- REPLACEMENT OF MANGANESE AND ZINC PHOSPHATE VATS
- Solicitation number
- W911KF16Q0021
About this file
AMENDMENT W911KF-16-Q-0021-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911KF-16-Q-0021-0003.pdf | ||
| W911KF-16-Q-0021-0002.pdf | ||
| W911KF-16-Q-0021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE SCHEDULE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Revise the Statement of Work.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Feb-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KF-16-Q-0021
X 9B. DATED (SEE ITEM 11)
28-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Feb-2016
CODE
DOC-ANNISTON ARMY DEPOT(2)
DIRECTORATE OF CONTRACTING
7 FRANKFORD AVENUE
ANNISTON AL 36201-4199
W911KF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KF-16-Q-0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT NOTES
1. The purpose of this amendment is to revise the Statement of Work for Solicitation W911KF- 16-Q-0021.
2. The Statement of Work for the government's Solicitation W911KF-16-Q-0021 is hereby revised and shown in its entirety below.
3. All other terms and conditions remain unchanged.
Description/Work Statement/Specification 2 February 2016
1.0 Scope. This specification establishes the requirement for the replacement of the Manganese phosphate and Zinc phosphate vat systems which will be provided to Anniston Army Depot, Anniston, Alabama. The Phosphate Vat Systems shall be designed, fabricated, and installed by the contractor with all functions, capabilities and equipment as described herein. The contractor shall provide all resources necessary to design, manufacture, deliver, install, calibrate, demonstrate functional operation, and provide operator and maintenance training for the each phosphate vat system.
2.0 Applicable Documents.
2.1 Government Documents. N/A
2.2 Order of Precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this specification shall take preference.
3.0 Responsibilities.
3.1 Contractor.
3.1.1 The contractor shall be responsible for physical delivery, installation, and the safety requirements of their employees, including but not limited to steel toed safety shoes, protective eye wear with side shields, and hearing protection.
3.1.2 The contractor shall inform the Government of any additional utilities that may be necessary for the installation of the Manganese and Zinc Phosphate vat systems at least thirty (30) days after contract acceptance.
3.2 Government.
3.2.1 The Government will be responsible for providing power and floor space to accommodate the Manganese and Zinc Phosphate vat systems.
3.2.2 Escorting contractor personnel while in building 31.
4.0 Requirements.
4.1 Performance Requirements. Each phosphate vat system shall consist of the following:
4.1.1 Provide and Install:
4.1.1.1 One vat for each system – 2 total (Size of vats: 142”L x 45”W x
6”H). Material: Stainless Steel, 300 series, ¼” thick.
4.1.1.1.1 Leak test using standard industrial practices.
4.1.1.1.2 Drains, openings and weirs not required.
4.1.1.2 One electric heat source for each system: 2 total
4.1.1.2.1 440 to 480 volt.
4.1.1.2.2 Closed loop with transfer medium.
4.1.1.2.3 Heat exchangers.
4.1.1.2.4 Government to approve design and equipment.
4.1.1.3 Heat exchange coils for each vat system.
4.1.1.3.1 Attach to the exterior wall of vat, for radiant heat transfer.
4.1.1.3.2 Maintain 200oF vat solution temperature.
4.1.1.3.3 Vat solution heat up from 70oF not to exceed 6 hours.
4.1.1.4 Insulated vat wrap system to prevent personnel contact with heat source. To include rigid outer stainless steel shell.
4.1.1.5 Insulate all supply and return piping to and from heat source and vat to prevent personnel contact with piping.
4.1.1.6 Temperature control and display.
4.1.1.7 New Pull ventilation duct from vat to first connection joint
(approximately 6 feet).
4.1.1.8 Vat support structure. (Note: Current support structure may be reused. If reused, contractor is responsible to insure current support structure is adequate for new vat (weight, etc.)).
4.1.1.9 All piping new and reused. Contractor is responsible for all new piping and reconnection of all current piping required for the operation the each vat system (water make up, heat transfer piping, push ventilation, etc.).
4.1.1.10 Cut concrete channel/trough to include metal cover plate.
4.1.1.10.1 Accommodate supply and return lines for transfer
medium.
4.1.1.10.2 Cover plate shall be rated for loaded fork lift transit.
4.1.1.10.3 Cutting Method: Wet Saw. Ensure clean up proceeds
simultaneously during the process.
