CLR049 Amendment 02.pdf
PDF 1015 KB Posted
- Attached to
- CLR049 84 Person Dormitory, Clear AFS, Alaska
- Solicitation number
- W911KB22R0016
About this file
This document provides information on Amendment 02 to solicitation W911KB22R0016 for the 84 Person Dormitory project at Clear Space Force Station in Alaska.
The amendment revises sections 00 21 00 and 00 22 10 of the solicitation. It reduces the number of similar past project references required from ten to six years. It also requires electronic copies of the proposal and CAD files to be submitted in PDF and AutoCAD formats respectively. The proposal due date is extended to November 18, 2022 at 2PM Alaska Time.
The solicitation is for a design-build project to construct a new three-story 84-person dormitory. The agency is the U.S. Army Corps of Engineers Engineering District Alaska. Firms are required to demonstrate experience with similar sized and scoped construction projects. Proposals will be evaluated based on qualifications and past performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CLR049 AM01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLR049
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE/DESCRIPTION: 84 Person Dormitory, Clear SFS, Alaska (CLR049)
The purpose of this Amendment is to revise section 00 21 00, and section 00 22 10 as outlined in the attached pages. The proposal due date and time remains 18 November 2022, 2PM Alaska Standard Time.
All other terms and conditions outlined in the Solicitiation remain the same.
POC for this Amendment is Ron Jackson, 907 753-5596.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Nov-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911KB22R0016
X 9B. DATED (SEE ITEM 11)
30-Sep-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Nov-2022
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
2204 TALLEY AVENUE
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
Section 00 21 00 W911KB22R0016
Section 00 21 00 Page 5 prescribed herein. Within each Tab, it is recommended that the proposal information be presented in the same relative format as the submission requirements are listed.
(i) The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number and email address shall appear in the lower left corner of the title page of any document/volume to be evaluated.
(ii) Volume number, section, page number and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary). Page numbering shall re-start with each
Tab. One (1) page is defined as the front of one (1) sheet; the front and back of one (1) sheet will be counted as two (2) pages. The Government will not evaluate any material exceeding the page limitations stated in the RFP.
(b) Drawing sheets: Use 11” x 17” for half size drawings.
(c) Electronic Format: Provide proposal in searchable, read-only format, preferably using .pdf files. All price breakdown information to aide in the price evaluation shall be submitted in Excel format.
(d) Number of copies: For Phase 1, submit one electronic copy via PIEE Solicitation Module as described in paragraph 1.9. For Phase 2, submit one electronic copy of proposal via PIEE Solicitation Module to be received no later than the date and time stated on the Standard Form (SF) 1442 or subsequent solicitation amendment. Phase 2
Proposal may be broken down into separate files as required due to size and format.
AM#02…The successful contractor shall provide one (1) searchable, read only electronic (*.pdf) copy of the entire
Volumes 1 and 2, and one (1) copy of all CADD files using Autodesk Civil 3D 2021……AM#02
1.11. JOINT VENTURE AND LLC PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.
If this is an 8(a) or HUBZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.
When proposing as a Limited Liability Company (LLC), a member authorized to bind the LLC shall sign the SF
1442. A copy of the LLC Certificate of Organization, Articles of Organization and the Operating Agreement shall be submitted with the Phase 1 proposal.
On SF 25 and 25A, Bonds, where it requests “State of Incorporation,” the LLC should instead put the “State of
Organization.” In the Principal’s signature block, the signatory shall indicate whether he or she is signing as a member, manager, or both. Instead of a “Corporate Seal” attach the Certificate of Formation or Certificate of
Organization, as appropriate, which should indicate the signatory’s authority to bind the LLC.
1.12. BUY AMERICAN ACT FOR CONSTRUCTION MATERIALS
Section 00 22 10 W911KB22R0016
Section 00 22 10 Page 15
OFFEROR CONSTRUCTION, DESIGN FIRM OR IN-HOUSE DESIGN CAPABILITY
EXPERIENCE FORM SECTION 00 22 10 - ATTACHMENT 2
Provide the following information to show examples of projects your company constructed within the last AM#02…ten (10) six (6)…AM#02 years indicating experience with projects of similar type and scope. Use one form per project.
(a) Type of Facility Represented____________________________________________________________
(b) Your Firm’s Name ________________________________________________________________________
(c) Name of Project (Include contract number if Federal project)_______________________________________
(d) Location of Project________________________________________________________________________
(e) Owner _________________________________________________________________________________
(f) General Scope of Construction Project ________________________________________________________
(g) Your Role in Construction or Design of this Project (Prime, Joint Venture, or Subcontractor, etc.) and Work Your Company Self-Performed :
(h) Construction Cost ________________________________________________________________________
(i) Extent and Type of Work You Subcontracted Out _______________________________________________
(j) Dates Construction: Began___________________ Completed______________
(k) Your Performance Evaluation by Owner, if known _______________________________________________
(l) Were You Terminated or Assessed Liquidated Damages? ________________________________________
(If either is “Yes”, attach an Explanation)
(m) Owner’s Point of Contact for Reference (Name and Company) _____________________________________
(n) Current Telephone Number of Reference POC__________________________________________________
(o) Current Email Address of Reference POC______________________________________________________
File details come from the government source that posted it. Updated .