GFI-4.pdf
PDF 62 KB Posted
- Attached to
- Moose Creek Dam Quality Assurance Laboratory
- Solicitation number
- W911KB21R0032
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911KB21R0032 0001.pdf | ||
| Questions and Answers Posted to SAM.pdf | ||
| GFI-3 Dwgs-CHL023-RFP.pdf | ||
| GFI-2 Specs-CHL023-RFP.pdf | ||
| GFI-1.pdf | ||
| B.08.02 W911KB21R0032.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date:
Driller's Name:
Borehole Logger's Name:
COR(s):
Hole Diameter (in):
Actual Depth of VB Hole (ft)1:
CT #:
AT #:
Depth Min. (ft) Max. (ft) Run QA QC
Top 1/3
Middle 2/3
Bottom 3/3
Date: Date:
Depth: Depth:
OPTV CCTV
Northing:
Bottom of Wall (EL):
Run (ft)
Core Sample Depth (ft.)Core Samples Locations Ranges (ft)
Top of Wall (EL):
Ground Elevation (ft):
Station:
Easting:
Center of Panel, Overlap, or Joint:
Panel Completion Date:
Panel Number(s):
Verification Boring Number:
Mechanical Breaks Depths (ft.)3
Pits, Vugs, Rod drops, Water Loss, Change in drill water color, etc.)
Planned Depth of VB Hole (ft):
Depth to Bottom of Wall (ft):
Depth to Top of Wall (ft):
Descriptions
Decommisioned Date:
Saturation of Borehole
Falling Head Test
End Date, Time, Water Depth (ft):
Start Date, Time, Water Depth (ft):
Start Time:
Easting:Total Vector Deviation: Northing:
RQD Rec.
Drill Time
End Time:
Start Time:
Verification Drilling and Field Permeability Testing QA Form
Automatic Cutoff Wall Reading2:
Manual Cutoff Wall Reading:
Manual Water Depth (top of casing) at End (ft):
Manual Water Depth (top of casing) at Start (ft):
End Date & Time:
Start Date & Time:
End Time:
File details come from the government source that posted it. Updated .