4.1.2 Decommission:
4.1.2.1 Manganese Phosphate (L7434) Vat and Zinc Phosphate (L7430) Vat. Remove to ANAD selected site. (Note: Vat removal may render current vats unusable.)
4.1.2.2 Remove the agitation systems.
4.1.2.3 Remove Pull ventilation systems.
4.1.2.4 Remove Push ventilation systems.
4.1.2.5 Remove electrical immersion heaters.
4.1.2.6 Remove all air push and pull associated ventilation equipment
4.1.2.7 Remove water make ups and shut off all associated valves and supplies.
4.1.2.8 DEMO existing hurricane washer located in building 31 vat area with no regard to operable condition. (Note: This demo may render hurricane wash unusable.)
4.2 Project Milestone Plan. The contractor shall provide a project milestone plan and timeline for the Manganese and Zinc Phosphate vat systems project. The project milestone plan shall be detailed in a Gantt chart format and list all major tasks and subtasks required for successful completion of the project. The project milestone plan shall be in Microsoft Project format. The contractor may propose an alternate format for consideration by ANAD. If an alternate format is offered, ANAD will review and accept or reject the proposed alternate format. If the alternate format is rejected, the contractor must provide the plan in Microsoft Project format. The contractor shall submit the project milestone plan to the ANAD Contracting Officer no later than 7 calendar days after the date of contract award. ANAD will review the project milestone plan and either approve or reply with questions/comments to the contractor.
The project milestones plan must be approved by ANAD before the contractor begins work. The project milestone plan will include a start of work conference and at least one project design review.
4.3 System of Units. The equipment shall display all units of measure in the U.S.
Customary System of Units.
4.4 Equipment Location. The Manganese and Zinc Phosphate vat systems will be installed in the “plating area” of Building 31 at Anniston Army Depot, Anniston, Alabama. Utilities necessary for the operation of the Manganese and Zinc Phosphate vat systems will be accommodated when the contractors provides such information to the Government. Entrance into the room includes a twelve (15) foot wide roll-up door with indirect access to a ramp outdoors.
4.5 Electrical Requirements. The Manganese and Zinc Phosphate vat systems shall be designed to operate at most on 480 VAC, 3 phase, 60-hertz electrical power. The electrical system shall conform to National Fire Protection Association (NFPA) 79.
All electrical wiring and components shall be sized for 480 VAC operation.
4.6 Electrical Noise. The electrical power at ANAD is subject to noise. If the Manganese and Zinc Phosphate vat systems requires clean electrical power for proper operation, a properly sized power-conditioning unit shall be included with the Manganese and Zinc Phosphate vat systems.
4.7 Noise Level. Noise emitted by the Manganese and Zinc Phosphate vat systems shall be no greater than 80 decibels as measured per NASI S12.23-1989. The 80-decibel limit is absolute. Techniques such as sound level averaging or exposure time weighing shall not be used in meeting this requirement. Any Shields, baffles, enclosures or other devices required to bring the equipment into conformance with this requirement shall not interfere with visibility needed for safe operation of the Manganese and Zinc Phosphate vat systems. Operators shall be able to use this equipment without the need for hear protection.
4.8 Safety and Health Requirements. The Manganese and Zinc Phosphate vat systems shall be in compliance with Occupational Safety and Health Administration (OSHA) 29 CFR 1910. The Manganese and Zinc Phosphate vat systems shall include a manual emergency shutdown switch and shall have the ability to automatically shut down when under automatic control.
4.9 Ergonomics. The Manganese and Zinc Phosphate vat systems shall be ergonomically designed to prevent the occurrence of repetitive stress injuries.
4.10 Maintainability. The Manganese and Zinc Phosphate vat systems shall be constructed using commercial off-the-shelf components to the maximum extent possible to ensure the prompt availability of repair parts. The contractor shall provide evidence that repair parts and service for the Manganese and Zinc Phosphate vat systems are readily available. The contractor shall also provide information on the normal maintenance actions required for the Manganese and Zinc Phosphate vat systems including type of maintenance, require interval, mean time to perform maintenance and number and skill of people required to perform the maintenance actions.
4.11 Construction. The Manganese and Zinc Phosphate vat systems shall be constructed of corrosion resistant material to the maximum extent possible. Using all known applicable codes and guild lines. Use best industrial practices.
4.12 New Developments. If, during the contract period, any new developments are generated that would improve the efficiency, accuracy or productivity of the Manganese and Zinc Phosphate vat systems or would decrease its operation costs, the contractor shall immediately notify the Contracting Officer, in order that the new developments may, at the Government’s option, be included in the Manganese and Zinc Phosphate vat systems being manufactured hereto. All reports of such developments shall be addressed to the Contracting Officer ANAD.
