(PRs that start with W31G1Y)

SERVICES/

EQUIPMENT

SUPPLIES/

MATERIALS

(PRs DO NOT that start with W31G1Y)

CONSTRUCTION

CAGE CODE

SAM Cage code listed in

Contractor/ Offeror field of contract

SAM Cage code listed in

Contractor/ Offeror field of contract

SAM Cage code listed in Contractor/

Offeror field of contract

SAM Cage code listed in Contractor/Offeror field of contract

ISSUE/ADMIN BY

DODAAC

W911KF W911KF W911KF W911KF

INSPECT BY

DODAAC (If needed)

W31G1Y (Must have inspector code)

W911KF

W911KF

(Unless Inspected by DCMA)

W911KF

SHIP TO

(Supplies/Material s Only)

W911KF NOT AVAILABLE W911KF W911KF

ACCEPTOR

(Services/Equipment Only)

NOT AVAILABLE W911KF NOT AVAILABLE NOT AVAILABLE

Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTION

Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303

CONTRACT NUMBER:

DELIVERY ORDER NUMBER (IF APPLICABLE):

EMAIL POINT OF CONTACT LISTING: (Please insert following email addresses for additional email distribution)

CONTRACT ADMINISTRATOR: Amber Burdett, amber.e.burdett.civ@army.mil CONTRACTING OFFICER: Morey Gaddy, troy.m.gaddy2.civ@army.mil

Narrative 8: AUTOMATED INSTALLATION ENTRY (AIE) BADGE. Contractors accessing Anniston Army Depot shall be required to obtain an AIE badge. To do so, contractors must submit a completed SIOAN 380-2 (sent to contractor at time of award) to the Contract Specialist with all required signatures to the badge office. A background check will be completed and approved/disapproved within 7-10 days. Once approved, the contractor can schedule an appointment for an AIE badge to be issued.

Narrative 9: WAGE DETERMINATION

(a) U. S. Department of Labor Wage Determination Number(s) 2015-4587 dated 10/20/2021 is/are attached and made a part of this Solicitation. The Wage Determination(s) will be made a part of any resulting contract. However, if this solicitation includes the FAR Clause 52.222-48 entitled EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT LABOR STANDARDS TO

CONTRACTS FOR MAINTENANCE, CALIBRATION, OR REPAIR OF CERTAIN EQUIPMENT-

CERTIFICATION (MAY 2014), and the contractor provides an affirmative certification therein, the Wage Determination(s) will not be made a part of any resulting contract.

(b) Any class of service employees which is not listed therein, but which is to be employed under this contract, shall be classified by the Contractor so as to provide a reasonable relationship between such classifications and those listed in the attachment, and shall be paid such monetary wages and furnished such fringe benefits as are determined by agreement of the interested parties, who shall be deemed to be the contracting agency, the Contractor, and the employees who will perform on the contract or their representatives. If the interested parties do not agree on a classification or reclassification which is, in fact, conformable, the contracting officer shall submit the question, together with his recommendation, to the Office of Government Contract Wage Standards, Wage and Hour Division, ESA, of the Department of Labor for final determination. Failure to pay such employees the compensation agreed upon by the interested parties or finally determined by the Administrator or his authorized representative shall be a violation of this contract. No employees engaged in performing work on this contract shall in any event be paid less than the minimum wage specified shall be in Section b (a)(1) of the Fair Labor Standards Act of 1938, as amended.

Narrative 10: OPTION YEARS. Contractor shall be notified at least sixty (60) days prior to expiration date of the contract if the Government intends to exercise its option to extend the contract for an additional year. In the event the Government fails to notify the contractor within the said sixty (60) days, but at a time less than sixty (60) days prior to the expiration date does notify the contractor that it intends to exercise the option to extend the contract for an additional year, the contractor will have the right to waive the sixty (60) day notice requirement and to perform under the option year contract.

Narrative 11: It is the Government’s intent to award ONLY one contract from this solicitation.

However, the Government reserves the right to make multiple awards if there is a cost savings that would be advantageous to the Government.

