This abstract of bids summarizes offers received in response to Solicitation Number W911KB24B0001 for repair and maintenance dredging services at St. Paul Harbor in St. Paul Island, Alaska. The U.S. Army Corps of Engineers solicited bids that were due by January 18, 2024 for dredging the entrance channel and maneuvering areas, constructing scour protection, and conducting surveys. Base requirements included mobilization, dredging 59,000 cubic yards, and surveys. Options covered additional dredging, reef and channel repairs, and interim surveys through 2024. The government estimate was $23.6 million for base and options. Two contractors submitted bids, with Western Marine the apparent low bidder at $31.6 million and Duwamish Pacific Joint Venture next at $49.5 million. The contract will be awarded on a firm-fixed price basis following standard wage requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES
15-Nov-2023 18-Jan-2024
DATE SIGNED
ITEM NO. ITEM DESCRIPTION
EST.
QUANTITY UNIT
UNIT
PRICE
ESTIMATED
AMOUNT
UNIT
PRICE AMOUNT
UNIT
PRICE AMOUNT
0001 Mobilization and Demobilization, complete 1 JOB $3,400,000.00 $3,400,000.00 $7,000,000.00 $7,000,000.00 $6,305,000.00 $6,305,000.00 0002 Dredge and Placement, Entrance Channel, Complete.
0002AA First 35,000 cubic yards 35,000 CY $59.00 $2,065,000.00 $150.00 $5,250,000.00 $60.00 $2,100,000.00 0002AB All Over 35,000 cubic yards 24,700 CY $59.00 $1,457,300.00 $40.00 $988,000.00 $45.00 $1,111,500.00
0003 Dredge and Placement, Maneuvering Area, Complete. 1 JOB 0003AA First 17,300 cubic 17,300 CY $75.00 $1,297,500.00 $140.00 $2,422,000.00 $60.00 $1,038,000.00 0003AB All Over 17,300 8,500 CY $75.00 $637,500.00 $40.00 $340,000.00 $45.00 $382,500.00
0004 Hydrographic Survey, complete. 2 EA $100,000.00 $200,000.00 $100,000.00 $200,000.00 $196,450.00 $392,900.00 Total of Base Items CLINS 0001 thru 0004 $9,057,300.00 $16,200,000.00 $11,329,900.00
0005 Mobilization and Demobilization for Option Items 0006 – 0008, complete 1 JOB $3,400,000.00 $3,400,000.00 $1,000,000.00 $1,000,000.00 $3,900,000.00 $3,900,000.00
0006 Dredge and Placement, Small Boat Harbor Maneuvering Area, Complete.
0006AA First 6,100 cubic yards 6,100 CY $53.00 $323,300.00 $140.00 $854,000.00 $55.00 $335,500.00 0006AB All Over 6,100 cubic yards 900 CY $53.00 $47,700.00 $30.00 $27,000.00 $40.00 $36,000.00