4.13 Nameplate. A nameplate shall be attached to the Manganese and Zinc Phosphate vat systems oil heat sources and shall contain, as minimum, the following information:
4.13.1 Nomenclature.
4.13.2 Manufacturer’s name.
4.13.3 Serial number.
4.13.4 Model designation.
4.13.5 Power input (volts, total amperes, phase, and frequency)
4.13.6 Short-circuit/over current rating (if applicable).
4.13.7 Contract number or purchase order number.
4.13.8 National Stock Number (if applicable).
4.13.9 Date of manufacture.
4.14 Environmental Compliance. The Manganese and Zinc Phosphate vat systems provided under this contract shall meet all applicable Environmental Protection Agency (EPA) restrictions in effect on the date of the contract. These regulations apply to the emission of materials hazardous to the environment or the user’s health and shall be adhered to during the manufacture, service, transportation, storage, and operation of the Manganese and Zinc Phosphate vat systems.
5.0 Acceptance.
5.1 Conformance. The Manganese and Zinc Phosphate vat systems shall meet the requirements of this specification and conform to the manufacturer’s own drawings, specifications, standards, and quality assurance practices. The Government reserves the right to, at any time during the contract period, require proof of such conformance or to inspect the Manganese and Zinc Phosphate vat systems to determine compliance with the requirements of this specification.
5.2 Performance Test. Upon completion of Manganese and Zinc Phosphate vat systems installation, the contractor shall demonstrate the Manganese and Zinc Phosphate vat systems ability to meet the requirements of paragraph 4.1 herein. During these tests, conducted over 3 full production shifts with no faults, the contractor shall demonstrate proper operation of all Manganese and Zinc Phosphate vat systems controls, functions, and features. The Government will provide the components to be tested. All test must be witnessed by the ANAD Contracting Officer or Contracting Officer’s Representative. Should a malfunction or failure occur during any test, the contractor will correct the problem and repeat the entire test from the beginning.
5.3 Acceptance. The Government will accept the Manganese and Zinc Phosphate vat systems only after the contractor successfully completes the requirements of paragraphs 5.1, and 5.2 above and provides all training and documentation required herein. Final acceptance will be at Anniston Army Depot. Upon acceptance of all items described above, the contractor shall submit a completed DD Form 250 for signature by the government representative, as final acceptance of the equipment required by this specification (see solicitation for form & instructions).
6.0 Installation and Delivery
6.1 Delivery. The contractor shall be responsible for delivering the Manganese and Zinc
Phosphate vat systems to building 31 at Anniston Army Depot.
6.1.1 Shipping, Handling, and Storage. The contractor shall be responsible for all shipping, storage, and handling of the Manganese and Zinc Phosphate vat systems and all materials. The Government shall not be responsible for furnishing any labor, equipment, or warehouse space for the loading, unloading, transport, or storing of any materials. The Government will make available if possible, space for a contractor furnished trailer or van for the storage of materials. Trailer space will be made available as close to the job site as possible, depending on the parts stored in that area.
Should the contractor not wish to furnish a trailer for equipment storage, then the contractor shall coordinate with the Contracting Officer, a date at which time the contractor may deliver his equipment to the building.
Government shall only provide laydown space for one day worth of installation equipment.
6.2 Installation. The contractor shall be responsible for installing the Manganese and Zinc Phosphate vat systems to include all labor, materials, tools, and equipment required. The contractor shall be responsible for ensuring the Manganese and Zinc Phosphate vat systems installation requirements are compatible with existing facilities. A site layout for the Manganese and Zinc Phosphate vat systems is attached to this specification for reference. The contractor shall field verify all dimensions and locations of utilities at the installation site and report any discrepancies to the Contracting Officer before proceeding with installation. Any discrepancies not reported prior to beginning of installation shall become the responsibility of the contractor. Unless otherwise approved by the Contracting Officer, installation shall be done during normal depot working hours. The area near where the Manganese and Zinc Phosphate vat systems is to be installed is in operation. The contractor shall not interfere with ongoing Government operations and production unless authorized by the Contracting Officer. Installation shall be completed and the Manganese and Zinc Phosphate vat systems operational and accepted within 4 months or sooner after award of contract.
