This draft solicitation is for environmental remediation services multiple award task order contracts, primarily in Alaska. Up to five contractors may be awarded indefinite delivery/indefinite quantity contracts with a maximum shared capacity of $140 million over five years. Contractors will be awarded task orders to perform investigations, remediation, compliance, and operation and maintenance activities at hazardous waste sites on a firm-fixed-price, fixed-price with economic adjustment, or cost-plus-fixed-fee basis. The response deadline for industry questions on the draft solicitation is March 15, 2019. The contracts will be set aside for small businesses under NAICS code 562910 for environmental remediation services.

DRAFT RFP_ERS USACE ALASKA DISTRICT W911KB198R0007 - Seeking Industry Feedback

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

handcarried, in the depository located in See Section B until 02:00 PM local time XX MONTH 2019

X

A X B X C

D

EX

X G F 303 - 325

326 - 364 X H 365 - 373 clara.d.sullivan@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

D0 1 373

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W911KB 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 2 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

CLARA D SULLIVAN 907-753-2851

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 20

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

21 - 29 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

30 - 31 32 - 33

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 34 - 43 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 44 - 53 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

54 - 252

PART II - CONTRACT CLAUSES

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

253 - 302

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

11 Mar 2019

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W911KB19R0007

Section A - Solicitation/Contract Form

EXECUTIVE SUMMARY

1. The objective of this contract is to provide Environmental Remediation Services (ERS) in support of a wide range of customers serviced by the U.S. Army Corps of Engineers (USACE), Alaska District. In addition to the Air Force and Army military stakeholders, USACE Alaska District customers can include U.S. Forest Service (USFS), U.S. Coast Guard (USCG), Federal Aviation Administration (FAA), National Oceanic and Atmospheric Administration (NOAA), Environmental Protection Agency (EPA), and Bureau of Land Management (BLM). Environmental remediation work executed under this ERS contract will include a full range of environmental investigations, studies, engineering support, remedial designs, removal and remedial actions and operations and maintenance activities for the USACE Alaska District customers. The multiple-award indefinite-delivery indefinite-quantity (IDIQ) contract tools are anticipated to support various environmental programs within the USACE Alaska District, to include but not limited to the Formerly Used Defense Sites (FUDS) program, Air Force Installation Restoration (IRP), Air Force Environmental Quality (EQ), Army EQ, Army IRP, and Native American Lands Environmental Mitigation Program (NALEMP). The USACE Alaska District is part of the USACE Pacific Ocean Division (POD) which encompasses all areas covered by the U.S. Pacific Command (USPACOM). Primary performance locations will be within the State of Alaska, but some work may be performed outside of Alaska but within the USACE POD area of responsibility (AOR).

2. There are up to five (5) Multiple Award Task Order Contracts (MATOC) anticipated under this solicitation, W911KB19R0007; however, the Government reserves the right to award more, less, or none at all. This requirement is being competed as a 100% Total Small Business Set-Aside under the North American Industry Classification System (NAICS) Code 562910, Environmental Remediation Services. All awards issued under this solicitation will share a total ceiling capacity of $140 Million (M).

3. All resultant contracts awarded from this solicitation will constitute multiple award IDIQ type contracts as defined in the Federal Acquisition Regulation (FAR) 16.504. Task orders will be awarded against the IDIQ contract using the fair opportunity procedures discussed in FAR 16.5, in addition to competition requirements identified in Defense FAR Supplement (DFARS) 216.505-70. All MATOC awardees will be afforded fair opportunity to be considered for award of each order exceeding $3.5K, unless an exception described in FAR 16.505(b)(2) applies. Task orders may be firm-fixed price (FFP), fixed price with economic price adjustment (FP-EPA), or cost plus fixed fee – completion form (CPFF-CF). It is anticipated that the majority of task order efforts will be fixed price (FFP or FP-EPA). This solicitation is for a three (3) year base period, with two (2) 1-year options to extend performance. These are ordering periods where task orders will be issued for services as described in Section C and ordered in accordance with Section G. The ordering period shall commence upon the date of contract award and continue for a base period of three (3) years, and may continue with two (2) 1-year option periods if exercising of the options is determined to be in the Government’s best interest. Per FAR Clause 52.216-19, Order Limitations, the minimum order for this acquisition is $25K, with a maximum order amount of $10M for a single task order, and $50M maximum for combined task orders. Task Order requests for proposal (RFP) will require offerors to provide sufficient detail with regard to labor categories, hours, material, and travel (if applicable) to allow an evaluation of proposed price or cost(s). Travel costs shall not exceed the amounts allowed under the Joint Travel Regulation. Profit is not allowable on travel costs.

4. The USACE Alaska District will remain the Procurement Contracting Office and no other agency can make changes to any IDIQ award or resultant contract.

5. The minimum guarantee amount for each MATOC awardee shall be $10K for the entire contract, including option periods, if exercised.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

ENVIRONMENTAL REMEDIATION SERVICES - 3YR

FFP

Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite Quantity (IDIQ) for Environmental Remediation Services, Various Locations, Alaska. Period of Performance: Task orders for the Base Period may be awarded up to 3 years after date of contract award. The contractor will be required to furnish all materials, equipment, and personnel necessary to manage and accomplish the job. Execute a full range of environmental remediation services including, but not limited to, investigations, studies, engineering support, remedial actions, and operation and maintenance activities related to Hazardous Toxic and Radioactive Waste (HTRW); contaminated soil, and contaminated groundwater.

Requirements may be under the Formerly Used Defense Sites (FUDS) program or executed for military or non-military requirements. Task orders awarded are subject to the maximum burdened labor rates set forth in the contract.

CUMULATIVE AMOUNT OF TASK ORDERS AWARDED UNDER ALL

CONTRACTS IN THE IDIQ MATOC POOL SHALL NOT EXCEED $140M

FOR THE LIFE OF THE CONTRACT INCLUDING ANY OPTION PERIOD(S).

Awarded Contracts will share an estimated capacity for this CLIN of $95M;

however the Government reserves the right to move unused capacity between CLINs/performance periods as required by operational necessity and will move capacity value from base period CLIN as needed if option years are exercised.

FOB: Destination

NET AMT

0002 1 Job

ENVIRONMENTAL REMEDIATION SERVICES - 3YR

FP-EPA

Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite

Quantity (IDIQ) for Environmental Remediation Services, Various Locations, Alaska. Period of Performance: Task orders for the Base Period may be awarded up to 3 years after date of contract award. The contractor will be required to furnish all materials, equipment, and personnel necessary to manage and accomplish the job. Execute a full range of environmental remediation services including, but not limited to, investigations, studies, engineering support, remedial actions, and operation and maintenance activities related to Hazardous Toxic and Radioactive Waste (HTRW); contaminated soil, and contaminated groundwater.

Requirements may be under the Formerly Used Defense Sites (FUDS) program or executed for military or non-military requirements. Task orders awarded are subject to the maximum burdened labor rates set forth in the contract.

CUMULATIVE AMOUNT OF TASK ORDERS AWARDED UNDER ALL

CONTRACTS IN THE IDIQ MATOC POOL SHALL NOT EXCEED $140M

FOR THE LIFE OF THE CONTRACT INCLUDING ANY OPTION PERIOD(S).

Awarded Contracts will share an estimated capacity for this CLIN of $5M;

however the Government reserves the right to move unused capacity between CLINs/performance periods as required by operational necessity and will move

0003 Job

ENVIRONMENTAL REMEDIATION SERVICES - 3YR

CPFF

Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite Quantity (IDIQ) for Environmental Remediation Services, Various Locations, Alaska. Period of Performance: Task orders for the Base Period may be awarded up to 3 years after date of contract award. The contractor will be required to furnish all materials, equipment, and personnel necessary to manage and accomplish the job. Execute a full range of environmental remediation services including, but not limited to, investigations, studies, engineering support, remedial actions, and operation and maintenance activities related to Hazardous Toxic and Radioactive Waste (HTRW); contaminated soil, and contaminated groundwater. Requirements may be under the Formerly Used Defense Sites (FUDS) program or executed for military or non-military requirements. Task orders awarded are subject to the maximum burdened labor rates set forth in the contract.

CUMULATIVE AMOUNT OF TASK ORDERS AWARDED UNDER ALL

CONTRACTS IN THE IDIQ MATOC POOL SHALL NOT EXCEED $140M

FOR THE LIFE OF THE CONTRACT INCLUDING ANY OPTION

PERIOD(S). Awarded Contracts will share an estimated capacity of $15M for this CLIN total; however the Government reserves the right to move unused capacity between CLINs/performance periods as required by operational necessity.

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

1001 1 Job

OPTION ENVIRONMENTAL REMEDIATION SERVICES - 1YR

FFP

Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite Quantity (IDIQ) for Environmental Remediation Services, Various Locations, Alaska. Period of Performance: Task orders for the Option 1 Period may be awarded up to 1 year after date of contract option exercise. The contractor will be required to furnish all materials, equipment, and personnel necessary to manage and accomplish the job. Execute a full range of environmental remediation services including, but not limited to, investigations, studies, engineering support, remedial actions, and operation and maintenance activities related to Hazardous Toxic and Radioactive Waste (HTRW); contaminated soil, and contaminated groundwater.

Requirements may be under the Formerly Used Defense Sites (FUDS) program or executed for military or non-military requirements. Task orders awarded are subject to the maximum burdened labor rates set forth in the contract.

CUMULATIVE AMOUNT OF TASK ORDERS AWARDED UNDER ALL

CONTRACTS IN THE IDIQ MATOC POOL SHALL NOT EXCEED $140M

FOR THE LIFE OF THE CONTRACT INCLUDING ANY OPTION PERIOD(S).

Awarded Contracts will share an estimated capacity of $10M for this CLIN total;

however, the Government reserves the right to move unused capacity between CLINs/performance periods as required by operational necessity and will move

1002 1 Job

OPTION ENVIRONMENTAL REMEDIATION SERVICES - 1YR

FP-EPA

Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite

Quantity (IDIQ) for Environmental Remediation Services, Various Locations, Alaska. Period of Performance: Task orders for the Option 1 Period may be awarded up to 1 year after date of contract option exercise. The contractor will be required to furnish all materials, equipment, and personnel necessary to manage and accomplish the job. Execute a full range of environmental remediation services including, but not limited to, investigations, studies, engineering support, remedial actions, and operation and maintenance activities related to Hazardous Toxic and Radioactive Waste (HTRW); contaminated soil, and contaminated groundwater.

Requirements may be under the Formerly Used Defense Sites (FUDS) program or

FOR THE LIFE OF THE CONTRACT INCLUDING ANY OPTION PERIOD(S).

Awarded Contracts will share an estimated capacity of $500K for this CLIN total;

however, the Government reserves the right to move unused capacity between CLINs/performance periods as required by operational necessity and will move

1003 Job

OPTION ENVIRONMENTAL REMEDIATION SERVICES - 1YR

CPFF

Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite Quantity (IDIQ) for Environmental Remediation Services, Various Locations, Alaska. Period of Performance: Task orders for the Base Period may be awarded up to 3 years after date of contract award.. The contractor will be required to furnish all materials, equipment, and personnel necessary to manage and accomplish the job. Execute a full range of environmental remediation services including, but not limited to, investigations, studies, engineering support, remedial actions, and operation and maintenance activities related to Hazardous Toxic and Radioactive Waste (HTRW); contaminated soil, and contaminated groundwater. Requirements may be under the Formerly Used Defense Sites (FUDS) program or executed for military or non-military requirements. Task orders awarded are subject to the maximum burdened labor rates set forth in the contract.

CUMULATIVE AMOUNT OF TASK ORDERS AWARDED UNDER ALL

CONTRACTS IN THE IDIQ MATOC POOL SHALL NOT EXCEED $140M

FOR THE LIFE OF THE CONTRACT INCLUDING ANY OPTION

PERIOD(S). Awarded Contracts will share an estimated capacity of $4M for this CLIN total; however, the Government reserves the right to move unused capacity between CLINs/performance periods as required by operational necessity and will move capacity value from base period CLIN as needed if option years are exercised.

2001 1 Job

OPTION ENVIRONMENTAL REMEDIATION SERVICES - 1YR

FFP

Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite Quantity (IDIQ) for Environmental Remediation Services, Various Locations, Alaska. Period of Performance: Task orders for the Base Period may be awarded up to 3 years after date of contract award.. The contractor will be required to furnish all materials, equipment, and personnel necessary to manage and accomplish the job. Execute a full range of environmental remediation services including, but not limited to, investigations, studies, engineering support, remedial actions, and operation and maintenance activities related to Hazardous Toxic and Radioactive Waste (HTRW); contaminated soil, and contaminated groundwater.

Requirements may be under the Formerly Used Defense Sites (FUDS) program or executed for military or non-military requirements. Task orders awarded are subject to the maximum burdened labor rates set forth in the contract.

CUMULATIVE AMOUNT OF TASK ORDERS AWARDED UNDER ALL

CONTRACTS IN THE IDIQ MATOC POOL SHALL NOT EXCEED $140M

FOR THE LIFE OF THE CONTRACT INCLUDING ANY OPTION PERIOD(S).

Awarded Contracts will share an estimated capacity of $6M for this CLIN total;

however, the Government reserves the right to move unused capacity between CLINs/performance periods as required by operational necessity and will move

2002 1 Job

OPTION ENVIRONMENTAL REMEDIATION SERVICES - 1YR

FP-EPA

Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite

Quantity (IDIQ) for Environmental Remediation Services, Various Locations, Alaska. Period of Performance: Task orders for the Base Period may be awarded up to 3 years after date of contract award.. The contractor will be required to furnish all materials, equipment, and personnel necessary to manage and accomplish the job. Execute a full range of environmental remediation services including, but not limited to, investigations, studies, engineering support, remedial actions, and operation and maintenance activities related to Hazardous Toxic and Radioactive Waste (HTRW); contaminated soil, and contaminated groundwater.

Requirements may be under the Formerly Used Defense Sites (FUDS) program or

FOR THE LIFE OF THE CONTRACT INCLUDING ANY OPTION PERIOD(S).

Awarded Contracts will share an estimated capacity of $500K for this CLIN total;

however, the Government reserves the right to move unused capacity between CLINs/performance periods as required by operational necessity and will move

2003 Job

OPTION ENVIRONMENTAL REMEDIATION SERVICES - 1YR

CPFF

Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite Quantity (IDIQ) for Environmental Remediation Services, Various Locations, Alaska. Period of Performance: Task orders for the Base Period may be awarded up to 3 years after date of contract award.. The contractor will be required to furnish all materials, equipment, and personnel necessary to manage and accomplish the job. Execute a full range of environmental remediation services including, but not limited to, investigations, studies, engineering support, remedial actions, and operation and maintenance activities related to Hazardous Toxic and Radioactive Waste (HTRW); contaminated soil, and contaminated groundwater. Requirements may be under the Formerly Used Defense Sites (FUDS) program or executed for military or non-military requirements. Task orders awarded are subject to the maximum burdened labor rates set forth in the contract.

CUMULATIVE AMOUNT OF TASK ORDERS AWARDED UNDER ALL

CONTRACTS IN THE IDIQ MATOC POOL SHALL NOT EXCEED $140M

FOR THE LIFE OF THE CONTRACT INCLUDING ANY OPTION

PERIOD(S). Awarded Contracts will share an estimated capacity of $4M for this CLIN total; however, the Government reserves the right to move unused capacity between CLINs/performance periods as required by operational necessity and will move capacity value from base period CLIN as needed if option years are exercised.

LABOR RATES FOR IDC

Base Period (3 Years)

Base Period FFP Ceiling Fully Burdened Hourly Rates – These are Firm-Fixed Price (FFP) Ceiling Fully Burdened Hourly Rates. The contractor may propose lower rates for any task order, but may not exceed these rates in task order proposals. Provide labor rate calculation chart from Section J in support of listed rates.

TABLE 1

Key Personnel

Basic Hourly Rate

Contract Year 1

Basic Hourly Rate Contract

Year 2

Basic Hourly Rate

Contract Year 3

Program Manager (Physically Located in Alaska) Project Manager (Physically Located in Alaska) Program Chemist Health & Safety Manager Environmental Engineer(s) Environmental Scientist(s) Design Engineer Site Superintendent

Escalation Factor Over Previous Year Rates NA % %

Non-Key Personnel Basic Hourly Rate Contract

Year 1

Basic Hourly Rate Contract

Year 2

Basic Hourly Rate Contract

Year 3 Site Safety and Health Officer Project Chemist Sampling Technician

Escalation Factor Over Previous Year Rates NA % %

Each Contract Year equates to one (1) calendar year from the date of contract (or option) award.

Per Diem shall be in accordance with the Joint Travel Regulations.

All other travel related costs shall be based on current competitive rates.

NOTE: The Government reserves the right to exercise any of the option years early. If any of the option years are exercised early, the labor rates from the year in which the option is exercised will apply, rather than the labor rates from the option year.

Base Period (3YRS) CPFF Ceiling Unburdened Hourly Rates These are CPFF Ceiling Unburdened Hourly Rates. The contractor may propose lower rates for any task order, but may not exceed these rates in its task order proposals.

TABLE 2

Key Personnel

Unburdened Basic Hourly Rate Contract

Year 1

Unburdened Basic Hourly Rate Contract

Year 2

Unburdened Basic Hourly

Rate Contract Year 3

Program Manager (Physically Located in Alaska) $ $ $ Project Manager (Physically Located in Alaska) $ $ $ Program Chemist $ $ $ Health & Safety Manager $ $ $ Environmental Engineer(s) $ $ $ Environmental Scientist(s) $ $ $ Design Engineer $ $ $ Site Superintendent $ $ $ Escalation Factor Over Previous Year Rates NA NA NA

Unburdened Basic Hourly Rate Contract

Year 1

Unburdened Basic Hourly Rate Contract

Year 2

Unburdened Basic Hourly Rate Contract

Year 3 Site Safety and Health Officer Project Chemist Sampling Technician

Escalation Factor Over Previous Year Rates NA NA NA

Each Contract Year equates to one calendar year from the date of contract (or option) award.

All other travel related costs shall be based on current competitive rates.

NOTE: The Government reserves the right to exercise any of the option years early. If any of the option years are exercised early, the labor rates from the year in which the option is exercised will apply, rather than the labor rates

Base Period (3YRS) Ceiling Indirect Rates

Ceiling Indirect Rates - These are maximum allowable rates and the Contractor may propose lower rates for any task order, but may not exceed these rates. When the Contractor's approved accounting system does not include or allow for these rates, the Contractor shall enter 0 (zero).

TABLE 3

Indirect Rate Rate Contract

Year 1 Rate Contract

Year 2 Rate Contract

Year 3

Subcontract Handling Charge Rate % % % Other Direct Costs* (ODC) Handling Charge Rate % % %

Labor Fringe % % % General & Administration (G&A) Rate % % % Other Indirect Costs __________ (identify & explain in proposal) % % % Other Indirect Costs __________ (identify & explain in proposal) % % % Other Indirect Costs __________ (identify & explain in proposal) % % % Other Indirect Costs __________ (identify & explain in proposal) % % % Other Indirect Costs __________ (identify & explain in proposal) % % %

*ODCs = Material, Equipment, Supplies

NOTE: The Government reserves the right to exercise any of the option years early. If any of the option years are exercised early, the labor rates from the year in which the option is exercised will apply, rather than the labor rates

Option Period 1 (1-Year)

Option #1 (1YR) Period FFP Ceiling Fully Burdened Hourly Rates – These are Firm-Fixed Price (FFP) Ceiling Fully Burdened Hourly Rates. The contractor may propose lower rates for any task order, but may not exceed these rates in task order proposals. Provide labor rate calculation chart from Section J in support of listed rates.

TABLE 4

Key Personnel Basic Hourly Rate Option #1 (1YR) Contract Year 4

Program Manager (Physically Located in Alaska) $ Project Manager (Physically Located in Alaska) $ Program Chemist $ Health & Safety Manager $ Environmental Engineer(s) $ Environmental Scientist(s) $ Design Engineer $ Site Superintendent $

Escalation Factor Over Previous Year Rates NA

Basic Hourly Rate Option #1 (1YR) Contract Year 4

Site Safety and Health Officer $ Project Chemist $ Sampling Technician $

All other travel related costs shall be based on current competitive rates.

NOTE: The Government reserves the right to exercise any of the option years early. If any of the option years are exercised early, the labor rates from the year in which the option is exercised will apply, rather than the labor rates

Option #1 (1YR) Period CPFF Ceiling Unburdened Hourly Rates These are CPFF Ceiling Unburdened Hourly Rates. The contractor may propose lower rates for any task order, but may not exceed these rates in its task order proposals.

TABLE 5

Key Personnel Unburdened Basic Hourly Rate

Option #1 (1YR) Contract Year 4

Program Manager (Physically Located in Alaska) $ Project Manager (Physically Located in Alaska) $ Program Chemist $ Health & Safety Manager $ Environmental Engineer(s) $ Environmental Scientist(s) $ Design Engineer $ Site Superintendent $

Unburdened Basic Hourly Rate

Option #1 (1YR) Contract Year 4

Site Safety and Health Officer $ Project Chemist $

All other travel related costs shall be based on current competitive rates.

NOTE: The Government reserves the right to exercise any of the option years early. If any of the option years are exercised early, the labor rates from the year in which the option is exercised will apply, rather than the labor rates

Option #1 (1YR) Period Ceiling Indirect Rates Ceiling Indirect Rates - These are maximum allowable rates and the Contractor may propose lower rates for any task order, but may not exceed these rates. When the Contractor's approved accounting system does not include or allow for these rates, the Contractor shall enter 0 (zero).

TABLE 6

Indirect Rate Unburdened Rate Option #1 (1YR) Contract Year 4

Subcontract Handling Charge Rate % Other Direct Costs* (ODC) Handling Charge Rate %

Labor Fringe % General & Administration (G&A) Rate % Other Indirect Costs __________ (identify & explain in proposal) % Other Indirect Costs __________ (identify & explain in proposal) % Other Indirect Costs __________ (identify & explain in proposal) % Other Indirect Costs __________ (identify & explain in proposal) % Other Indirect Costs __________ (identify & explain in proposal) %

*ODCs = Material, Equipment, Supplies NOTE: The Government reserves the right to exercise any of the option years early. If any of the option years are exercised early, the labor rates from the year in which the option is exercised will apply, rather than the labor rates

Option Period 2 (1-Year)

Option #2 (1YR) Period FFP Ceiling Fully Burdened Hourly Rates – These are Firm-Fixed Price (FFP) Ceiling Fully Burdened Hourly Rates. The contractor may propose lower rates for any task order, but may not exceed these rates in task order proposals. Provide labor rate calculation chart from Section J in support of listed rates.

TABLE 7

Key Personnel Basic Hourly Rate Option #2 (1YR) Contract Year 5

Program Manager (Physically Located in Alaska) $ Project Manager (Physically Located in Alaska) $ Program Chemist $ Health & Safety Manager $ Environmental Engineer(s) $ Environmental Scientist(s) $ Design Engineer $ Site Superintendent $

Basic Hourly Rate Option #2 (1YR) Contract Year 5

Site Safety and Health Officer $ Project Chemist $

All other travel related costs shall be based on current competitive rates.

NOTE: The Government reserves the right to exercise any of the option years early. If any of the option years are exercised early, the labor rates from the year in which the option is exercised will apply, rather than the labor rates

Option #2 (1YR) Period CPFF Ceiling Unburdened Hourly Rates These are CPFF Ceiling Unburdened Hourly Rates. The contractor may propose lower rates for any task order, but may not exceed these rates in its task order proposals.

TABLE 8

Key Personnel Unburdened Basic Hourly Rate

Option #2 (1YR) Contract Year 5

Program Manager (Physically Located in Alaska) $ Project Manager (Physically Located in Alaska) $ Program Chemist $ Health & Safety Manager $ Environmental Engineer(s) $ Environmental Scientist(s) $ Design Engineer $ Site Superintendent $

Unburdened Basic Hourly Rate

Option #2 (1YR) Contract Year 5

Site Safety and Health Officer $ Project Chemist $

All other travel related costs shall be based on current competitive rates.

NOTE: The Government reserves the right to exercise any of the option years early. If any of the option years are exercised early, the labor rates from the year in which the option is exercised will apply, rather than the labor rates

Option #2 (1YR) Period Ceiling Indirect Rates

Ceiling Indirect Rates - These are maximum allowable rates and the Contractor may propose lower rates for any task order, but may not exceed these rates. When the Contractor's approved accounting system does not include or allow for these rates, the Contractor shall enter 0 (zero).

TABLE 9

Indirect Rate Unburdened Rate Option #2 (1YR) Contract Year 5

Subcontract Handling Charge Rate % Other Direct Costs* (ODC) Handling Charge Rate %

Labor Fringe % General & Administration (G&A) Rate % Other Indirect Costs __________ (identify & explain in proposal) % Other Indirect Costs __________ (identify & explain in proposal) % Other Indirect Costs __________ (identify & explain in proposal) % Other Indirect Costs __________ (identify & explain in proposal) % Other Indirect Costs __________ (identify & explain in proposal) %

*ODCs = Material, Equipment, Supplies NOTE: The Government reserves the right to exercise any of the option years early. If any of the option years are exercised early, the labor rates from the year in which the option is exercised will apply, rather than the labor rates

Section C - Descriptions and Specifications

ENVIRONMENTAL REMEDIATION SERVICES (ERS) CONTRACT

ALASKA (VARIOUS LOCATIONS) AND USACE POD AOR

1.0 INTRODUCTION

1.1 The objective of this Multiple Award Task Order Contract (MATOC) for Environmental Remediation

Services (ERS) is to provide the U.S. Army Corps of Engineers (USACE) with the capability to execute a full range of environmental investigations, studies, engineering support, remedial designs, removal and remedial actions and operations and maintenance activities for the USACE customers. The ERS MATOC will support of a wide range of customers serviced by the USACE Alaska District. In addition to the Air Force and Army military stakeholders, USACE Alaska District customers can include U.S. Forest Service (USFS), U.S. Coast Guard (USCG), Federal Aviation Administration (FAA), National Oceanic and Atmospheric Administration (NOAA), Environmental Protection Agency (EPA), and Bureau of Land Management (BLM). The ERS MATOC IDIQ tool are anticipated to support various environmental programs within the USACE Alaska District, to include but not limited to the Formerly Used Defense Sites (FUDS) program, Air Force Installation Restoration (IRP), Air Force Environmental Quality (EQ), Army EQ, Army IRP, and Native American Lands Environmental Mitigation Program (NALEMP). The USACE Alaska District is part of the USACE Pacific Ocean Division (POD) which encompasses all areas covered by the U.S. Pacific Command (USPACOM); therefore, some work under this contract may be performed outside of Alaska but within the USACE POD area of responsibility (AOR).

Primary performance locations will be within the State of Alaska. Task Orders (TO) will be performance-based and may be issued as firm-fixed price (FFP), fixed price with economic price adjustment (FP-EPA) or cost plus fixed fee-completion form (CPFF-CF).

1.2 The technical requirements specified in this statement of work are intended to provide requirements for execution of the contract and a general understanding of the functions that the Contractor may be required to perform under individual task orders (TO). Each individual TO solicitation(s) will contain each project specific work requirements. The Contractor will receive from USACE Alaska District a complete scope of work or plans and specifications for each individual TO. The Contractor may also receive data that is available from prior investigations, designs or remedial actions such as preliminary assessments, site investigation, remedial investigation, risk assessment, and feasibility studies as appropriate.

1.3 The Contractor is required to furnish all labor, materials and equipment to provide environmental support at

ERS hazardous waste sites. The Contractor shall provide environmental support as required by each TO issued under this contract. The Contractor may be required to work at hazardous waste sites under the use, control or former use of the Federal Government or at which the Federal Government has been determined to be a generator or potentially responsible party (Note: Never applicable to a FUDS requirement). Further, the Contractor may be tasked to provide environmental support on non-Federally used/owned sites such as FUDS or Superfund National Priority List (NPL) sites.

1.4 Some TO(s) may include language that the Contractor shall work directly with regulators on some aspects of their work as directed by USACE. For a TO with this requirement, the Contractor shall be responsible for establishing and maintaining a good working relationship with these agencies. The regulatory agencies may have the authority to require any and all documents to be sent to the agency for work being performed under an individual TO but any direction for a USACE Task Order shall come through USACE to the Contractor. The USACE Alaska District may require review and comment actions on documents prior to or concurrent with the submission to regulatory agencies. The USACE Alaska District issued TO will specify any required meetings with regulatory agencies. Any correspondence between the Contractor and the regulatory agencies directly shall include copy to the USACE Alaska District TO COR.

1.5 Work issued under this contract will typically utilize service (Service Contract Act) wage rates. Depending on the scope of work, construction wage rates may be required and will be included in the individual task order as necessary.

1.6 For cost-reimbursement work, the Contractor shall agree to a negotiated cap on any indirect, fringe, and/or general and administrative overhead rates to be applied to work by the prime Contractor under this contract prior to being awarded any task order.

1.7 The Contractor shall comply with all provisions of the current edition of the U.S. Army Engineers Safety and Health Requirements Manual, EM 385-1-1. Contractor will find the manual at http://www.usace.army.mil/CESO/Pages/Home.aspx

1.8 The Contractor shall competitively procure subcontracts to the maximum extent practicable to ensure the best price for the Government. See FAR Clause 52.244-2, Subcontract, regarding Contracting Officer consent to procure subcontracts.

2.0 DESCRIPTION OF WORK

2.1 Engineering Support. The engineering efforts will be described in each individual TO and will depend on the requirements of the individual TO. Engineering efforts required may include preparing plans and specifications, report and decision document preparation, community outreach, chemical data review, preparation or maintenance of administrative records, stakeholder communications, risk assessment, remedial design, feasibility studies, project troubleshooting, construction inspection, and quality control testing.

2.2 Investigations, Studies and Field Activities. The contractor may be required to perform various investigation activities. The activities may include the following: drilling, soil vapor surveys, geophysical surveys (EM, GPR, Electrical Resistivity, and Seismic); well installations; instrumentation installations;

vadose zone fluid/air flow measurement; aquifer testing; sampling and analysis of soil, sediment, ground water, surface water, tank/drum contents, air, and other media; performing surface and borehole geophysics; excavation of test pits/trenches; sampling and testing of geotechnical materials;

ordnance/explosive avoidance; remedial investigations; feasibility studies; and pilot testing. Sampling and analysis for a wide variety of parameters may be required to determine the physical, chemical, biological, and radiological properties. Contract deliverables for investigations may include permanent or temporary field installations (i.e., monitoring wells), reports, logs, maps, drawings, and sketches. Analysis and interpretation of data shall be performed as appropriate to accomplish the intent of the individual TO.

Specific requirements will be included in each individual TO. Appropriate deliverables associated with each of these activities shall be prepared and submitted for approval as required per each TO.

2.3 Remedial Action. The requirements related to remedial action will be described in each TO. The

Contractor shall perform all necessary actions to address specific requirements of the TO. Remedial actions include containment, removal, treatment (on-site and off-site), transportation, and disposal. The entire spectrum of contaminants may be involved including hazardous, toxic, radioactive, biological, or any combination thereof. These contaminants may occur in multiple media including soils, sludges, liquids, air, water, debris, structures, and various containers.

2.3.1 Types of Remedial Activities. A wide variety of potential remedial activities could be expected in this contract. A number of these possible activities are included below; however, this list is not intended to be exhaustive. Innovative, new or emerging technologies, as they become available or applicable, may also be utilized during the term of this contract. The contractor shall have the expertise and capability to perform the following types of remedial actions:

Sampling and field or laboratory analysis of a wide variety of matrices such as the contents of tanks, drums and transformers, soil, sludge, solids, decontamination rinsates, water and groundwater, air, construction debris, and waste streams.

Testing, cleaning, removal, transportation, treatment and disposal of containers, underground and aboveground storage tanks (including abandonment in-place)

Treatment of hazardous and/or contaminated soil by bioremediation, soil washing, thermal incineration/desorption, immobilization, stabilization and other treatment technologies.

Construction, operation, and maintenance of groundwater and soil vapor extraction, treatment, and discharge systems (chemical, physical and biological) including air stripping, air sparging, bioventing, steam stripping, carbon absorption, ionization, ultraviolet violet oxidation, reverse osmosis, bioremediation, permeable reaction walls, and other technologies.

Removal, handling, and disposal of Polychlorinated Biphenyls (PCBs).

Removal of hazardous building components (equipment with nuclear sources, light fixtures and ballasts, asbestos insulation, etc.) and debris.

Removal, transportation and disposal of hazardous and/or contaminated soil, water or product.

Work area and perimeter air monitoring/sampling/analysis.

Sediment, soil and rock boring and sampling for chemical and geotechnical parameters.

Drilling, installation, development, and sampling of groundwater or soil vapor extraction, injection, and monitoring wells.

Innovative in-situ or ex-situ soil or groundwater investigation and clean-up technologies.

Construction of underwater sediment caps and associated activities.

Construction of landfill caps, slurry walls, slurry walls/subsurface barriers, and landfill closure activities.

Site or wetlands restoration.

Construction of support facilities including utilities, roads, decontamination facilities, and site project offices.

Preparation of general and site specific plans and reports.

Excavation, trenching, grading, and general site work.

Erosion control.

Upgrade, replacement and/or installation of equipment to allow compliance with Clean Air Act.

Installation and/or upgrade of groundwater treatment systems to reduce contaminants and/or naturally occurring substances.

2.4 Operation and Maintenance. Operation and Maintenance (O&M) may be required under this contract.

O&M activities may consist of preparation of O&M manuals, start-up and prove-out, trouble shooting existing systems, and O&M of existing operations. Typical systems or processes likely to be encountered are groundwater treatment systems, soil vapor extraction and treatment systems, bioventing, soil treatment processes and systems, waste storage areas, and other remedial activity, treatment system or process.

2.5 Compliance. The contractor may be required to perform compliance related environmental work.

Sampling and analysis for a wide variety of parameters may be required to determine the physical, chemical, and biological properties. Contract deliverables for investigations may include permanent or temporary field installations (i.e., monitoring wells), reports, logs, maps, drawings, and sketches. Analysis and interpretation of data shall be performed as appropriate to accomplish the intent of each TO. Specific requirements will be included in each TO. Appropriate deliverables associated with each of these activities shall be prepared and submitted for approval as required by the TO.

2.6 Work and services under this contract shall consist of any combination of Engineering, Investigation, Remediation, Operation & Maintenance and Compliance/Conservation activities and related tasks as described in the paragraphs above.

2.7 All chemical data generated under this contract shall meet the requirements of the DoD Department of

Energy Consolidated Quality System Manual (QSM) for Environmental Laboratories, Version 5.1.1 dated 2018 and any applicable federal, state or local requirements.

3.0 LICENSES, PERMITS, CERTIFICATIONS AND NOTIFICATIONS

3.1 The contractor shall be responsible for having or obtaining all necessary licenses, certifications and permits for the work described herein and in each TO. As a minimum, the contractor shall be responsible for the following:

a. Licensing and certification as required by State and Federal agencies and as required by the location of the project for performing all work specified herein and within the statement of work for each individual TO.

b. Permitting by federal and state agencies to transport restricted and/or hazardous wastes. Licensing by federal and state agencies, where applicable, for hazardous waste, asbestos, and lead-based paint contractors, blasters, etc.

c. Notifying and complying with all applicable agencies (fire department, EPA, water and air quality boards, borough or municipality environmental health department, emergency response, etc.) prior to performing work.

d. Compliance with all federal, state and local regulations.

e. Conducting all utility clearances and obtaining all digging permits prior to commencing any excavation, drilling, or other intrusive activities.

f. Notifying all appropriate local, state or federal agencies, as well as the Contracting Officer, prior to site closure in accordance with federal, state, or local regulations.

3.2 The Contractor shall register all nuclear testing devices brought onto federal property through the Nuclear

Regulatory Commission (NRC). This registration is in addition to any license or permit that may be required by the state or local laws.

4.0 GENERAL CONTRACT INFORMATION

4.1 This is a MATOC IDIQ award for the investigation and/or remediation of hazardous waste sites and/or construction of the items specified in an individual TO. This contract will be effective for a base period of three (3) years after receipt of Notice of Contract Award. At the discretion of the Government, there are two (2) 1-year option periods that may be exercised, making a possible total contract ordering period of five (5) years.

4.2 Delivery or performance shall be made only as authorized by each TO that is issued in accordance with contract FAR Clause 52.216-18, Ordering. The Contractor shall furnish to the Government, when and if ordered, work for the items specified in each individual TO. The Government may issue concurrent orders requiring delivery to multiple destinations or performance at multiple locations.

4.3 Any TO issued during the ordering period of this contract and not completed within the contract ordering period shall be completed by the Contractor within the time specified in the TO; however, no task order performance period shall extend more than five (5) years beyond the end of the IDIQ ordering period expiration. The Contract shall govern the Contractor and Government rights and obligations with respect to that TO performance period.

4.4 Unless an exception described in FAR 16.505(b)(2) applies, all awardees in the MATOC pool will be afforded fair opportunity to be considered for award of each order exceeding $3.5K in accordance with FAR 16.505(b)(1).

4.5 Commencement and Execution of Work. The Contractor shall be required to commence the work required by a TO at the time specified on the TO, execute the work, and complete the entire project not later than the completion time specified on the TO. The time stated for completion shall include final cleanup of the project site. Each individual TO may include requirements that must be met before on-site work can commence.

4 .6 Notice of Completion of TO. The Contractor shall notify the Government in writing upon completion of each individual TO. The Contractor shall give verbal and email advance notice to the Contracting Officer’s Representative (COR) on the project of the date the work will be fully completed and ready for final inspection. Notice shall be provided at least 30 days prior to the expected completion date.

5.0 Manual for Electronic Deliverables (MED): All deliverables required under each individual TO (reports, databases, figures, maps, etc) shall be in the formats outlined in the MED. MED requires data to be provided in standard formats that can be utilized more easily in the future. A copy of MED will be made available to each contract awardee. The selected firm must have the capability to provide survey-quality computer aided drafting (CAD) drawings in *.dwg format and all support files that conform to and are compatible with the USACE Alaska District CAD systems through the life of this contract, as appropriate.

This includes proficiency with U.S. National CAD Standards. The selected firm must also have the capability to provide geographic information systems (GIS) deliverables compatible with ArcGIS (ESRI) software. Proficiency with the following GIS files is expected: *.mxd files, shapefiles, geodatabases, coverages, and raster imagery, as appropriate. Proficiency with the following GIS work processes is expected: GPS field data collection and processing, datum and coordinate system transformation, geo-referencing and rectification, geodatabase development, Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE), and metadata preparation using Federal Geographic Data Committee (FGDC) standards.

6.0 Contractor Quality Control: Contractor Quality Control (CQC) is the means by which the Contractor ensures that all work, including that of subcontractors, complies with the contract (and each TO) requirement. The Contractor is responsible for quality control and shall establish an effective quality control system. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product acceptable to the USACE Alaska District. Each individual TO may require project-specific QC plans. Detailed CQC requirements will be specified in the TO scope of work.

7.0 TRANSPORTATION AND DISPOSAL

7.1 Transportation, Storage, Treatment and/or Disposal of Hazardous Materials. The Contractor shall ensure the transportation, storage, treatment, and disposal of all hazardous materials complies with all federal, state, and local laws and regulations. The Contractor shall identify and perform any additional analyses necessary to ensure compliance with transportation, storage, treatment, and disposal requirements.

Selection of the approved Treatment, Storage, or Disposal Facility (TSDF) shall be based upon cost effectiveness, compliance status, regulatory agency input and Contracting Officer approval. If the waste is sent for off-site storage or disposal, the Contractor shall provide all required documentation to the Contracting Officer.

7.2 Transportation. Transportation to an approved TSDF shall comply with all appropriate Federal, State, and local regulations. The Contractor shall coordinate the transportation of waste so that transporters arrive on schedule. When required for a TO, the Contractor shall provide the name, location, point-of-contact, EPA identification, and verification that the transporter is a licensed Hazardous Waste Transporter in accordance with DOT regulations and Notice of Violation (NOV) status.

7.3 Identification of the Disposal Facility. The Contractor shall characterize the waste stream to determine the most cost-effective TSDF facility that complies with federal, state and local laws and regulations.

7.4…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .