Attachment1StatementofWork.pdf
PDF 460 KB Posted
- Attached to
- Portable Rail Car Hoist System Federal contract opportunity
- Solicitation number
- W911KF-16-Q-0057
About this file
Statement of Work (SOW)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001_Approved.pdf | ||
| Attachment5AFFIRMPROCREPORTING.pdf | ||
| Attachment2EvidOfAuth.pdf | ||
| W911KF-16-Q-0057.pdf | ||
| Attachment3ContrRequestforWaiver.pdf | ||
| Attachment4EPAGuidelineItems.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION/WORK STATEMENT/SPECIFICATION
FOR
Portable Electric Jacks
1.0 SCOPE:
This specification establishes a requirement for portable electric jacks to be used in conjunction with a locomotive refurbishment process at the Defense Non-Tactical Generator and Rail Equipment Center (DGRC) in Hill AFB Utah. Four jacks are required to lift the locomotive to gain access to the underside of the locomotive which is a central part of the refurbishment process performed by personnel at DGRC.
2.0 SALIENT FEATURES:
The jacks shall enable personnel the ability to lift the locomotive at least 6 feet to allow personnel to access the undercarriage of the vehicle.
The jacks will need to be portable and moveable to allow personnel the ability to perform maintenance and repair operations on the locomotive.
A set of at least 4 electric jacks are required to lift the locomotive with a combined lift capacity of at least 125 tons.
The unit will be able to be controlled by a paired operation so the set of four jacks can operate as a set of four, in pairs or individually by turning a selector switch on the
Master control box.
The electric jacks will need to be controlled by a single controller. Each jack shall be equipped with individual push buttons to permit separate operation
The lifting carriage should be of an all welded steel frame. The guide rollers on the jack are to be housed inside the steel column, to protect them from damage.
3.0 DELIVERY:
The vendor shall be responsible for crating the jacks and provide shipment to DGRC Utah.
4.0 WARRANTY:
The control console shall be covered by a minimum one (1) year warranty against defects in material and workmanship. The warranty period shall commence the day of delivery.
Attachment No. 1