Narrative 12: Service Contract Reporting. Service contractor reporting of information is required in the SCR section in the System for Award Management (SAM) by 31 October, when a contract or task order has a total estimated value, including options, that exceeds $3 million;

and is for services in the following service acquisition portfolio groups:

1) logistics management services,

2) equipment related services,

3) knowledge-based services, or

4) electronics and communications services.

Narrative 13: IDENTIFICATION BADGES. The following requirements apply to all contractors working inside the Controlled Area of Anniston Army Depot.

(1) Contractors are required to secure, and wear at all times, employee identification badges for all employees who must enter the Anniston Army Depot (ANAD) to engage in contract work. Badges must be secured before an employee will be allowed entry onto the depot. Contractors that are non-US citizens must be escorted by depot personnel with the proper security clearance. Emergency badges will be issued on a case-by-case basis. Badges may be obtained from the Badge Office (BO), Building 367, located at the main entrance to ANAD. No charge is made for badges if they are returned. Contractors will be charged twenty-five dollars ($25.00) for each badge issued to replace lost badges or badges damaged through carelessness, negligence, or misuse. All persons to be badged shall present a PHOTO identification from one of the following sources:

a. - State driver's license

b. - State identification card

c. - Federal, municipal, or school identification card bearing a seal and the following information: photo, name, social security number, date of birth, and physical description

NOTE: A social security card is not a photo identification and will not be accepted as proper identification.

Employee identification cards issued by the Contractor will not be accepted. The Directorate of Emergency Services (DES) will reject any identification presented which is altered, not issued by one of the above identified agencies, or otherwise questioned regarding validity.

(2) Contractors shall submit the name of a point of contact responsible for security requirements through the Contracting Officer to the Installation Security Management Office upon notification of contract award.

(3) Ten working days prior to the date Contractor employee will begin work in the controlled area of ANAD (within the gates), a Personal Data Questionnaire/Privacy Act Statement (SIOAN Form 380-2) must be completed and signed for each employee. The form authorizes ANAD to conduct a local background check for any criminal record or questionable reliability. No contractors or employees will be issued a badge without a favorable local background check. SIOAN Forms 380-2 may only be submitted for persons who are current employees of the Contractor or who hold a letter of intent to hire issued by the Contractor. Forms will be submitted to the Badge Office (BO), Building 367, located at the main entrance to ANAD. NO PRE-EMPLOYMENT LOCAL BACKGROUND CHECKS WILL BE CONDUCTED BY ANNISTON ARMY DEPOT. The prime contractor is responsible for checking with the Badge Office (BO), Building 367, phone number 256 235-6820, to ensure that employees have been cleared for entrance to ANAD.

(4) Also, at least ten working days before the Contractor expects to begin work on the installation, prime Contractor shall submit, on company letterhead, the name, social security number, date/place of birth, and citizenship of all persons entering ANAD to perform contract work for the prime and any subcontractors. Letter shall be submitted through the Contracting Officer to the Badge Office (BO).

(5) Violation of any security or safety requirements will be grounds for immediate suspension of the individual's badge. DES will notify the Contracting Officer when suspension actions are taken. The Contractor can appeal the suspension to DES, who is the final adjudication authority of the individual's reinstatement or revocation of badge privileges.

(6) See clause entitled Identification of Contractor Employees for Contractor employees working on Anniston

Army Depot.

Narrative 14: IDENTIFICATION BADGES. AMMUNITION LIMITED AREA. Yes___, No ___ work to be performed in the Ammunition Limited Area (ALA). Contractors working within the ALA must abide by the above guidance plus the following additional requirements:

(1) The prime Contractor will be notified which persons are approved for access to the ALA. Contractor personnel who are denied access based on the local background check will have the right to appeal to the DES. The Director's decision is considered the final action.

(2) No privately-owned vehicles (POV) are authorized in the ALA.

(3) Contractor-owned, rented, or leased vehicles which are construction-type (i.e., pickup trucks, dump trucks, etc.) may be authorized within the ALA upon being inspected and registered with ANAD. ALL VEHICLES AND

PERSONS SHALL BE SEARCHED UPON ENTERING AND EXITING THE ALA.