6.2.1 Instructions for Installation. Within 30 days after date of contract award, the contractor shall provide the Contracting Officer all information necessary for installation of the Manganese and Zinc Phosphate vat systems. The contractor shall provide four (4) copies of instructions for installation as specified on attached DD Form 1423. The Government will use these instructions to review utility and space requirements of the proposed Manganese and Zinc Phosphate vat systems. The installation documentation shall include, but not be limited to, the following:
6.2.1.1 Floor plan drawing of the Manganese and Zinc Phosphate vat systems and major Manganese and Zinc Phosphate vat systems components.
6.2.1.2 Space required around the Manganese and Zinc Phosphate vat systems after installation for maintenance purposes.
6.2.1.3 Foundation requirements, if any.
6.2.1.4 Maximum overall length, width, and height dimensions.
6.2.1.5 Approximate location of utility connections on the Manganese and
Zinc Phosphate vat systems.
6.2.1.6 All utility requirements including electrical, air, water, steam, drains, etc. To include amps, GPM, etc.
6.2.1.7 Minimum doorway opening required to bring Manganese and Zinc
Phosphate vat systems into the building.
6.2.1.8 Industrial waste disposal requirements, if any.
6.2.1.9 Approximate weight of the Manganese and Zinc Phosphate vat systems.
6.2.2 Electrical. All electrical work shall comply with American National
Standards Institute (ANSI) Publication C2 – National Electric Safety Code and with National Fire Prevention Association (NFPA) Publication No. 70
– National Electric Code. All materials used in the installation shall conform to applicable National Electrical Manufacturers Association (NEMA) and Underwriters Laboratory (UL) listings. Workmanship shall be in accordance with standard commercial practices. Electrical runs shall be installed perpendicular and parallel to existing facilities and the equipment to be installed. When equipment is installed near existing power lines, equipment shall be located for proper clearances in accordance with ANSI C2. New equipment shall not be connected to Government power without prior approval of the Contracting Officer. No high voltage work will be accomplished without prior approval of the Contracting Officer. All high voltage work shall be performed in the presence of a qualified Government electrician.
6.2.3 Plumbing. All plumbing work shall comply with National Association of Plumbing-Heating-Cooling Contractors/American Society of Plumbing Engineers (NAPHCC/ASPE) Publication - National Standard Plumbing
Code. All materials used in the installation of the equipment shall conform to industry standards and shall be compatible with and shall meet the performance requirements of the equipment being installed.
Workmanship shall be in accordance with standard commercial practice.
Runs shall be installed perpendicular and parallel with existing facilities and the equipment being installed. Bypasses shall not be installed at steam reducing stations. All heating coils shall be trapped independently.
Unless otherwise specified, steam and condensate piping shall be insulated with 1-1/2 inch thick calcium silicate with aluminum cover for outside lines and 1-1/2 inch thick fiberglass with all service jacket for interior lines unless subjected to water or vapor.
6.2.4 Concrete. Concrete used in the installation of the Manganese and Zinc Phosphate vat systems shall be Class A and shall have a minimum allowable compressive strength at 28 days of 3,000 PSI unless otherwise specified. Samples for concrete strength tests shall be provided, stored, and tested as directed. Unless otherwise specified, the contractor shall be responsible for the design of all concrete work, including formwork and reinforcing. Ready-mixed concrete shall be used and must be delivered and discharged within 45 minutes after the introduction of water to the cement and aggregate. Placing of concrete shall conform to Chapter 4 of the American Concrete Institute Standard ACI 318. Workmanship shall be in accordance with standard commercial practice.
6.2.5 Trades. Coordination of trades installing the equipment shall be the responsibility of the contractor.
6.2.6 Foundation Hardware. All foundation hardware shall be furnished by the contractor and included in the bid price.
6.2.7 Utilities. The Government will provide utilities within twenty (20) feet of the Manganese and Zinc Phosphate vat systems installation site. The capacities of the utilities (wire sizes, pipe sizes, etc.) will be based on information supplied by the contractor.
6.2.8 Electrical. The Government will run electrical lines and tie into a government furnished and installed main disconnect. The Government will furnish only one voltage to the site. Contractor shall tie into government supplied main disconnect.
6.2.9 Plumbing. The Government will run pipe to within 20 feet of the installation site. Nominal plant pressures supplied to the site will be as follows: Air 95 PSI
6.2.10 Equipment Protection. The contractor shall protect surrounding equipment and shop area from damage due to dust, debris etc., during the installation. The contractor is liable for any damage caused to existing Government equipment.
6.2.11 Site Cleanup. The contractor shall remove all debris, scrap material, trash, etc. from the job site daily. All trash shall be placed in Government provided roll-off boxes or drums. Anniston Army Depot will be responsible for disposal. ANAD will provide an outdoor location for the cleanup of contaminated material if requested by the contractor. No equipment will be provided by the Government to perform any of the work performed by the contractor.
7.0 Documentation. The contractor shall provide documentation with the Manganese and Zinc Phosphate vat systems as specified in paragraph 7.1 herein and on the attached DD Form 1423. The contractor shall provide three (3) printed copies and three electronic copies of all documentation. The electronic documentation shall be provided on compact discs (CD’s).
Electronic copies of the documentation shall be in Microsoft Office format (Word, Excel), Adobe Portable Document Format (PDF) or Hypertext Transfer Protocol (HTTP). Drawings and schematics may be provided in PDF, AutoCAD (.dwg) or Microstation (.dgn) format.
All documentation the contractor deems to be proprietary in nature shall be clearly marked.
The Government shall have the right to print additional hard copies of all documentation from the CD’s as needed.
7.1 Content. The documentation shall include the following as a minimum: operator’s manuals, maintenance manuals, calibration specifications/procedures, spare parts lists, catalogs, and programming/software manuals. In addition, any other documentation normally furnished with the Manganese and Zinc Phosphate vat systems shall be provided. All documentation shall be furnished in the English language only. The documentation shall meet the requirements of the following paragraphs.
7.1.1 Operator’s Manual. Operator’s manual shall include detailed information and instruction covering all Manganese and Zinc Phosphate vat systems controls and operation.
7.1.2 Maintenance Manual. Maintenance manuals shall include electrical, hydraulic, pneumatic, and ventilation system schematics and drawings, as applicable, detailed lockout/tag out procedures, detailed parts lists for all Manganese and Zinc Phosphate vat systems components, troubleshooting procedures, preventive maintenance requirements including schedules and detailed procedures for all required preventive maintenance activities, lubrication schedule, and any other maintenance procedures normally provided by the manufacturer. Schematics shall show and identify all parts down to and including components on printed circuit boards.
7.1.3 Spare Parts List. The spare parts list shall include the manufacturer’s recommended spare parts the Government should maintain for the Manganese and Zinc Phosphate vat systems being furnished. The listing shall be complete with part numbers and descriptions, recommended quantities, prices, and normal delivery time for the items.
7.2 Data Item Descriptions. As applicable, documentation provided by the contractor shall meet the requirements of the Data Item Descriptions (DID’s) below. These should be reviewed closely to determine which are applicable for each equipment procurement. A copy of applicable DID’s should be attached to the specification/statement of work. Copies are available on the DEQ drive at \Equipment Spec Template\Data Item Descriptions.
Title Identification Number Test/Inspection Report DI-NDTI-80809B
Commercial Drawings and Associated Lists DI-SESS-81003B Special Inspection Equipment Calibration Procedures DI-QCIC-81007 Commercial Off-The-Shelf (COTS) Manual and DI-TMSS-80527A Associated Supplemental Data Special Inspection Equipment Operating Instructions DI-QCIC-81005 Special Inspection Equipment Drawings and DI-SESS-81004B Associated Lists Special Inspection Equipment Descriptive Documentation DI-QCIC-81006 Calibration Certificate DI-QCIC-80798A Calibration System Description DI-QCIC-80906 Product Drawings and Associated Lists DI-SESS-81000B
8.0 Training. The contractor shall provide at least 8 hours of training to the following type of personnel:
Two engineers/technicians Three operators
Training shall be provided for programming, operation, calibration, and maintenance of the Manganese and Zinc Phosphate vat systems. Training shall be conducted at Anniston Army Depot during normal depot working hours. All training costs shall be included in the total bid price.
9.0 Warranty. Manganese and Zinc Phosphate vat systems shall be covered by a warranty. The warranty shall be for a period of not less than 1 year and shall begin the day following Government acceptance of the Manganese and Zinc Phosphate vat systems. During the warranty period, the contractor shall be responsible for all costs, including parts, labor, travel and lodging, required to complete repairs of any defects in Manganese and Zinc Phosphate vat systems material, parts or workmanship. The contractor shall respond to requests for warranty service within 48 hours after requests. The warranty shall be written in the Anniston Army Depot’s name.
(End of Summary of Changes)