Lowell Creek Flood Diversion Project - Industry Day JUL 2024.pdf
PDF 8 MB Posted
- Attached to
- LOWELL CREEK FLOOD DIVERSION AT SEWARD, ALASKA
- Solicitation number
- W911KB_LOWELL_CREEK_INDUSTRY_DAY
About this file
This document is an Industry Day presentation for the Lowell Creek Flood Diversion project in Seward, Alaska, conducted by the U.S. Army Corps of Engineers, Alaska District. The presentation provides an overview of the existing flood diversion system and the recommended plan to construct a new diversion dam, 18-foot diameter tunnel, and extended outfall structure. Key details include the project background, existing system features, geotechnical information, current design concepts, and logistics considerations such as laydown/staging areas and site access. The Industry Day is scheduled for July 23, 2024, with a site visit and one-on-one sessions. The purpose is to familiarize industry with the project requirements, receive feedback on construction sequencing, constructability, material handling, dewatering, and staging. A solicitation is not expected to be released prior to this event. The contract award for construction is anticipated in Q1 FY27.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sign In Sheet and One on Ones _ Scanned.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOWELL CREEK FLOOD
DIVERSION
Industry Day Presentation
Presenters:
Carly Lynch, PM Coleman Chalup P.E., Lead Engineer
Seward, AK
JUL 2024
The U.S. Army Corps of Engineers, Alaska District, is conducting an Industry Day to improve Industry's understanding of USACE's Lowell Creek Flood Diversion project, specifically for construction of the inlet structure, 18ft diameter tunnel and outlet flume located in Seward, Alaska, answer questions on the project and gain an understanding of how the contractor community can support this project.
Presentation Agenda (0900-1030)
• Welcome
• Introductions
• Project Overview
Site Visit (1030-1200)
One-on-ones (1200-1700)
• Sign-up sheet
PURPOSE & AGENDA
• The existing Lowell Creek Flood Diversion System authorized by the Flood Control Act of 1936 (PL 74-738) with an authorized project purpose of flood risk management.
• The flood diversion system reroutes Lowell Creek through Bear Mountain and diverts flows to Resurrection Bay prior to those flows entering Seward. Completed by USACE in 1940.
• Present structure has diversion dam, emergency spillway, and 10ft tunnel that is around 2000ft in length estimated to divert 2,800cfs
• Spillway is 800ft upstream of critical infrastructure including hospital and senior living center
PROJECT BACKGROUND
• System was designed to pass the largest event at that time of 2,800cfs which is now considered to have greater than 2% annual chance of exceedance.
• Landslides are commonplace in the basin and can contribute to an outburst surge of 2.5 times larger than existing stream flow.
• Basin above diversion is in steep, rugged, mountainous terrain with near endless supply of sediment.
• Sediment is transported through the tunnel and accumulates at the outfall, which in high water events cuts off Lowell Point road access and city uses heavy equipment to flood fight/manage debris at bridge.
• Accumulation of debris can also damage critical infrastructure at outfall including City’s sewage treatment facility, shellfish hatchery and Alaska SeaLife Center.
PROJECT BACKGROUND CONTINUED
• Identified feasible solution that provides safe, reliable, and efficient flood diversion of the waters from Lowell Creek during precipitation and surge events.
• This project reduces risk to:
life safety economic damages flood fighting activities reactionary debris management costs
• Project justified by reduction in risk to life safety
FEASIBILITY STUDY
EXISTING PROJECT FEATURES
N
S
EW
CURRENT DIVERSION FOR REPAIRS
2003 Repair
2017/18 Repair
The Recommended Plan as stated in the Director’s Memo is Alternative 4A: Construct New Flood Diversion System
RECOMMENDED PLAN
Components of this alternative include:
Diversion dam
18-ft-diameter tunnel capable of conveying ~8,500 cfs flow
Extending the outfall 150ft to take flow and debris over the Lowell Point Road
Protecting the tunnel inlet from landslide with a canopy
Non-structural components include select tree removal
Refurbishing the existing tunnel to provide backup for new diversion system and to accept diverted flow during inspection and maintenance
PROJECT OVERVIEW
AREA GEOLOGY
GEOPHYSICAL INTERPRETED BEDROCK
OUTFALL BORINGS AND GEOPHYSICS
A
BA
D
B
C
E
E CD
INLET BORINGS AND GEOPHYSICS
F
G
K J I
H
H
I
J
K
G F
CURRENT DESIGN – INLET & BYPASS
CURRENT DESIGN – INLET CHANNEL
6 ft
Short Curve
CURRENT DESIGN - OUTLET
TERRACING CONCEPT
• Terracing will allow any debris to flow away from tunnel inlet similar to canopy
• 12 - 15ft sloped benches
LAYDOWN/STAGING AREAS
Two areas identified as potential laydown/staging areas
Potential for utilizing Barge to assist with staging
Disposal area – Alaska Railroad new terminal area
~ 10 Miles from project site to laydown and staging area
Project Site
Snow Removal Area
Alaska Railroad Disposal
Laydown and Staging Area
NS
E W
SITE ACCESS
SITE VISIT
Outfall Meeting Location
Inlet Meeting Location
Library
QUESTIONS?
| Lowell creek flood diversion |
| Purpose & agenda |
| project Background |
| Project Background continued |
| Feasibility study |
| Existing project features |
| Current diversion for repairs |
| Recommended plan |
| Project overview |
| Area Geology |
| Geophysical Interpreted Bedrock |
| Outfall borings and geophysics |
| Inlet Borings and Geophysics |
| Current design – Inlet & bypass |
| Current Design – inlet channel |
| Current design - outlet |
| Terracing concept |
| Laydown/staging areas |
| Site Access |
| Site Visit |
| Questions? |