(4) Contractor vehicles may not remain overnight within the ALA without obtaining permission from DES and by disabling the vehicle (by removing the battery or some other method approved by DES).

(5) No alcohol, photographic equipment, firearms, flame producing devices (to include lighters and matches), or other items prohibited by safety requirements are permitted within the ALA.

(6) All damages caused by the Contractor to security lighting, fencing, intrusion detection systems, security telephones, or any other security equipment will be repaired immediately at the Contractor's expense by the Contractor. Normal contract work will not resume until the security equipment is returned to normal.

(7) The Contractor shall comply with the requirements of the Department of the Army Pamphlet 385-64, Safety, Ammunition and Explosives Safety Program, in effect on the date of the solicitation for this contract.

(8) The Prime contractor shall assure that each contract employee is instructed in the known potential hazards of fire, explosion, or toxic release hazards related to his/her job while working in the Ammunition limited Area, and the applicable provisions of the installation/contractor emergency action plans.

(9) The contractor will ensure that each employee requiring access to the ALA receives Explosives Safety brief from ANAD Safety Office at least annually.

(c) Contractor Vehicles in the AMMUNITION LIMITED AREA (ALA): The following rules apply to contractor vehicles in the ALA Area.

(1) Contractors shall only enter into the restricted areas of Anniston Army Depot for the purpose of completing the official business as stipulated in the contract.

(2) Contract vehicles entering into the restricted area shall be on official contract business verified by the Contractor; shall be construction type vehicles; shall be properly registered on Anniston Army Depot; shall have a placard with the name of the contractor affixed, and the contractor shall assume liability for all vehicles used within the restricted area in support of the contract. (See paragraph (c)(4) below for definition of an acceptable document to the liability requirement.)

(3) Contractor Employees’ Privately-Owned Vehicles not included in (c)(2) above shall not be authorized in the restricted area.

(4) The documentation to satisfy the liability language in paragraph (c)(2) would be:

a. A vehicle (i) registered (titled) in the name of the contractor or (ii) a lease, signed by the lessee/contractor and the lessor/owner. The person signing for the contractor must be a person acting with authority for the contractor.

b. In the case of a vehicle owned (titled) by the contractor, evidence of insurance combined with the terms of the contract will ensure a method of covering liability.

c. In the case of a vehicle leased by the contractor, evidence of insurance in the owner/lessor’s name and the contractor must sign a statement substantially as follows: “In consideration for allowing entry and use of the described vehicle within the Restricted Area, the undersigned hereby assumes liability for all damage or injury caused by the operation of this vehicle.”

Narrative 15: TRAFFIC. The Contractor shall be required to conform to Depot regulations concerning:

(1) Designated routes

(2) Parking regulations

(3) Insurance--See clause entitled "Insurance Requirements." The Contractor shall also ensure that all POVs brought on the installation are fully insured for minimum amount of personal injury and personal damage liability required by Federal Acquisition Regulation 28.307-2.

(4) Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition. Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment. However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.

Narrative 16: FIRE PREVENTION AND PROTECTION. The Contractor shall comply with all fire prevention measures prescribed in the installation fire prevention and protection regulation, a copy of which is on file in the office of the Contracting Officer. A written hot work permit shall be obtained from the installation fire department for use of any heat producing devices such as blowtorches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by the terms of this contract.

Narrative 17: UTILITIES. Government-owned and operated utilities are adequate for the needs and use of the Contractor as well as the Government. All reasonably required amounts of water and electricity are available to the Contractor without charge.

Narrative 18: CELLULAR TELEPHONE USE. Use of any cellular telephone camera is prohibited on this installation. If a cellular telephone is illegally used on this installation, that cellular telephone is subject to confiscation, and any violation may be punishable by fine or imprisonment or both. Use of cameras without ANAD-issued permit is strictly prohibited. Non-permitted cameras are subject to confiscation.

Narrative 19: AIR EMMISSIONS. The contractor is responsible for early coordination with the Directorate of Risk Management on any action that might result in air emissions (dust, volatile substances, etc).

