W911KB25R0019 AM0003.pdf
PDF 160 KB Posted
- Attached to
- FTG257 MISSILE FIELD 2 POWER REDUNDANCY
- Solicitation number
- W911KB25R0019
About this file
This document is a federal contract amendment (Standard Form 30) for solicitation W911KB25R0019, modifying the original Request for Proposal (RFP) for the FTG257 Missile Field 2 Power Redundancy project located at Fort Greely, Alaska. The amendment extends the proposal due date from 22-Apr-2025 to 29-Apr-2025 at 2:00 PM AKST and offers site visit photos upon request through DoDSafe. The project involves providing electrical power redundancy to Missile Field 2 silo interface vaults by adding Automatic Transfer Switches, Main Lug Only distribution panels, and modifying switchgear configurations. The contract is an 8(a) competitive, trade-off solicitation with a small business size standard of $45M, rated as a C2 DO order certified for national defense, emergency preparedness, and energy program use. Contractors are expected to begin performance within 10 calendar days and complete the project within 630 calendar days after receiving notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911KB25R0019 AM0008.pdf | ||
| SAM W911KB25R0019 AM0007.pdf | ||
| W911KB25R0019 AM0006.pdf | ||
| W911KB25R0019 AM0005.pdf | ||
| W911KB25R0019 AM0002.pdf | ||
| W911KB25R0019 AM0004.pdf | ||
| W911KB25R0019 AM0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/LOCATION: FTG257 MISSILE FIELD 2 POWER REDUNDANCY, FORT GREELY, ALASKA a.This amendment provides changes to the solicitation by extending the proposal due date to 29 April 2025 2:00 pm AKST and providing Site
Visit Photos upon request that w ill be sent through DoDSafe b.PROPOSAL DUE DATE HAS BEEN EXTENDED. Proposals shall be submitted in accordance w ith Section 00 21 00, Para 1.12,Proposal Submittals.
c.YOU ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE STANDARD FORM 1442.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB25R0019
X 9B. DATED (SEE ITEM 11)
19-Mar-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0003
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Apr-2025
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
2204 TALLEY AVENUE
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
a. The following drawings are substituted for the superseded documents/sections:
NONE
b. The following revised documents/sections are substituted for the superseded documents/sections. The identifier “AM#0003” appears before and after new and/or revised materials, except as noted below.
-The required response date/time has changed from 22-Apr-2025 02:00 PM to 29-Apr-2025 02:00 PM under Section 00 21 00, Para 1.12 in Book 1
-Site Visit Photos will be provided upon request that will be sent through DoDSafe
NOTE: Revisions within the following documents do not contain the above referenced identifiers:
- NONE
c. The following sections are deleted:
d. The following documents are added:
e. The following revisions are incorporated:
f. Other:
(End of Summary of Changes)
ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME.
PROJECT TITLE/LOCATION: FTG257 MISSILE FIELD 2 POWER REDUNDANCY, FORT GREELY, ALASKA
NAICS: 237130 SIZE STANDARD: $45M
8(a) COMPETITIVE - TRADE-OFF-SBA Requirement Number is GU1729277158K
PROJECT DESCIPTION: The purpose of the project is to provide electrical pow er redundancy to the Missile Field 2 silo interface vaults by adding Automatic Transfer Sw itches and Main Lug Only distribution panels w ith Molded Case Circuit Breakers. The SUS A & B sw itchgear w ill be physically separated, have enhanced coordination/protection features incorporated, and w ill be converted from a Main-Tie-Main to a
Main Tie-Tie-Main configuration. Additionally, the Pow er Control and Monitoring System (PCMS) and Pow er Quality Monitoring System (PQMS) w ill be extended to Missile Field 2.
Any Contract aw arded as a result of this solicitation w ill be C2 DO rated order certif ied for nation defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor w ill be required to follow all of the requirements of this regulation.
Period of Government acceptance shall be from the latest offer date entered in Block 20c.
BRITTNEY MORRISON 9077532739
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
19-Mar-2025
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________630 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________29 Apr 2025 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
2204 TALLEY AVENUE
JBER AK 99506-0898
W911KB
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 9077532739 TEL: FAX:
W911KB25R0019 203
AM0003...
...AM0003
File details come from the government source that posted it. Updated .