0007 Dredge and Placement, Small Boat Harbor Maneuvering Area, Complete.
0007AA First 3,700 Cubic Yards 3,700 CY $64.00 $236,800.00 $140.00 $518,000.00 $55.00 $203,500.00 0007AB All Over 3,700 Cubic Yards 2,100 CY $64.00 $134,400.00 $30.00 $63,000.00 $40.00 $84,000.00
0008 Dredge and Placement, Sediment Mangement Area, complete 0008AA First 23,300 Cubic yards 23,300 CY $53.00 $1,234,900.00 $140.00 $3,262,000.00 $87.00 $2,027,100.00 0008AB All over 23,300 cubic yards 5,400 CY $53.00 $286,200.00 $30.00 $162,000.00 $65.00 $351,000.00
0009 Hydrographic Interim Condition Survey, Complete 6 EA $50,000.00 $300,000.00 $50,000.00 $300,000.00 $67,500.00 $405,000.00 0010 Mobilization and Demobilization for Option Items 0011-0014, complete 1 JOB $6,100,000.00 $6,100,000.00 $3,000,000.00 $3,000,000.00 $6,660,000.00 $6,660,000.00 0011 Repair Reef 2, Reef Rock, complete
0011AA First 5,700 cubic yards 5,700 CY $84.00 $478,800.00 $330.00 $1,881,000.00 $600.00 $3,420,000.00 0011AB All over 5,700 cubic yards 5,700 CY $84.00 $478,800.00 $50.00 $285,000.00 $570.00 $3,249,000.00
0012 Repair Reef 3, Reef Rock, complete 0012AA First 5,500 cubic yards 5,500 CY $84.00 $462,000.00 $330.00 $1,815,000.00 $600.00 $3,300,000.00 0012AB All over 5,500 cubic yards 4,900 CY $84.00 $411,600.00 $50.00 $245,000.00 $570.00 $2,793,000.00
0013 Construct Entrance Channel Scour Protection, Scour Rock I, complete
0013AA First 2,700 cubic yards 2,700 CY $84.00 $226,800.00 $330.00 $891,000.00 $600.00 $1,620,000.00 0013AB All over 2,700 cubic yards 2,200 CY $84.00 $184,800.00 $50.00 $110,000.00 $570.00 $1,254,000.00
0014 Construct Small Boat Harbor Entrance Channel Scour Protection, Scour Rock II, complete 3,000 CY $84.00 $252,000.00 $330.00 $990,000.00 $475.00 $1,425,000.00
Total of Optional Items 0005 thru 0014 $14,558,100.00 $15,403,000.00 $31,063,100.00 Total of Base and Option Items $23,615,400.00 $31,603,000.00 $42,393,000.00
Yes
B. BID SECURTIY (TYPE AND AMOUNT) B. BID SECURTIY (TYPE AND AMOUNT)
Yes
ABSTRACT OF BIDS - CONSTRUCTION
1. SOLICITATION NUMBER
W911KB24B0001
4. ISSUING OFFICE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
7. NAME AND TITLE OF CERTIFYING OFFICIAL (TYPED)
U.S. Army Engineer District, Alaska PO Box 6898
JBER, AK 99506-6898
George Nasif, Contracting Officer
SIGNATURE
9. OFFERS
Yes
6. NUMBER OF AMENDMENTS ISSUED C. AMENDEMENTS ACKNOWLEDGED C. AMENDEMENTS ACKNOWLEDGED
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE
(Check A, B, C and complete D, E, and F)
No. 01 No. 02 St. Paul Harbor Repairs and Maintenance Dredging, St. Paul Island, Alaska A. OFFEROR A. OFFEROR
Western Marine Duwamish Pacific Joint Venture
1 Amendment Yes
2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES
15-Nov-2023 18-Jan-2024
DATE SIGNED
ITEM NO. ITEM DESCRIPTION
EST.
QUANTITY UNIT
UNIT
PRICE
ESTIMATED
AMOUNT
UNIT
PRICE AMOUNT
UNIT
PRICE AMOUNT
0001 Mobilization and Demobilization, complete 1 JOB $3,400,000.00 $3,400,000.00 $18,614,000.00 $18,614,000.00 $0.00 0002 Dredge and Placement, Entrance Channel, Complete.
0002AA First 35,000 cubic yards 35,000 CY $59.00 $2,065,000.00 $150.00 $5,250,000.00 $0.00 0002AB All Over 35,000 cubic yards 24,700 CY $59.00 $1,457,300.00 $105.00 $2,593,500.00 $0.00
0003 Dredge and Placement, Maneuvering Area, Complete. 1 JOB 0003AA First 17,300 cubic 17,300 CY $75.00 $1,297,500.00 $150.00 $2,595,000.00 $0.00 0003AB All Over 17,300 8,500 CY $75.00 $637,500.00 $105.00 $892,500.00 $0.00
0004 Hydrographic Survey, complete. 2 EA $100,000.00 $200,000.00 $60,000.00 $120,000.00 $0.00 Total of Base Items CLINS 0001 thru 0004 $9,057,300.00 $30,065,000.00 $0.00
0005 Mobilization and Demobilization for Option Items 0006 – 0008, complete 1 JOB $3,400,000.00 $3,400,000.00 $100,000.00 $100,000.00 $0.00
0006 Dredge and Placement, Small Boat Harbor Maneuvering Area, Complete.
0006AA First 6,100 cubic yards 6,100 CY $53.00 $323,300.00 $90.00 $549,000.00 $0.00 0006AB All Over 6,100 cubic yards 900 CY $53.00 $47,700.00 $80.00 $72,000.00 $0.00
0007 Dredge and Placement, Small Boat Harbor Maneuvering Area, Complete.
0007AA First 3,700 Cubic Yards 3,700 CY $64.00 $236,800.00 $90.00 $333,000.00 $0.00 0007AB All Over 3,700 Cubic Yards 2,100 CY $64.00 $134,400.00 $80.00 $168,000.00 $0.00
0008 Dredge and Placement, Sediment Mangement Area, complete 0008AA First 23,300 Cubic yards 23,300 CY $53.00 $1,234,900.00 $90.00 $2,097,000.00 $0.00 0008AB All over 23,300 cubic yards 5,400 CY $53.00 $286,200.00 $80.00 $432,000.00 $0.00
0009 Hydrographic Interim Condition Survey, Complete 6 EA $50,000.00 $300,000.00 $40,000.00 $240,000.00 $0.00 0010 Mobilization and Demobilization for Option Items 0011-0014, complete 1 JOB $6,100,000.00 $6,100,000.00 $2,000,000.00 $2,000,000.00 $0.00 0011 Repair Reef 2, Reef Rock, complete
0011AA First 5,700 cubic yards 5,700 CY $84.00 $478,800.00 $500.00 $2,850,000.00 $0.00 0011AB All over 5,700 cubic yards 5,700 CY $84.00 $478,800.00 $460.00 $2,622,000.00 $0.00
0012 Repair Reef 3, Reef Rock, complete $0.00 0012AA First 5,500 cubic yards 5,500 CY $84.00 $462,000.00 $500.00 $2,750,000.00 $0.00 0012AB All over 5,500 cubic yards 4,900 CY $84.00 $411,600.00 $460.00 $2,254,000.00 $0.00
0013 Construct Entrance Channel Scour Protection, Scour Rock I, complete
0013AA First 2,700 cubic yards 2,700 CY $84.00 $226,800.00 $500.00 $1,350,000.00 $0.00 0013AB All over 2,700 cubic yards 2,200 CY $84.00 $184,800.00 $460.00 $1,012,000.00 $0.00
0014 Construct Small Boat Harbor Entrance Channel Scour Protection, Scour Rock II, complete 3,000 CY $84.00 $252,000.00 $200.00 $600,000.00 $0.00
Total of Optional Items 0005 thru 0014 $14,558,100.00 $19,429,000.00 $0.00 Total of Base and Option Items $23,615,400.00 $49,494,000.00 $0.00
Yes
B. BID SECURTIY (TYPE AND AMOUNT)
6. NUMBER OF AMENDMENTS ISSUED
B. BID SECURTIY (TYPE AND AMOUNT)
C. AMENDEMENTS ACKNOWLEDGED C. AMENDEMENTS ACKNOWLEDGED
Yes
ABSTRACT OF BIDS - CONSTRUCTION
1. SOLICITATION NUMBER
W911KB24B0001
4. ISSUING OFFICE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE
(Check A, B, C and complete D, E, and F)
No. 03 No. 04
7. NAME AND TITLE OF CERTIFYING OFFICIAL (TYPED)
U.S. Army Engineer District, Alaska PO Box 6898
JBER, AK 99506-6898
George Nasif, Contracting Officer
SIGNATURE
9. OFFERS
St. Paul Harbor Repairs and Maintenance Dredging, St. Paul Island, Alaska A. OFFEROR A. OFFEROR
Camenzind Dutra
1 Amendment
Solicitation Number W911KB24B0001 Project Title St. Paul Harbor Repairs and Maintenance Dredging, St. Paul Island, Alaska Date Issued 11/15/2023 Date Opened 1/18/2024
Offeror Total Base + Options
IGE $23,615,400.00
Western Marine $31,603,000.00 0 $0.00
0 #REF!
0 #REF!
0 #REF!
0 $0.00 0 $0.00 0 $0.00
| IGE & Offeror 1-2 |
| IGE & Offerors 3-4 |
| Apparent Low Bidder |
| 2024-01-24T14:25:58-0900 | |
| NASIF.GEORGE.GODDARD.1012956920 |