ANAD's Title V Air Permit requires the installation to obtain construction permits for new or modified air sources.

The Alabama Department of Environmental Management (ADEM) must issue a construction permit before ANAD purchases and installs any equipment which shall produce air emissions. Installation and/or start-up of this equipment without the proper permit and coordination with ADEM is a violation of State and federal environmental law. The violation could result in a possible civil penalty or fine of $32,500 per day per violation from the Federal Environmental Protection Agency. Contractors considering a new process or device, or a modification to an existing unit, must first coordinate with the Environmental Compliance Division, Directorate of Risk Management.

Narrative 20: ENVIRONMENTAL MANAGEMENT SYSTEM, ISO 14001. The contractor and its subcontractors shall conform to Anniston Army Depot's Environmental Management System (EMS) including all policies and procedures required by the EMS. All activities conducted within the installation are subject to the EMS and any plans, goals, objectives, targets, etc. established through the EMS. It is the contractor's responsibility to ensure that any work performed under this contract is accomplished in accordance with the Anniston Army Depot's Environmental Policy (Commander's Policy #72). Information about the EMS can be obtained from the Directorate of Risk Management by calling (256) 235-7746. The contractor or subcontractors shall be responsible for stopping work (or stopping the work of subcontractors) and reporting any operation or condition on ANAD that could adversely affect the environment or the health and safety of employees or the public.

In such situations, the contractor should immediately advise the COR or an appropriate authority. Emergencies should be reported by dialing "911" from any Anniston Army Depot base telephone.

Narrative 21: ANAD NETWORK. For access to the ANAD network, send a letter stating that a National Agency Check with Inquiries (NACI) has been initiated and furnish a copy of the SF 85, Questionnaire for Non- Sensitive Positions, for review prior to issuance of an interim password. The results of the NACI investigation shall be furnished to the Security Management Office, Security Office Identifier number A077, for the final adjudication.

Narrative 22: SAFETY AND ACCIDENT PREVENTION. Contractors shall adhere to all safety rules and regulation of corrective actions, which shall be taken into consideration:

General:

Applicable Publication: The publications listed below form a part of this specification to extent referenced. The publications are referred to in the text by basic designation only.

Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).

Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for construction. Under the general provisions, it gives each contractor responsibility to “…initiate and maintain such programs as may be necessary to comply with this part (29CFR1926).” The general company safety plan should address the how the company shall comply with the basic requirements of the standard.

For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.

In addition to contract clause entitled "ACCIDENT PREVENTION," FAR 52.236-13, the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies. Definition of Hazardous Materials: Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313. Those most commonly encountered include asbestos, polychlorinated biphenyl’s (PCB’s) explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging and pipe covering. Engineering Manual 385-1-1 outlines safety requirements for construction. A copy of it is available for review in the Anniston Army Depot safety office, or from the Army Corp of Engineers web site, www.usace.mil/publications.

The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death.

Contractors prior year OSHA logs (form 300A) and a site specific safety plan for work to be performed on Anniston Army Depot must be provided for approval by the Anniston Army Depot Safety Office no more than 10 days after award of contract. Contractor shall maintain an accurate record of accidents resulting in traumatic injury or death and accidents resulting in damage to Government property, supplies, and equipment. The Contractor shall report incidents causing disruption of contract services, or any accidents in connection with performance of this contract, to the Contracting Officer Representative within two (2) hours of occurrence. Contractor shall notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/by local, State, and Federal Regulators in which the violation or alleged violation is attributed to the action of the contractor or its subcontractors. Contractor shall provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.

Contractor shall safeguard and maintain all Government property, as well as, provide for the safety and well-being of personnel employed in the administration of this contract. Local PPE requirements are at minimum long pants, long sleeved shirts, protective footwear, protective eyewear and hearing protection shall be used and provided by contractor.

The Government reserves the right to conduct unannounced safety inspection at any time, all OSHA required records to include OSHA form 300 and 300A shall be made available to COR or ANAD Safety Office Staff upon request or during unannounced safety inspections. OSHA logs must be produced for review within 3 working days of initial request. Contractor shall notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/ by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors. Contractor shall provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation within 1 day of receipt of documentation.

If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim against the government and shall be at no cost to the Government.

The contractor must have a Drug Free Workplace plan that includes post-accident testing. This shall be part of their Safety Plan.

Narrative 23: CONTRACTOR SAFETY PROGRAMS AND ACCIDENT PREVENTION PLANS. For each specific job or contract, an accident prevention plan (or job safety plan) must be submitted.

This plan is specific for the current project, and must address the particular hazards which shall be inherent in the project and how they shall control them. This plan must be submitted to the ANAD Safety Office not more than 10 days after contract award. Contractor must have approved plan in place prior to any work being performed on ANAD. Listed below are some of the items that must be covered in the plan, the plan must also meet current standards listed above.

(1.) SIGNATURE SHEET. Title, signature, and phone number of the following:

a. Plan preparer

b. Plan approval, e.g., owner, company president, etc.

c. Plan concurrence (concurrence of other applicable corporate and project personnel (contractor) such as their safety officer, project manager, or superintendent) (2.) BACKGROUND INFORMATION. List the following:

a. Contractor

b. Contract number

c. Project name

d. Brief description of the work to be performed and location

e. Contractor accident experience (provide information such as OSHA 200 logs, company safety trend analysis)

f. Listing of phases of work and hazardous activities requiring activity hazards analyses.

(3.) STATEMENT OF SAFETY AND HEALTH POLICY.

(4.) RESPONSIBILITIES AND LINES OF AUTHORITIES.

a. Identification and accountability of personnel responsible for safety - at both corporate and project level if applicable.

b. Lines of authority.

(5.) SUBCONTRACTORS AND SUPPLIERS.

a. Identification of subcontractors and suppliers (if known).

b. Means for controlling and coordinating subcontractors and suppliers.

c. Safety responsibilities of subcontractors and suppliers.

(6.) TRAINING.

a. List subjects to be discussed with employees in safety indoctrination.

b. List mandatory training and certifications, which are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, vehicle operator, HAZWOPER training and certification, personal protective equipment, electrical hazards, elevated surfaces.).

c. Identify requirements for emergency response training.

d. Outline requirements (who attends, when given, who shall conduct etc.) for supervisory and employee safety meetings.

(7.) SAFETY AND HEALTH INSPECTIONS. Provide details on:

a. Who shall conduct safety inspections (e.g. project manager, safety professional, QC, supervisor, employees, etc.)

b. Any external inspections/certifications that may be required.

(8.) SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND COMPLIANCE.

a. The company's written safety program goals, objectives, and accident experience.

b. A brief description of the company's safety incentive programs (if any)

c. Policies and procedures for holding managers and supervisors accountable for safety.

(9.) ACCIDENT REPORTING. The contractor shall identify who shall complete the following, how, and when:

a. Exposure data (man hours worked)

b. Accident investigations, reports and logs

c. Immediate notification of accidents

(10.) PLANS (PROGRAMS, PROCEDURES) AS APPLICABLE TO THE WORK TO BE CONDUCTED.

This list is not all-inclusive, nor shall all topics apply to all contractors.

a. Hazard communication

b. Emergency response plans (spills, posting of emergency telephone numbers, fire prevention, etc.)

c. Layout plans

d. Respiratory protection plan

e. Health hazard control program

f. Lead abatement plan

g. Asbestos abatement plan

h. Abrasive blasting

i. Confined space

j. Hazardous energy control plan

k. Critical lift procedures

l. Contingency plan for severe weather

m. Access and haul road plan

n. Demolition plan (engineering and asbestos survey)

o. Material handling equipment licensing

p. Plan for prevention of alcohol and drug abuse

q. Fall protection

(11.) Detailed site-specific hazards and controls shall be provided in the activity hazard analysis for each phase of the operation.

Narrative 24: SEXUAL ASSUALT AND HARASSMENT IN THE WORKPLACE.

Contractor employees working in areas with Federal employees must be aware of the workplace rules and requirements prohibiting and responding to sexual harassment and sexual assault incidents and claims. Sexual assault is an involuntary sexual act in which a person is threatened, coerced, or forced to engage against their will, or any sexual touching of a person who has not consented. Sexual assault and sexual harassment are strictly forbidden and the Depot Commander has mandated that everyone on the premises of ANAD has a responsibility to prevent assault and harassment and report it if discovered. The COR shall provide a Fact Sheet defining sexual harassment to be distributed to contractor employees working in government facilities.

As with any workforce, there is opportunity for inappropriate behavior between Contractor and Government employees. Prevention and prompt reporting and resolution of any such incidents are Top Priorities at Anniston Army Depot. Offending employees are subject to barment from ANAD. Contract performance requirements shall not be adjusted for reasons related to an incident involving an offense by contractor employees.

In order to prevent problems from arising, Contractor supervisors must provide the following information to each employee working on ANAD premises:

If you believe you are a victim of sexual harassment:

It is important that you take action. Ignoring sexual harassment seldom makes it stop; in most cases, sexual harassment continues or becomes worse when it is tolerated. While removing yourself from the uncomfortable situation may seem to be a solution, it is probably not in your best interest or the interests of other potential victims around you.

Tell the harasser that the behavior is unwelcome and must stop. Any way of telling them to stop is acceptable, including directly telling him or her, calling, e-mailing or sending a memo.

Tell someone; do not keep it to yourself. There are things that other people can do to help you Document the incident. Write down dates, places, names of witnesses and what happened. Keep e-mails, text messages, instant messages, voice mails, and all history of the incidents.

Report harassment to your supervisor, director, EEO staff, Victim Advocate, or union representative.

Follow whatever complaint procedures apply with your employer

If you witness sexual harassment or it is reported to you:

Report it to your supervisor

Report it to the Depot Sexual Harassment/Assault Response and Prevention (SHARP) Coordinator, Mrs.

Wendy Suttles, at (256) 240-3447.

Cooperate with any investigative agencies.

Narrative 25: GOVERNMENT OWNED PROPERTY. When contractors bring in equipment onto Anniston Army Depot for use in performing contracted work to repair, replace or install, all contractor-owned equipment must have ‘company name’ stenciled, laser marked, or marked in some other permanent way on the equipment.

STATEMENT OF WORK (SOW)

Statement of Work (SOW)

Operations and Maintenance of the Energy Management and Control System (EMCS)

Anniston Army Depot, AL

1.0 OBJECTIVE: The Anniston Army Depot (ANAD) has a need for the daily maintenance of the existing Energy Management Controls System (ECMS), located onsite. This will be a base year contract with four option years.

2.0 SCOPE: The EMCS at ANAD is an integral part of ANADs energy management, utility meter management, and facility automation and production activities. ANADs EMCS comprises over 2,000 devices, 15,000 points and requires 24/7 surveillance, service and maintenance. The SOW shall include the entire EMCS components, points, devices, systems, programs, applications and supporting functions as installed at ANAD, unless specifically excluded in this

SOW.

2.1 DEFINITION: Energy Management and Control System (EMCS): An EMCS may be known by various other names such as: building automation system (BAS), building management system (BMS), energy management system (EMS), and facility management system (FMS). For this document, the EMCS is explicitly defined as the sensors, transmitters, data acquisition, human machine interface (HMI), utility meters, mechanical actuators, and data processing performed at the user (building) level as well as data, SQL servers and control systems that are more global to full campus control schemes.

3.0 GOVERNMENT RESPONSIBILITIES

3.0.1. The Government will provide oversight through the Contracting Officer’s Representative (COR). However, the contractor shall not proceed with any verbal or written change(s) to the statement of work from sources other than the Contracting Officer (KO), who will provide changes in writing.

3.0.2. The Government will provide the contractor with the following:

3.0.3. Building space with a minimum of one (1) cubicle space, up to two (2) cubicle spaces, as permitted by Engineering Division Chief. A minimum area of warehouse space approximately 800 s.f. is necessary to store spare parts, as agreed upon by the COR, Contractor, and Real Property Officer;

3.0.4. Sufficient utilities (electrical, water and sewer) at no cost to Contractor;

3.0.5. Standard US Army and Anniston Army Depot forms;

3.0.6. Office furniture, to include desks, chairs, refrigerator and filing cabinets.

3.0.7. Refuse collection and an outside refuse container.

4.0 CONTRACTOR RESPONSIBILITIES

4.0.1. Service technicians for the EMCS shall be qualified individuals with a minimum of five

(5) years’ experience and who have demonstrated knowledge and competence in the operation, service and repair of a centrally located computer controlled TAC I/A Network 8000 DDC system and more specifically a large (in excess of 15,000 points) EMCS system. Contractor employees must be familiar with the Network 8000, Schneider and Niagara open energy management equipment and have completed course(s) taught by the system manufacturer or the system manufacturer’s local field office. The contract employee shall have the ability to develop enterprise server displays to resolve operational problems related to software, hardware, utilities, and facility equipment. Contractor technicians shall be well versed in NIST SP 800.53, Risk Management Framework (RMF), Federal Information Security Management Act (FISMA), the Computer Security Act (CSA), DoDI 8500.2 and other federal government publications. In addition, all are DoDI 8570.01 compliant, IAT Level 1, 2 and 3 certified and maintain numerous other IA certifications including Certified Information System Security Professional (CISSP) and Security+ certifications.

4.0.2. Contract employees shall have a minimum of two years HVAC equipment control experience. Contract employee shall be required to work alongside ANAD technicians, electricians and engineers in order to trouble shoot and repair systems associated with the EMCS.

4.0.3. The Contractor employee shall be qualified to calibrate, maintain, replace and program and install, electric, natural gas and water utility meters (Utility Meters).

4.0.4. The contractor shall provide written certification that all personnel performing services under this contract meet or exceed the requirements set forth in above paragraph(s) as applicable prior to contract start date and within five (5) working days after new personnel are added to Contractor's staff

4.0.5. Evidence of graduation or training from a technical course of instruction in mechanical, electrical, electronic, or instrumentation field of study may be substituted in lieu of experience.

4.0.6. Service technicians must clear all security background checks. Technicians must clear security checks to receive Access to ANADs secure Ammunition Limited Area (ALA) area without ANAD escort. Service Technicians are required to complete ANAD IT, and other Security training as directed by ANAD Security Office and Directorate of Information Management (DOIM) to work at ANAD. Technicians shall obtain and maintain CAC card and computer login privileges.

4.0.7 The Contractor shall provide all transportation conveyances required for performance of duties under this contract.

4.0.8 The Contractor shall ensure that all contractor vehicles are identifiable by displaying the contractor’s company name. The Contractor shall provide evidence of insurance on contractor vehicles.

4.0.9 The Contractor vehicles shall meet ANAD security requirements necessary for operation in the ANAD Ammunition Limited Area (ALA) and Controlled Area (CA).

4.1 GOVERNMENT FURNISHED PROPERTY (GFP) & SERVICES.

4.1.1. The Contractor shall utilize property and services provided in section 3.2 for use only in the support of this contract.

4.1.2. The Contractor shall be responsible for all items of Anniston Army Depot equipment throughout the period they are in his possession and shall be responsible for any damage to Anniston Army Depot owned equipment and property. In the event of damage or loss due to the fault of the Contractor or Contractor personnel, the Contractor shall replace or repair at Contractor's expense, any property damaged with the prior approval of the KO.

4.1.3. Where equipment is serviced on-site the Contractor shall leave the space in a clean, neat, safe, and orderly condition. To prevent safety hazards, no equipment shall be left pulled out or apart at the end of the workday. All equipment under repair by the Contractor shall be secured at all times.

4.2. CONTRACTOR

4.2.1 The Contractor shall provide all non-GFP items required in the performance of this contract.

4.2.2. The Contractor shall furnish all necessary personnel, supplies, materials, tools, support equipment and services, and vehicles required to perform this contract in accordance to its terms and conditions, except for those items and services specifically stated as Anniston Army Depot furnished.

4.2.3. The Contractor shall provide 24/7 service, technical support, repairs, and troubleshooting…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .